Sattva Songbird Phase 2 — Pre-Launch 2 & 3 BHK Apartments at Budigere Cross, Bangalore

Sattva Songbird Phase 2 is a pre-launch 4.33-acre, 381-apartment sub-parcel within Sattva Group's 12-acre Songbird master at Cheemasandra (Budigere Cross / Old Madras Road), East Bangalore. 2 BHK from ~₹1.82 Cr; 3 BHK from ~₹2.43 Cr. Karnataka RERA-registered; proposed completion June 2031.

Pre-Launch · From ₹1.82 Cr (indicative) 2, 3 BHK Apartments Cheemasandra, Budigere Cross, Bangalore Pre-Launch · New Project Possession: Proposed June 2031

Project Overview

Configuration 2, 3 BHK Apartments
Total Area 4.33 Acres (Phase 2)
Total Units 381 Apartments (Phase 2)
Starting Price Pre-Launch · From ₹1.82 Cr (indicative)
Possession Proposed June 2031
Availability Pre-Launch · New Project
Project Type High-Rise + Low-Rise (2 Towers + Amenity Block)
Developer Sattva Group
Location Cheemasandra, Budigere Cross, Bangalore
RERA Status Approved
RERA Number PRM/KA/RERA/1251/310/PR/270326/008557
Payment Plan Construction-Linked Plan
Number of Towers 2 Towers (Tower-05 & Tower-06) + 1 Amenity Block
Tower-05 B + G + 42 floors · 135.9m · 338 units
Tower-06 3B + G + 7 floors · 25.65m · 43 units
Wider Master Plan ~12 Acres · ~1,400 units across Phase 1 + Phase 2
FAR Sanctioned 2.997
Project Architect V. Narasimhan / Venkaraman Associates (est. 1986)
Structural Engineer Bellad Dinesh Kumar / Design Ventures
Main Contractor KEC International Limited (NSE/BSE listed, RPG Group)
Approving Authority BDA — Bangalore Development Authority
Plan Approval Date 27-02-2026
RERA Registration Registered 27-03-2026
Proposed Completion 27-06-2031 (5-year construction runway)
Total Project Cost ₹308.31 Cr (Phase 2)
RERA Acknowledgement ACK/KA/RERA/1251/310/PR/190326/010110
Get the complete cost sheet Stamp duty, registration, GST, club & floor-rise charges — the full breakup, no surprises.
Get Cost Sheet →

About the Project

Sattva Songbird is one of the largest privately developed master communities currently underway in East Bengaluru — a phased ~12-acre development at Cheemasandra Village (Budigere Cross / Old Madras Road) by Sattva Group. Phase 1 launched September 2024 with four towers and a wide unit mix (studio / 1 / 2 / 3 BHK plus 4 BHK row houses) totalling roughly 1,400 units across the wider master. Phase 2 — the subject of this listing — is a 4.33-acre sub-parcel registered with Karnataka RERA on 27 March 2026 (Registration No. PRM/KA/RERA/1251/310/PR/270326/008557) carrying 381 apartments across two towers and a dedicated amenity block.

Tower-05 is a 42-storey high-rise (B + G + 42, 135.9m height) with 338 apartments laid out 8 per floor across the upper stack. The mix is approximately one-third 2 BHK + 2T (Types A, A1, B, B1) and two-thirds 3 BHK + 2T (Types C through G with their 1-suffix upper-stack variants), with carpet areas spanning 73-97 sqm (~1,140-1,520 sft super built-up). Tower-06 is a low-rise 7-storey block (3B + G + 7, 25.65m) with 43 premium 3 BHK + 3T apartments (Types J, K, L, M, N, H), carpet areas 90-101 sqm (~1,530-1,580 sft SBUA) — the architecturally quieter format for buyers prioritising privacy over height. The Amenity Block is dedicated to Phase 2 with a 1,875 sqm main clubhouse and a 512 sqm satellite club for Tower-06 residents.

The architecture is by V. Narasimhan / Venkaraman Associates (a Bengaluru practice operating since 1986), with Design Ventures on structural engineering and KEC International (NSE/BSE-listed RPG Group company) as main contractor. Sattva Group has earmarked ₹308.31 Cr for Phase 2 alone (₹43.66 Cr land · ₹264.65 Cr construction). Per the RERA-mandated project schedule, earthworks and foundations run May 2026 to October 2027, super-structure RCC August 2027 to August 2030, finishing works through May 2031, with handover targeted for 27 June 2031 — a 5-year construction runway from RERA registration.

