Casagrand Vybe · Gagan Pahad, West Hyderabad

Casagrand’s 35-acre villa community at Gagan Pahad, Rajendranagar — 362 G+2 villas in 3, 4 & 5 BHK formats with 93 amenities and dual 40,000 sft clubhouses. Telangana RERA P02400010759 (03 Apr 2026). Possession 03 April 2029.

It is a new launch project offering 3, 4, 5 BHK villas from ₹3.20 Cr, with possession due in April 2029. Its RERA registration number is P02400010759 (Telangana RERA · GHMC BP No. 3380/GHMC/SWDL/RINI/2026).

Casagrand Vybe Banner
4 Photos
1 / 4

Casagrand Vybe Overview

Verified by Vikash S on
Project Name
Casagrand Vybe
Developer
Casagrand
Location
Gagan Pahad
Property Type
Villas
Project Type
Standalone Project
Starting Price
₹3.20 Cr
Configuration
3, 4, 5 BHK Villas
Project Status
New Launch
Possession
April 2029
Availability
New Launch (147 of 362 sold per developer)
Payment Plan
Construction Linked Plan
RERA Status
Approved
RERA Number
P02400010759 (Telangana RERA · GHMC BP No. 3380/GHMC/SWDL/RINI/2026)
Promoter
Casagrand Beacon Private Limited (Special Purpose Vehicle — parent Casagrand Group)
Promoter GSTIN
36AAKCC4128Q1Z5
Promoter Past Experience (RERA)
No past experience disclosed by this entity (SPV; broader Casagrand Group has 22+ years in Chennai, entered Hyderabad in 2023)
Telangana RERA Number
P02400010759
GHMC Building Permit
BP No. 3380/GHMC/SWDL/RINI/2026
GHMC Plan Approval
006567/GHMC/03140/SWDL/CHR1/2025
Authority
GHMC (Greater Hyderabad Municipal Corporation)
RERA Approval Date
03 April 2026
Proposed Completion (RERA)
03 April 2029 (36-month build)
Project Type (RERA)
Residential
MSB or High-Rise (RERA)
No (G+2 villas)
Litigations (RERA)
No litigation against this project disclosed
Promoter Land-Owner / Investor
No third-party land-owner or investor disclosed (promoter holds the land)
Survey Numbers
Sy. No. 105/A/1, 106/1, 107, 109/1 — Gagan Pahad village
Boundaries
East: Sy No. 33 · West: 12m existing road · North: Sy No. 105 part · South: Sy No. 109 part
Total Land Area (Gross)
143,580.49 sqm (~35.48 acres)
Area Affected by Setbacks
26,266.47 sqm (~6.49 acres) — road widening, FTL of tanks, nala widening
Net Developable Area
117,314.02 sqm (~28.99 acres)
Approved Built-Up Area
108,570.58 sqm
Mortgage Area
3,288.81 sqm
Total Approved Building Units
364 villas (362 villas + 2 clubhouses)
Building Classification (RERA)
All approved as “4BHK 4T G Plus 2” (Ground + 2 floors); brochure unit plans confirm inventory mix of 3, 4 & 5 BHK typology variants
Covered Parking
362 covered parking units (one per villa, with most types accommodating 2 cars)
Solid Waste Management (RERA)
Disclosed as NO / NA in Development Work table — verify with developer
Energy Management (RERA)
Disclosed as NO / NA in Development Work table — verify with developer
Aggregate Recreational Open Space (RERA)
Disclosed as NO / NA — brochure references 71% open space across site; reconcile with developer
Collection Account (100%)
ICICI Bank Ltd, Kothaguda branch (IFSC ICIC0001769)
Separate Account (70%)
ICICI Bank Ltd, Kothaguda branch (IFSC ICIC0001769)
Transaction Account (30%)
ICICI Bank Ltd, Kothaguda branch (IFSC ICIC0001769)
Architect
K P Lenin (named in project filings)
Structural Engineer
J Suresh
Address
Gagan Pahad, Rajendranagar Mandal, Ranga Reddy District, Telangana – 500052
Brochure & Details
Get the Casagrand Vybe Brochure & Instant Details

Download the full brochure or get quick answers on WhatsApp.