Price List

ConfigurationSizePriceAvailability
2 BHK + 2T (Type A1) — Tower-05 upper stack 795 sft carpet (~1,150 sft SBUA) From ₹1.82 Cr (indicative) Pre-Launch
2 BHK + 2T (Type A) — Tower-05 mid stack 785 sft carpet (~1,140 sft SBUA) From ₹1.85 Cr (indicative) Pre-Launch
2 BHK + 2T (Type B1) — Tower-05 upper stack 832 sft carpet (~1,205 sft SBUA) From ₹1.92 Cr (indicative) Pre-Launch
3 BHK + 2T (Type C1) — Tower-05 upper stack 985 sft carpet (~1,425 sft SBUA) From ₹2.43 Cr (indicative) Pre-Launch
3 BHK + 2T (Type D1) — Tower-05 upper stack 996 sft carpet (~1,440 sft SBUA) From ₹2.45 Cr (indicative) Pre-Launch
3 BHK + 2T (Type E1) — Tower-05 upper stack 1,036 sft carpet (~1,500 sft SBUA) From ₹2.50 Cr (indicative) Pre-Launch
3 BHK + 2T (Type F1) — Tower-05 upper stack 1,024 sft carpet (~1,485 sft SBUA) From ₹2.50 Cr (indicative) Pre-Launch
3 BHK + 2T (Type G1) — Tower-05 upper stack 1,049 sft carpet (~1,520 sft SBUA) From ₹2.55 Cr (indicative) Pre-Launch
3 BHK + 3T (Type J/K/L/M/N) — Tower-06 1,055 sft carpet (~1,530 sft SBUA) On Request Premium / Limited
3 BHK + 3T (Type H) — Tower-06 1,089 sft carpet (~1,580 sft SBUA) On Request Premium / Limited

GST & Other Charges

ChargeAmount / Rate
GST on Apartment Cost5% (no ITC) / 1% for affordable
Registration Charges1% of property value
Stamp Duty5% (Karnataka, above ₹45L) / 3% (₹21L–₹45L) / 2% (below ₹21L)
BESCOM & BWSSB DepositAs applicable, at actuals
Khata Registration2% of property value
Legal & DocumentationAt actuals
Maintenance Deposit12 months advance (refundable/adjustable)
Corpus FundOne-time, as per sale agreement
Club House ChargesIncluded / as applicable per unit
Car ParkingAs per sale agreement

* Charges are indicative; final amounts are confirmed at the time of booking and subject to applicable laws.

Check live availability & best unit picks Real-time inventory — floor, view, vastu, parking. Ask before someone else books your favourite.
Check Availability →

Floor Plans

Get the complete floor-plan deck (PDF) All variants — high-resolution PDFs with dimensions, balcony specs, and vastu orientation marked.
Send Me the PDFs →

Amenities

Main Clubhouse — 1,875 sqm
Satellite Clubhouse for Tower-06 — 512 sqm
Community Hall — 513 sqm
Indoor Sports Facility — 350 sqm
Outdoor Sports Facility — 5,176 sqm
Swimming Pool — 220 sqm
Gymnasium
Yoga / Aerobics Studio
Multipurpose Hall
Indoor Games Room
Children's Play Area
Toddler Play Zone
Landscaped Parks — 1,764 sqm
Jogging & Strolling Track
Tree Court & Open Lawns
Co-working Space
Creche
CCTV Surveillance
24/7 Manned Security
Power Backup for Common Areas, Lifts & Pumps
Piped Gas Connection
Two-Level Basement Parking (443 covered car parks)
Surface Visitor Parking (14 bays)
Sewage Treatment Plant (STP)
Rainwater Harvesting & Water Conservation
Solid Waste Management
Storm Water Drains
Use of Renewable Energy
Fire Detection & Fire-Fighting per BBMP / NBC

Location & Connectivity

Explore the area Bengaluru 85 more projects
Plan your visit
How far is Sattva Songbird Phase 2 — Pre-Launch 2 & 3 BHK Apartments at Budigere Cross, Bangalore from you?
  • ITPL — ~12 km via Whitefield Main Road
  • Bagmane Tech Park, CV Raman Nagar — ~14 km
  • RMZ Infinity, Old Madras Road — ~9 km
  • Brigade Tech Gardens, Whitefield — ~11 km
  • Manyata Tech Park (via ORR) — ~18 km
  • Bearys Research Centre / Hoskote industrial belt — within 6 km
  • Old Madras Road / NH-75 — ~1.5 km
  • Budigere Cross flyover — ~2 km
  • Outer Ring Road (Hoskote interchange) — ~5 km
  • Kadugodi / Whitefield Metro (Purple Line) — ~7 km
  • KR Puram Railway Station — ~10 km
  • Byappanahalli Metro Terminal — ~13 km
  • Kempegowda International Airport — ~20 km via NH-75 / STRR
  • Proposed Hoskote Metro extension — under planning
  • National Public School, Whitefield — ~10 km
  • DPS East Bangalore — ~8 km
  • New Baldwin International School — close by
  • Vibgyor High, Whitefield — ~10 km
  • Greenwood High International — ~12 km
  • Chris Canadian Global School — ~6 km
  • Surya College of Nursing — ~5 km
  • Manipal Hospital, Whitefield — ~10 km
  • Columbia Asia, Whitefield — ~9 km
  • Svastha Hospital — close by
  • MVJ Medical Research Centre — ~5 km
  • Sathya Sai Institute of Higher Medical Sciences — ~11 km
  • Park Square Mall, Whitefield — ~9 km
  • VR Bengaluru, Whitefield — ~10 km
  • Forum Shantiniketan Mall — ~8 km
  • Phoenix Marketcity, Mahadevapura — ~14 km
  • Big Bazaar, Hoskote — ~6 km
  • Daily-needs retail strip on Old Madras Road — within 2 km
  • Yellamma Lake — within 2 km
  • Hoskote Lake — ~6 km
  • Prestige Shantiniketan town centre — ~7 km
  • Ramanashree California Resort — ~3 km
  • Avalahalli Police Station — adjacent
  • Sattva Bliss — neighbouring Sattva development
  • Godrej Woodscapes — premium neighbour
  • Prestige Tranquility — established premium project (ready resale)
  • Brigade Calista Phase 1 — under construction
  • Shriram Greenfields — value-segment neighbour
See it in person — book a free site visit Pick a slot, we’ll arrange transport and the developer walk-through. No obligation, no brokerage.
Schedule Visit →

About the Developer

Sattva Group

Sattva Group — historically known as Salarpuria Sattva — was founded in 1986 by Mr. Bijay Agarwal and is headquartered in Bengaluru. The group has delivered over 152 projects across residential, commercial (including landmark IT parks like Sattva Knowledge City and Sattva Global City), retail, hospitality and aerospace, with 41 ongoing developments. Beyond construction, Sattva runs property management, facility management and consulting verticals — meaning Songbird buyers benefit from an in-house post-handover service network rather than an outsourced handoff. The group's commercial portfolio in Bengaluru gives it a structural advantage on tenant-quality benchmarks for residential developments in similar micro-markets.

Expert Review

BNP
BookNewProperty Editorial
Editorial Team

Sattva Songbird Phase 2 is structurally a long-runway play, not a ready-to-move buy. The development's scale (12-acre precinct, ~1,400 units in the wider master) is the single strongest argument for it — at this size, the project becomes its own micro-neighbourhood, with amenity depth, retail self-sufficiency and a resale liquidity pool that standalone competitors at Budigere Cross simply cannot match. The 5-year construction runway through June 2031 is also the historically highest-appreciation phase for premium Bengaluru launches.

For end-users who need a home before 2030, Phase 1 ready-to-move stock or other completed projects in the same micro-market (Prestige Tranquility, Prestige Glenwood) are more practical alternatives. For end-users on a 5-7 year horizon — relocation pipeline, parents trading up, NRIs returning — Phase 2 offers sub-₹2 Cr 2 BHK and sub-₹2.6 Cr 3 BHK in a 12-acre precinct with NH-75 frontage and a maturing metro story. For buyers genuinely deciding between Tower-05 and Tower-06, the calculus is straightforward: Tower-05 if you value views, lift-led density and the buzz of a high-rise community; Tower-06 if you want privacy, a quieter podium-level lifestyle, and the larger 3 BHK + 3T format that suits joint families.

For investors with a 5-7 year horizon, the entry-band 2 BHK at sub-₹2 Cr in a growth corridor with NH-75 frontage and an emerging metro story is one of the more defensible value propositions in East Bengaluru today. The Sattva brand and the scale of Phase 1 + Phase 2 together significantly de-risk the developer-execution variable. Forward 5-year capital appreciation is more likely 8-12% annual through the construction window (typical Bengaluru growth-corridor pattern) tapering to 4-7% post-handover, supported by Whitefield-Hoskote Road widening, NH-75 capacity additions and Whitefield Metro feeder maturation. Yield post-handover is likely 3.0-3.5% gross.

Trade-offs to take seriously: the 2031 horizon means 5+ years of construction-stage risk; pre-launch pricing is indicative until formal launch; Budigere Cross last-mile retail and metro are still emerging; and South Bengaluru workplaces are 30-35 km away. Verify floor plates and orientation against the RERA-filed plan before booking, and check the unit-mix-by-floor allocation — the lower 10 floors of Tower-05 carry the base typology while floors 11-42 carry the slightly larger '1'-suffix variants that command a premium. Track quarterly RERA milestone updates for the first 18 months. Benchmark against Brigade Calista (Budigere Cross under-construction) and Godrej Woodscapes (Budigere Cross under-construction) before committing.