About Casagrand Vybe

Casagrand Vybe is Casagrand Group’s largest residential venture in Hyderabad to date — a 35-acre gated villa community in Gagan Pahad village, Rajendranagar Mandal, Ranga Reddy District. The project comprises 362 G+2 villas plus two grand clubhouses (364 total approved building units per the Telangana RERA filing), arranged across a master plan organised into four residential pockets. Telangana RERA registration is P02400010759, approved on 03 April 2026, with the corresponding GHMC Building Permit number 3380/GHMC/SWDL/RINI/2026 (plan approval reference 006567/GHMC/03140/SWDL/CHR1/2025). The proposed date of completion per RERA is 03 April 2029, giving the project a 36-month construction window from approval. Casagrand entered the Hyderabad market in 2023 and this is the company’s fifth Hyderabad launch in 2026, taking aggregate new-launch pipeline in the city to ~3.98 million sft.

The RERA filing discloses total land area of 143,580.49 sqm (~35.48 acres) gross, of which 26,266.47 sqm (~6.49 acres) is affected by road-widening, FTL-of-tanks and nala-widening setbacks, leaving 117,314.02 sqm (~28.99 acres) of net developable land. Approved built-up area is 108,570.58 sqm. The site is bounded by Survey No. 33 on the east, a 12-metre existing road on the west, Survey No. 105 (part) on the north, and Survey No. 109 (part) on the south. Casagrand has filed every villa individually with a tasks-and-activities schedule against a 10-stage construction roadmap (excavation, basement & plinth, podiums, stilt floor, super-structure slabs, internal works, fittings, staircases & lifts, external plumbing & elevation, common-area systems & OC compliance).

RERA, financial & legal status

The promoter of record is Casagrand Beacon Private Limited (GSTIN 36AAKCC4128Q1Z5), a Special Purpose Vehicle whose RERA-declared past experience field is “No” — meaning the SPV entity has not delivered any prior project, though the broader Casagrand Group has a 22+ year track record (predominantly in Chennai, where Casagrand has been ranked No.1 for 8 consecutive years per CBRE 2024). No litigations are disclosed against this project. No third-party land-owner or investor is disclosed under the Promoter Land-Owner / Investor category. The project uses the standard Telangana RERA three-account escrow structure with ICICI Bank Kothaguda branch (IFSC ICIC0001769): a Collection Account holding 100% of receipts, a Separate Account holding 70% (the RERA-restricted construction-cost portion), and a Transaction Account holding the remaining 30% (developer-operating funds).

Master plan, villa typology and product features

The brochure positions Vybe primarily as a 5 BHK villa community (with starting price band of ₹3.20-4.86 Cr per the Casagrand website), but the actual inventory composition is mixed. The brochure’s unit-plan pages disclose: one 3 BHK typology variant (Type 12, carpet 2,083 sft / saleable 2,403 sft); twelve distinct 4 BHK typology variants (Types 1, 1A, 1B, 1C, 1D, 2, 2A, 2B, 5, 6, 7, 8, 9, 9A, 10, 11, 13 — with carpet areas ranging from 2,629 to 3,937 sft and saleable areas 3,121 to 4,558 sft); and five 5 BHK typology variants (Types 3, 4, 4A, 4B, 5A — carpet 3,562 to 4,273 sft and saleable 4,143 to 5,201 sft). The Telangana RERA filing classifies all 364 buildings uniformly as “4BHK 4T G Plus 2” (4 BHK, 4 toilet, Ground + 2 storey) under the Building Details schedule, which captures the dominant configuration rather than enumerating each typology variant.