Pros

  • Master-development scale — Phase 2 is one piece of a 12-acre, 1,400+ unit precinct, which means amenity depth, retail self-sustenance and resale-pool liquidity are structurally stronger than at standalone projects of comparable size in the corridor.
  • Genuine tower variety within the same community — high-rise (Tower-05 at 42 floors) and low-rise (Tower-06 at 7 floors) within the same Phase 2, allowing buyers to pick the format that matches their lifestyle without leaving the brand or location.
  • Sattva Group track record — 32+ years, 152 completed projects, and a CRISIL-rated commercial portfolio that adds tenant-quality discipline to Sattva's residential delivery standards. In-house property and facility management arms give post-handover service continuity.
  • Pricing entry-point — at the current ₹9,000-10,000/sqft micro-market band, the 2 BHK starts under ₹2 Cr, which is materially below most ORR / Whitefield 2 BHK launches at ₹13,000-16,000/sqft.
  • NH-75 / Old Madras Road frontage — direct access to Whitefield (~10-12 km), KR Puram (~10 km), Hoskote industrial belt and the airport via STRR; the 22 km Hoskote-Mylanahalli link road further improves last-mile.
  • RERA and BDA approved with a publicly listed contractor (KEC International) handling main construction; full RERA-era documentation trail.
  • 5-year construction runway (June 2031) — gives investors a 4-5 year construction window, historically the highest-appreciation phase for Bengaluru projects in growth corridors.
  • Construction-linked payment plan reduces upfront capital deployment and aligns buyer outflows with verified construction milestones.

Cons

  • Long completion horizon (June 2031) — owner-occupiers needing a home soon should evaluate Phase 1 ready stock or other ready-to-move alternatives in the corridor (Prestige Tranquility, Prestige Glenwood); capital deployment without occupation income for 5+ years is a real opportunity cost.
  • Budigere Cross is still developing — daily-needs retail, schools and healthcare are emerging rather than mature; expect continued construction noise from neighbouring projects (Brigade Calista, Godrej Woodscapes, Shriram Greenfields) over the next 3-4 years.
  • Metro is not at the doorstep — Kadugodi / Whitefield Purple Line is ~7 km away; daily metro commuters need a 15-minute last-mile leg until the proposed Hoskote extension materialises.
  • Tower-05 is genuinely tall (135.9m, 42 floors) — buyers concerned about service-lift dependency, water-pressure variation, or evacuation in a tall residential format should specifically inspect the lift redundancy and emergency stairwell capacity.
  • Pre-launch pricing is indicative — actual booking cards may differ from indicative numbers; verify allotment letter and price quotation in writing before remitting any token amount.
  • South Bengaluru workplaces are far — Electronic City and Sarjapur are 30-35 km drives; Songbird is best for buyers whose workplaces sit in the eastern half of the city or who work hybrid.
  • Pre-construction risk — foundations only begin May 2026 per RERA schedule; construction-stage risks (delays, cost overruns, design changes) are highest in the first 12-18 months. Track quarterly RERA updates for milestone adherence.
Want an unbiased second opinion? Talk to our advisor about whether Sattva Songbird Phase 2 — Pre-Launch 2 & 3 BHK Apartments at Budigere Cross, Bangalore fits your goal — self-use or investment, 5 vs 10 year horizon. Honest, no pressure.
Talk to Advisor →

Payment Plan

Construction-Linked Plan

Flexible milestone-linked payments aligned with project progress. Actual break-up is confirmed in the sale agreement.

10%
On Booking
Token / booking amount to reserve the unit.
10%
Agreement
Within 30–45 days of booking.
75%
Construction Linked
Paid as each slab / stage completes.
5%
On Possession
Balance paid at handover with other charges.
100%
Other Charges + GST
Statutory & infrastructure charges as applicable.

Investment Growth Potential

Current Price / sqft
₹9,800
Today's market rate
Expected in 5 Years
₹13,500
Projected valuation
Total Growth
37.8%
~6.6% CAGR
Gain / sqft
₹3,700
Absolute appreciation
Get the full investment analysis 5- and 10-year ROI projection, rental yield, exit liquidity — benchmarked against three comparable projects in the same micro-market.
Get Analysis →

EMI Calculator

PrincipalInterest
₹0
Monthly EMI
₹0
Total Interest
₹0
Total Payable

Visit the Project

Schedule a site visit at your convenience. We handle the transportation.