Every villa is Vaastu-compliant with east, west or north-facing main entrance, southwest-facing master bedroom, southeast-facing kitchen, east-facing hob, and toilets oriented either north or south. Each villa includes a 21-foot-wide master suite with dedicated walk-in dresser and a 9-foot-wide en-suite bathroom; a dedicated home theatre on the second floor (with projector provision); a 16-foot-long combined living-dining opening onto a 5-foot-wide backyard; a 9-foot-10-inch floor-to-ceiling glass-window cross-ventilated layout; and a wide open terrace with BBQ counter provision. Premium villas (Types 4, 4A, 4B, 5, 5A, 6) offer 650 sft private backyards. Common specifications include Italian marble flooring in living-dining, premium vitrified tiles in bedrooms, Kohler fittings throughout, face-recognition digital door locks, an exclusive 20-amp EV charging point per villa, 100% DG power backup with up to 5 kW solar provision per villa, and centralised STP / WTP.

Amenities and clubhouses

The brochure enumerates 93 indoor + outdoor amenities organised across six themes (Sports & Wellbeing, Kids, Swimming Pool, Features, Entertainment, Themed Gardens) plus dual clubhouses spanning 40,000 sft total. Clubhouse 1 is a 5-storey structure with a stilt parking floor, ground-level lobby and association room, first-floor multipurpose hall plus kids’ indoor play (ball pool with slide, lego wall, toy track, kids’ lounge, pendulum swing, mini Ferris wheel, hit-mouse, tunnel play), second-floor business centres (x2) plus conference room plus squash court, third-floor hammam bath plus indoor games (billiards, air hockey, foosball, street basketball, shuffle board, sub-soccer, board games), fourth-floor mini theatre plus dance / music / FMS rooms, and a terrace-level 3,600 sft swimming pool with separate adult and kids zones, lounge cabana and refreshment counter. Clubhouse 2 is a 4-storey structure with stilt parking plus cricket practice net, first-floor gaming arcade (video games, VR gaming, alien gun shooting, need-for-speed) plus mini golf plus table tennis plus foosball, second-floor CrossFit interactive gym plus yoga / meditation room, third-floor learning centre plus toy car track plus interactive sensory games plus sauna plus salon (hair styling, pedicure / manicure), fourth-floor multipurpose hall plus billiards plus board games, and a terrace-level sunset deck plus rooftop grilling pavilion plus cabana plus sky cinema plus terrace cafeteria.

Who it’s for

Vybe targets the upper-mid Hyderabad villa buyer — primarily senior IT / consulting / banking professionals at Gachibowli / Financial District / HITEC City / Madhapur / Kondapur, who want a 4-5 BHK G+2 villa product within ~20-30 minutes of work but at a price tier 30-40% below the established Kokapet / Nanakramguda apartment market. The starting band of ₹3.20 Cr (likely a 4 BHK Standard) is competitive against Casagrand Belair (Gowdavalli, ₹3.86-4.51 Cr, 4 BHK 3810-4451 sft, ₹10,125/sqft, 9.25 acres, 81 units, RERA P02200009521) and against Ramky Codename Rajendranagar, Dev Signature One, and The Prestige City. The 5 BHK Grand inventory at ₹3.80-4.86 Cr competes directly with established Kondapur / Tellapur villa stock. Approximately 147 of 362 units have been sold as of early May 2026 per Casagrand’s own project page — ~40% pre-launch absorption in the first month, which is meaningful velocity for a 35-acre new launch.

Casagrand Vybe Price List

Home typeSize (saleable)Usable (carpet)PriceAvailability
3 BHK (Type 12, north-facing) Carpet 2,083 sft · Saleable 2,403 sft · Land 1,374 sft — ₹1.80–2.00 Cr (indicative, not separately published) Limited (1 typology)
4 BHK Standard (Types 1, 1A, 1B, 1C, 1D, 2, 2A, 2B, 8, 10, 11) Carpet 2,766–2,822 sft · Saleable 3,262–3,288 sft · Land 1,823–2,358 sft — ₹2.50–3.20 Cr (indicative) Available
4 BHK Premium (Type 5, 6 — large-plot variants) Carpet 3,880–3,937 sft · Saleable 4,495–4,558 sft · Land 2,630 sft — ₹3.20–3.80 Cr (indicative) Available
4 BHK Premium (Types 7, 9, 9A, 10 — corner / large-frontage) Carpet 2,656–3,144 sft · Saleable 3,121–3,609 sft · Land 1,880–3,416 sft — ₹2.80–3.60 Cr (indicative) Limited
5 BHK Grand (Type 3, east-facing — Casagrand’s flagship) Carpet 4,149 sft · Saleable 5,055 sft · Land 3,223 sft — ₹3.80–4.50 Cr (indicative) Available
5 BHK Grand (Type 4, 4A, 4B, west-facing variants) Carpet 4,218–4,273 sft · Saleable 5,054–5,201 sft · Land 3,037–3,223 sft — ₹3.80–4.86 Cr (developer top-of-band) Limited
5 BHK Grand (Type 5A, west-facing premium) Carpet 3,562 sft · Saleable 4,143 sft · Land 2,475 sft — ₹3.50–4.20 Cr (indicative) Limited
Official Documents
Download Price List & Cost Sheet

Unit-wise pricing and the complete cost breakup, sent instantly to your phone.

GST & Other Charges

Charge Rate Details
GST on Apartment Cost 5% (no ITC) 1% for affordable housing (≤ ₹45L, ≤ 60 sqm carpet).
Registration Charges 1% Of property value, paid at the Sub-Registrar office.
Stamp Duty ~7.5% Telangana: 4% stamp duty + 1.5% registration + ~0.5% transfer charges.
TGSPDCL & HMWSSB At actuals Electricity and water connection deposits, as applicable.
Mutation (GHMC) At actuals Recorded with GHMC / local body for ownership records.
Legal & Documentation At actuals Legal vetting, agreement drafting, sale-deed preparation.
Maintenance Deposit 12 months Advance maintenance, refundable or adjustable.
Corpus Fund One-time As per the sale agreement — society reserve fund.
Club House Per unit Included in base price or charged separately by the developer.
Car Parking Per slot As per the sale agreement — covered or open slot.

Note: Charges are indicative; final amounts are confirmed at the time of booking and subject to applicable laws, project location, and unit specifications.

Casagrand Vybe Review: Is It a Good Buy?

VS
Reviewed by
Project Reviewer · BookNewProperty · Verified
4.3 out of 5 10 Pros · 10 Cons

Vybe is Casagrand’s largest Hyderabad bet to date: 35 acres, 362 G+2 villas, 93 amenities, dual 40,000 sft clubhouses, ₹3.20-4.86 Cr band, 36-month build to 03 Apr 2029. Telangana RERA P02400010759 approved 03 Apr 2026 with full GHMC building permit, ICICI Kothaguda escrow compliance. Honest watch-outs: SPV promoter has no past experience; Casagrand entered Hyderabad in 2023 with no delivered project yet; brochure markets “5 BHK community” but inventory is mixed 3/4/5 BHK; RERA discloses NO for Solid Waste Management, Energy Management, and Aggregate Recreational Open Space; on-site Casagrand International School is concept-stage.

Pros 10

  • Largest gated villa community in the Gagan Pahad / Rajendranagar micro-market at 35 acres
  • Full Telangana RERA approval P02400010759 (03 Apr 2026) with three-account ICICI escrow compliance
  • GHMC Building Permit 3380/GHMC/SWDL/RINI/2026 with all sanctioned building plans in hand
  • 5 min from PVNR Expressway and NH-44 · 15 min from Rajiv Gandhi International Airport
  • 147 of 362 villas already sold as of early May 2026 ~40% pre-launch absorption velocity
  • 93 indoor + outdoor amenities including dual 40,000 sft clubhouses and 3,600 sft pool
  • Premium specifications Italian marble, Kohler, face-recognition locks, EV charging per villa
  • 100% Vaastu-compliant villas with consistent orientation rules across all typologies
  • Casagrand Group brand No.1 in Chennai for 8 years per CBRE 2024, Top 7 in India
  • 10-stage construction-linked payment schedule starting at 10% booking, 5% on handover