Book Site Visit

More About This Project

Sattva Songbird Phase 2 Tower-05 & Tower-06 Floor-Stack Notes

  • Tower-05 Floors 0-10 — base typology floor plates with Type A, B, C, D, E, F, G, H units (8 per floor)
  • Tower-05 Floors 11-42 — '1'-suffix upper-stack variants (Type A1, B1, C1, D1, E1, F1, G1) — same layouts with marginally larger carpet areas; these floors typically carry a price premium
  • Tower-05 lift bank — 3 lifts per tower (typical layout) + dedicated service lift
  • Tower-06 — only 6 units per typical floor; significantly lower density than Tower-05; all units 3 BHK + 3T with carpet 90-101 sqm; 2 covered car parks per unit (vs 1 in Tower-05); dedicated 512 sqm satellite clubhouse exclusive to this tower
  • Two-level basement parking — 443 covered car parks across Phase 2 plus 14 surface visitor parking bays
  • 1 covered car park per unit standard; 2 parks for Tower-06 premium 3 BHK + 3T units

Sattva Songbird Phase 2 Specifications: Structure & Construction

  • RCC framed structure designed for the 42-storey loading of Tower-05 and 7-storey Tower-06
  • Concrete-block masonry walls, plastered inside and outside
  • Weatherproofing applied to all wet areas, terraces and external facades
  • External finishes in textured paint with high-build emulsion on internal walls
  • Earthquake-resistant design per BNBC compliance

Sattva Songbird Phase 2 Specifications: Flooring & Joinery

  • Vitrified tile flooring in living, dining and bedrooms (premium import-grade in upper-stack units)
  • Anti-skid ceramic tiles in balconies, utility and bathrooms
  • Granite cladding in entrance lobbies and ground-floor common areas
  • Main door — engineered teak frame with veneered shutter and quality hardware
  • Internal doors — flush shutters on hardwood frames
  • External windows / balcony doors — UPVC frames with sliding shutters and mosquito mesh

Sattva Songbird Phase 2 Specifications: Kitchen, Bathrooms & Electrical

  • Provision for modular kitchen with granite counter and stainless-steel sink
  • Provision for chimney, hob, dishwasher and water purifier
  • Dedicated utility yard with washing machine point and drying space
  • Piped gas connection to every unit
  • Anti-skid ceramic flooring with full-height ceramic tile dado in bathrooms
  • EWCs and CP fittings of reputed brand; granite counter with vanity wash basin in master toilet; glass partition / shower panel in master toilet
  • Geyser provisions and concealed plumbing in false ceiling
  • Concealed copper wiring throughout with modular switches; BESCOM grid power per unit; 100% DG backup for lifts, common areas and pumps
  • Provision for in-unit AC across living and bedrooms; TV, data and phone points in living and master bedroom
  • Use of renewable energy in common areas per RERA filing

Sattva Songbird Phase 2 RERA Construction Schedule

  • Earthworks & foundations — May 2026 to Oct 2027
  • Sub-structure flooring — Dec 2027 to Nov 2030
  • Super-structure RCC — Aug 2027 to Aug 2030
  • Masonry & plastering — Dec 2027 to Feb 2031
  • Joinery (doors, windows, ventilators) — Mar 2028 to Dec 2030
  • Finishing works (electrical, plumbing, painting, fire-fighting) — Feb 2028 to May 2031
  • Internal & external landscape — Oct 2027 to Jun 2031
  • Proposed handover — 27 June 2031

Sattva Songbird vs Brigade Calista vs Godrej Woodscapes — Comparison

Buyers shortlisting at Budigere Cross / Old Madras Road typically compare Sattva Songbird Phase 2 against Brigade Calista (Budigere Cross under-construction) and Godrej Woodscapes (Budigere Cross under-construction). Headline differences as of April 2026:

  • Land parcel and scale: Sattva Songbird wider master is ~12 acres / ~1,400 units across Phase 1 + Phase 2; Phase 2 alone is 4.33 acres / 381 units. Brigade Calista is on ~10 acres with multiple towers. Godrej Woodscapes is on ~17 acres with a phased rollout.
  • Configuration ladder: Songbird Phase 2 offers 2 and 3 BHK (1,140-1,580 sft SBUA). Brigade Calista offers 2 and 3 BHK (1,078-1,664 sft SBUA per active listings). Godrej Woodscapes offers 2, 3 and 4 BHK at a wider format ladder.
  • Possession timeline: Songbird Phase 2 proposed handover June 2031 (5-year runway). Brigade Calista proposed handover Dec 2027 (~1.5-year runway from now). Godrej Woodscapes phased delivery 2027-2029 depending on tower.
  • Pre-launch / launch pricing (Apr 2026): Songbird Phase 2 indicative ~₹9,800/sqft; Brigade Calista active listings around ₹13,000-14,500/sqft; Godrej Woodscapes new launch ~₹9,500-11,500/sqft. Songbird is the most accessible per-sqft of the three but with the longest construction runway.
  • Tower format: Songbird Phase 2 has both high-rise (Tower-05 at 42 floors) and low-rise (Tower-06 at 7 floors) within the same precinct. Brigade Calista is high-rise-only. Godrej Woodscapes has multiple high-rise towers.
  • Brand: Sattva (private), Brigade (NSE-listed) and Godrej (NSE-listed) are all Tier-1 Bengaluru developers. For buyers prioritising publicly listed accountability, Brigade and Godrej have the edge; for buyers prioritising in-house property management continuity, Sattva has the edge through its in-house Sattva Property Management arm.
  • Bottom line: For sub-₹2 Cr 2 BHK in a 12-acre precinct with the longest construction-runway upside, Sattva Songbird Phase 2 is the right pick. For shorter handover timeline (Dec 2027) at a higher per-sqft, Brigade Calista is the alternative. For a wider format ladder including 4 BHK and a phased delivery between 2027-2029, Godrej Woodscapes offers the breadth Songbird and Calista do not.

Sattva Songbird Phase 2 Pre-Launch Buyer Due Diligence Checklist

  • Verify Karnataka RERA registration on the official portal: PRM/KA/RERA/1251/310/PR/270326/008557
  • Confirm BDA plan sanction details (Plan No. BaAPr/NaMa/AaSa/AA-2/TaSa-3/Ou/42/2025-26)
  • Get the indicative price quoted in writing before remitting any token amount; verify the construction-linked payment milestone schedule
  • Verify the specific tower (Tower-05 or Tower-06), floor band, unit number and orientation against the RERA-filed inventory schedule
  • Confirm the carpet vs super built-up area distinction (RERA mandates carpet as the regulated area; super built-up is loaded ~1.45x)
  • Track quarterly RERA milestone updates for construction adherence; cross-reference with the published RERA project schedule
  • Confirm bank loan eligibility with at least two underwriters; pre-launch projects typically take 30-60 days for bank approval
  • Engage qualified legal counsel for the parent-document trail review and the agreement-to-sell template before signing
  • Verify GST applicability (under-construction units carry 5% GST without ITC; 1% for affordable housing where applicable) and stamp duty rates

Security & Common Services

  • Manned gated entry with security cabin and visitor management system
  • CCTV at entrance, lobbies, lift cars, basement and ground-level common areas
  • Intercom in every unit connecting security and concierge
  • STP, rainwater harvesting, solid waste management per RERA filing
  • Water source — borewells (RERA-disclosed); supplemented by BWSSB provision where applicable
  • Fire-detection and fire-fighting per BBMP / NBC compliance

Frequently Asked Questions

What is the price of a 2 BHK in Sattva Songbird Phase 2?

As of April 2026, indicative pre-launch 2 BHK + 2T prices in Sattva Songbird Phase 2 start from approximately ₹1.82 Cr for the Type A1 (~1,150 sft SBUA) and go up to ~₹1.92 Cr for the Type B1 (~1,205 sft SBUA), referencing the publicly disclosed Phase 1 launch band. The Budigere Cross / Old Madras Road micro-market currently trades in the ₹8,800-10,500 per sqft band for new high-rise launches; Songbird is positioned at the upper end given the master-development scale and Sattva brand. Specific booking cards are confirmed at the formal Phase 2 launch — verify in writing before any token remittance.

What is the price of a 3 BHK in Sattva Songbird Phase 2?

Sattva Songbird Phase 2 indicative 3 BHK pre-launch prices as of April 2026: Tower-05 3 BHK + 2T from ~₹2.43 Cr (Type C1 at ~1,425 sft SBUA) up to ~₹2.55 Cr (Type G1 at ~1,520 sft SBUA). Tower-06 premium 3 BHK + 3T (Types J/K/L/M/N/H, 1,530-1,580 sft SBUA) is on-request pricing and positioned at a premium given the lower-density low-rise format and 2 covered car parks per unit. Indicative pricing references the Phase 1 launch band; verify in writing at formal Phase 2 launch.

What is the floor plan of Sattva Songbird Phase 2?

Sattva Songbird Phase 2 has two towers with distinct floor-plate formats. Tower-05 is a 2 Basement + Ground + 42 floor high-rise with 8 units per typical floor; Floors 0-10 carry the base typology (Types A/B/C/D/E/F/G/H), Floors 11-42 carry the '1'-suffix upper-stack variants (Types A1/B1/C1/D1/E1/F1/G1) with marginally larger carpet areas. Tower-06 is a 3 Basement + Ground + 7 floor low-rise with 6 units per typical floor, all 3 BHK + 3T (Types J/K/L/M/N/H, carpet 90-101 sqm). Buyers should request the specific floor plan for the tower, floor and unit under consideration before committing.

How does Sattva Songbird compare with Brigade Calista?