Cons 10

  • Brochure markets “5 BHK community” but inventory is mixed 3, 4 and 5 BHK villas
  • Telangana RERA discloses NO / NA for Solid Waste Management and Energy Management work
  • Aggregate Recreational Open Space disclosed as NO / NA in RERA reconcile with brochure 71% open space claim
  • Promoter SPV (Casagrand Beacon Pvt Ltd) declares no past experience in RERA filing
  • Casagrand entered Hyderabad only in 2023 no delivered Hyderabad project yet to validate execution
  • 35-acre framing uses gross land; net developable is ~29 acres after setback deductions
  • On-site Casagrand International School marketed as “On-Site” but campus is still concept-stage and not yet built
  • Per-typology pricing not separately published only the aggregate price band is on the developer website
  • 36-month horizon to 03 Apr 2029 with all construction tasks at 0% workdone in RERA filing
  • Telangana total transfer cost ~7-8% (stamp + transfer + registration + misc) is higher than peer cities

Casagrand Vybe Plans

Project Layouts
Download Master Plan & Floor Plans

See the site master plan and unit-wise floor plans, sent instantly to your phone.

Casagrand Vybe Amenities

93 Total Amenities
Dual Clubhouses (40,000 sft)
3,600 sft Resort-Style Pool
Adult Swimming Pool
Kids’ Swimming Pool
Poolside Cabana
CrossFit & Interactive Gym
Yoga & Meditation Room
Squash Court
Mini Golf
Hammam Bath
Sauna
Pickleball Court
Sand Volleyball Court
Cricket Practice Net
Basketball Dribble Court
Outdoor Gym
Banquet Hall
Multipurpose Hall
Mini Theatre
Business Centres (2 nos)
Conference Room
Learning Centre
Dance & Music Rooms
VR Gaming Zone
Sky Cinema
Sunset Deck
Rooftop Grilling Pavilion
Rooftop Cabana
Terrace Cafeteria
Salon & Spa
Zen Garden
Floral Garden
Herb & Spice Garden
Lily Pond
Fruit Orchards
Hammock Garden
Pet Park with Washing Station
Outdoor Co-Working Zone
Outdoor Musical Garden
Amphitheatre
Senior Citizen Park
Toddler’s Play Area
Aqua Play Pad
Reflexology Pathway
Meditation Pavilion
Casagrand International School (on-site, future)
Vehicle-Free Podium Walkways
EV Charging Point per Villa
My Gate App Access
100% DG Power Backup
Solar Power Backup
Centralised STP & WTP
Rainwater Harvesting
24x7 CCTV Surveillance
Compound Wall & Security Booth

About Casagrand Beacon Private Limited (Casagrand Group)

Casagrand Beacon Private Limited (Casagrand Group)

Mid-segment Founded 2003 Chennai, Tamil Nadu, India
Verified Developer
160+
Projects
23
Years
7
Cities
89.7M+
Sq Ft Built

Casagrand Vybe Payment Plan

Construction Linked Plan

You pay in stages as the building goes up, so the full price is not due on day one. Each instalment falls due only when the developer finishes a construction stage, and the exact schedule is written into your agreement for sale.

  1. 1
    At booking

    Pay the booking amount, then sign and register the agreement for sale. Stamp duty and registration are paid at this stage.

  2. 2
    During construction

    Instalments are linked to stages such as the foundation and each floor slab. With a home loan, the bank pays these stages directly to the developer.

  3. 3
    At possession (April 2029)

    The last instalment is paid when the building is complete, along with maintenance deposit and other one-time charges.