Both are Budigere Cross / Old Madras Road under-construction high-rise communities by NSE-listed Tier-1 (Brigade) or major regional (Sattva) developers. Sattva Songbird Phase 2 is on a 4.33-acre Phase 2 footprint within a wider 12-acre, ~1,400-unit master; proposed handover June 2031 (5-year runway); indicative pre-launch ~₹9,800/sqft. Brigade Calista is on ~10 acres; proposed handover Dec 2027 (~1.5-year runway from now); active listing ~₹13,000-14,500/sqft. Songbird wins on master-development scale, lower per-sqft entry, and the longer construction-runway capital-appreciation upside; Brigade Calista wins on shorter handover timeline, NSE-listed developer accountability and active resale liquidity in the under-construction segment. For 5-7 year hold horizon and lower entry ticket, Songbird is the right pick; for sub-2-year handover and immediate post-handover yield, Brigade Calista is the alternative.

What is the expected rental yield in Sattva Songbird Phase 2 post-handover?

Post-handover (2031+) gross rental yield is expected in the 3.0-3.5% range — in line with the broader Bengaluru benchmark and consistent with the Budigere Cross / Old Madras Road tenant pool drawing from Whitefield IT, ITPL, Hoskote industrial and corridor-corporate workers. Indicative post-handover 2 BHK rentals will likely run ~₹48-58K monthly and 3 BHK ~₹58-72K monthly based on 2026 corridor benchmarks adjusted for inflation. Investors should underwrite yield-plus-modest-capital-gain rather than rapid post-handover re-rating. Verify rental band assumptions against current market data closer to handover.

Is Sattva Songbird Phase 2 a good investment in 2026?

For investors with a 5-7 year horizon, the entry-band 2 BHK at sub-₹2 Cr in a 12-acre master with NH-75 frontage and an emerging metro story is one of the more defensible value propositions in East Bengaluru today. The 5-year construction runway through June 2031 has historically been the highest-appreciation phase for premium Bengaluru launches; forward 5-year capital appreciation is likely 8-12% annual through the construction window, tapering to 4-7% post-handover. The Sattva brand and the scale of Phase 1 + Phase 2 together significantly de-risk the developer-execution variable. For end-users who need a home before 2030, Phase 1 ready stock or other completed projects in the same micro-market (Prestige Tranquility, Prestige Glenwood) are more practical alternatives. Verify pricing and milestone tracking before remitting any token; track quarterly RERA updates for the first 18 months.

Where exactly is Sattva Songbird located?

Sattva Songbird sits at Survey No. 15/1, 15/2, 15/3 and 15/5, Cheemasandra Village, Bidarahalli Hobli — on Budigere Road off NH-75 (Old Madras Road), Bengaluru 560049. The site has direct main-road frontage and is roughly 7 km from Kadugodi / Whitefield metro, ~10-12 km from the Whitefield IT corridor and ~20 km from Kempegowda International Airport via NH-75 / STRR.

How is Phase 2 different from Phase 1?

Phase 1 (RERA PRM/KA/RERA/1251/446/PR/060924/007008, registered September 2024) covers four towers and a wider unit mix — studio, 1, 2 and 3 BHK apartments plus 4 BHK row houses on a 4-acre estate. Phase 2 (this listing, RERA PRM/KA/RERA/1251/310/PR/270326/008557, registered March 2026) is a separate 4.33-acre sub-parcel comprising Tower-05 (B+G+42 high-rise with 338 apartments in 2 / 3 BHK mix) and Tower-06 (low-rise 7-storey block with 43 premium 3 BHK + 3T apartments), plus a dedicated amenity block. Phase 2 buyers share community-scale amenities with Phase 1 residents while having their own dedicated 1,875 sqm clubhouse plus a 512 sqm satellite club for Tower-06.

What configurations and unit sizes does Phase 2 offer?

Tower-05 carries a mix of 2 BHK + 2T units (carpet 73-95 sqm / ~1,140-1,205 sft super built-up) and 3 BHK + 2T units (carpet 90-97 sqm / ~1,425-1,520 sft SBUA), arranged in upper-stack '1'-suffix variants for floors 11-42 and base typologies for floors 0-10. Tower-06 carries only 3 BHK + 3T premium homes with carpet areas of 90-101 sqm (~1,530-1,580 sft SBUA). 4 BHK row houses are part of Phase 1, not Phase 2.

Is Sattva Songbird Phase 2 RERA approved?

Yes. Phase 2 is registered with Karnataka RERA under registration number PRM/KA/RERA/1251/310/PR/270326/008557, with acknowledgement number ACK/KA/RERA/1251/310/PR/190326/010110. The project was registered on 27 March 2026 with proposed completion of 27 June 2031. The plan was sanctioned by BDA on 27 February 2026. Buyers should always verify status directly on the Karnataka RERA portal before transacting.

When will Phase 2 be ready for possession?