Want the stage-wise schedule with amounts for your unit? Get payment schedule

Casagrand Vybe EMI Calculator

Pick a home type to see the monthly EMI on an 80% home loan, or move the sliders to match your own loan.

Home price₹3.2 Cr
You pay upfront₹64 L
Bank loan₹2.56 Cr

The 8.5% rate is only a starting point, so check the rate your bank offers you. While the project is being built, the bank releases the loan in stages and you usually pay only interest (pre-EMI) on the amount released. The full EMI starts after possession. Stamp duty, registration and GST are paid on top of the home price.

Principal Interest
₹2,22,163
Monthly EMI
₹2.77 Cr
Total Interest
₹5.33 Cr
Total Payable

Compare Casagrand Vybe

Compare with any other project →

Visit the Project

Schedule a site visit at your convenience. We handle the transportation.

Book Site Visit

More About Casagrand Vybe

01

Inventory mix: what “5 BHK community” actually means

Casagrand’s marketing copy consistently positions Vybe as “An exclusive 5 BHK villa community” (brochure inside front cover) and the official Casagrand website lists the project as “5 BHK Villas ₹3.20-4.86 Cr”. The brochure’s unit-plan pages and the Telangana RERA filing tell a more granular story. Unit-plan inventory disclosed in the brochure: one 3 BHK typology (Type 12, north-facing, carpet 2,083 sft / saleable 2,403 sft / land 1,374 sft); twelve 4 BHK typologies spanning Types 1, 1A, 1B, 1C, 1D, 2, 2A, 2B, 5, 6, 7, 8, 9, 9A, 10, 11, 13 (carpet 2,629-3,937 sft / saleable 3,121-4,558 sft); and five 5 BHK typologies (Types 3, 4, 4A, 4B, 5A — carpet 3,562-4,273 sft / saleable 4,143-5,201 sft). The Telangana RERA filing classifies all 364 sanctioned buildings under a single category, “4BHK 4T G Plus 2” (which is the dominant configuration). Channel partners (housiey.com) more accurately describe the inventory as “4 BHK & 5 BHK premium Villas”. The implication for buyers: ask for the typology-allocation map across the 4 master-plan pockets — only ~5 typologies are 5 BHK out of 18 total typology variants in the inventory.

The Telangana RERA filing discloses three distinct land-area figures: total area 143,580.49 sqm (~35.48 acres), area affected by setbacks 26,266.47 sqm (~6.49 acres), and net area 117,314.02 sqm (~28.99 acres). The setbacks include road widening, FTL (Full Tank Level) of tanks adjacent to the property, and nala (storm-water channel) widening. Brochure references the 35-acre gross figure throughout. Approved built-up area is 108,570.58 sqm, giving a Floor Space Index of ~0.92 on gross land and ~1.12 on net developable land. Density on the net developable area is 12.5 buildings per acre (~one villa per 8,600 sqft of net plot inclusive of internal roads, clubhouses and amenities). This is genuinely low-density for a gated villa community by Hyderabad standards — comparable to Casagrand Belair at Gowdavalli (~9 villas per acre on a smaller 9.25-acre site) and lower-density than typical Tellapur / Kondapur villa launches.

The brochure’s Salient Features section prominently states “Enjoy the ultimate convenience of Casagrand International School — a world-class campus within the community” and the Location Advantages table lists Casagrand International School at “On-Site”. As of mid-2026, this school does not yet exist as an operating campus. Casagrand operates a school brand in Chennai (Casagrand International School, Saidapet) that is CBSE-affiliated; the Hyderabad campus at Vybe is at concept stage. Buyers planning to enroll children at the on-site school should clarify: (a) the school’s board / accreditation (CBSE, IGCSE, IB); (b) expected campus opening date relative to Apr 2029 villa handover; (c) admission process and fee structure; and (d) whether residency at Vybe confers any admission priority. Existing comparable on-site schools in the Gagan Pahad / Rajendranagar belt include DPS Aero City (20 min), Edify World School (25 min), Basil Woods (15 min) and Rockwell International School (10 min) — so off-site alternatives are reasonable.