The RERA-mandated proposed completion date is 27 June 2031. Per the RERA project schedule, sub-structure work runs through 2026-2027, super-structure RCC through 2027-2030, finishing works through 2028-2031, with handovers commencing thereafter. Buyers planning to occupy in the next 3-4 years should look at Phase 1 ready inventory or other ready-to-move alternatives in the Budigere Cross / Whitefield corridor.

Should I pick Tower-05 (high-rise) or Tower-06 (low-rise)?

Tower-05 (B+G+42, 135.9m) is the high-rise option — best for buyers who value skyline views, the energy of a tall residential community, and the broader unit-mix flexibility (2 and 3 BHK both available). Floors 11-42 carry the slightly larger '1'-suffix variants and typically command a premium. Tower-06 (3B+G+7, 25.65m) is the low-rise option — only 43 units across 7 floors, all 3 BHK + 3T premium homes with two car parks each and a dedicated 512 sqm satellite clubhouse. It suits joint families, senior citizens, and buyers prioritising privacy and a podium-level lifestyle over height. Both share the main 1,875 sqm clubhouse and Phase 2 amenity block.

Who designed and is building Sattva Songbird Phase 2?

The architectural design is by V. Narasimhan / Venkaraman Associates, a Bengaluru practice operating since 1986 (registered with the Council of Architecture as BCCL/BL-3/3.6/A-0042/21-22). Structural engineering is by Bellad Dinesh Kumar / Design Ventures, established 2009. The main construction contractor is KEC International Limited, a publicly listed RPG-Group company headquartered in Mysore that has handled large-format infrastructure builds since 2005. Project chartered accountants are MOJ Associate (Avneep L. Mehta).

How is Budigere Cross / Cheemasandra as a residential location?

Budigere Cross has emerged as one of East Bengaluru's fastest-growing residential corridors, anchored by a cluster of large-format launches by Sattva, Prestige, Brigade, Godrej, Shriram and Disha. The location offers direct NH-75 frontage to Whitefield (~10-12 km), KR Puram (~10 km) and Hoskote (industrial belt), with airport access via NH-75 and the upcoming STRR. Day-to-day infrastructure (schools, hospitals, retail) is improving but still emerging — most residents currently rely on Whitefield amenities for premium retail and healthcare. Metro proximity is the main remaining gap, with the Hoskote extension under planning.

What amenities does Phase 2 offer?

Phase 2 has a dedicated amenity programme: a 1,875 sqm main clubhouse (gym, indoor sports, multipurpose hall), a 512 sqm satellite clubhouse for Tower-06 residents, a community hall, swimming pool, indoor games, co-working space, creche, yoga / aerobics studio, 5,176 sqm of outdoor sports facility, 1,764 sqm of landscaped parks, jogging tracks, children's play areas, piped gas, two-level basement parking (443 covered + 14 surface), STP, rainwater harvesting, CCTV-monitored 24/7 security, and 100% backup for common areas.

Still have a question we didn’t answer? Drop your number — one of our advisors will call within 30 minutes with the specific answer you need.
Get a Callback →

Latest Updates

  • 30 Apr 2026
    Phase 2 — pre-launch inventory live
    Phase 2 (Tower-05 and Tower-06, plus dedicated amenity block) is open for pre-launch booking with construction commencing May 2026 per the RERA project schedule. Indicative pre-launch pricing references the Phase 1 launch band: 2 BHK from ~₹1.82 Cr; 3 BHK from ~₹2.43 Cr.
  • 27 Mar 2026
    Phase 2 RERA registration
    Registered with Karnataka RERA on 27 March 2026 under registration number PRM/KA/RERA/1251/310/PR/270326/008557. Total project cost certified at ₹308.31 Cr (land ₹43.66 Cr + construction ₹264.65 Cr).
  • 27 Feb 2026
    Phase 2 BDA plan sanction
    BDA sanctioned the Phase 2 building plan on 27 February 2026 (Plan No. BaAPr/NaMa/AaSa/AA-2/TaSa-3/Ou/42/2025-26) with FAR 2.997.
  • 15 Sep 2024
    Phase 1 launch
    Phase 1 launched September 2024 with four towers and a mixed inventory (studio / 1 / 2 / 3 BHK + 4 BHK row houses) under RERA registration PRM/KA/RERA/1251/446/PR/060924/007008.
Get Pre-Launch Alerts Be the first to know about new launches & price revisions.

Similar Projects Nearby

Other projects you might like in Cheemasandra, Budigere Cross, Bangalore

See all in Bengaluru

Explore More on BookNewProperty

Continue your search with these related projects, locations and topics.

Enquire About Sattva Songbird Phase 2 — Pre-Launch 2 & 3 BHK Apartments at Budigere Cross, Bangalore

Get a callback within 30 minutes with pricing & availability.

Secure 30 min callback No spam