The Development Work table on the RERA filing (Page 2) shows three specific items where the developer has marked the “Available” field as “NO” and the percentage and details as “NA”: (1) Solid Waste Management and Disposal, (2) Energy management, and (3) Aggregate area of recreational Open Space. Other items in the same table — Internal Roads, Water Supply, Sewerage, Storm Water Drains, Green Strip / TOT LOT / Park, Street Lighting, Community Buildings, Treatment and Disposal of Sewage and Sullage Water, Water Conservation / Rainwater Harvesting, Fire Protection, Electrical Meter Room — are all marked “YES, 0%, work not started”. The plausible reading is that these three items are not part of the immediate construction scope, are bundled into a different reporting line, or are deferred to a later phase of the project. Buyers should ask Casagrand to clarify: (a) how solid waste will be handled (in-community composting? municipal collection? on-site segregation?); (b) what energy efficiency / solar / renewable provision is included (the brochure references 5 kW solar backup per villa); and (c) how recreational open space is being accounted for relative to the brochure’s “26 acres of open space” and “71% open space” claims.

The site sits at the south-west fringe of Hyderabad on the Srisailam Highway (Old NH 7 / now NH 44 segment) just north of the PVNR Expressway interchange. Drive distances per brochure: Rajiv Gandhi International Airport 15 min, PVNR Expressway 6 min, NH-44 4 min, Nehru Outer Ring Road 12 min, Airport Road 15 min, Aramghar Bus Station 5 min, Budwel Railway Station 5 min, Shamshabad Vegetable Market 10 min. Employment clusters: GMR Business Park 20 min, Financial District 30 min, Mindspace SEZ 35 min, Gachibowli 30 min, HITEC City 40 min, Banjara Hills 28 min. Healthcare: Sunrise Hospitals 10 min, LV Prasad / Trident 10 min, Olive Mehdipatnam 15 min, KIMS Gachibowli 25 min, Apollo Jubilee Hills 35 min, Continental Financial District 30 min. Retail / entertainment: GMR Aero Plaza 15 min, GVK One Mall 35 min, Inorbit Mall and Sarath City 30 min, plus upcoming Forum Mall and Aparna Mall both at 5 min drive. The proposed Airport Metro Corridor (36.6 km) is targeted for 2027 completion and is expected to trim Begumpet commute times to under 30 min, with the proposed metro station 10 min from the site.

The Gagan Pahad / Rajendranagar villa-corridor thesis rests on four pillars: (1) South-west Hyderabad’s relative affordability vs the established Gachibowli / Kokapet / Tellapur cluster — Vybe’s saleable-area pricing of ~₹9,300-10,000 per sqft compares against ~₹13,000-18,000 per sqft in core IT corridors; (2) The Airport Metro Corridor catalyst — once operational in 2027, the Gagan Pahad area is one of the closest points to RGIA with metro connectivity inherited; (3) Anchor branded developers entering simultaneously — Casagrand, Prestige Group (Prestige City), Godrej (Regal Pavilion), Ramky (Codename Rajendranagar), Dev (Signature One) — collectively repricing the micro-market; (4) RGIA airport-corridor land-rate appreciation tracked at 22% rent growth in Hyderabad Q1 2025 and ₹4,300 Cr in home registrations May 2025 per HMDA data. Honest counter: Casagrand has yet to deliver a single Hyderabad project; supply absorption across Vybe + Belair + Evon + Windsor Court + Hanford (collectively ~6 million sft of Casagrand pipeline) will test the local Hyderabad villa demand pool; PVNR Expressway corridor connectivity is real but the area lacks the social-infrastructure depth of Jubilee Hills / Banjara Hills.

Casagrand offers a construction-linked payment plan per the brochure: 10% on booking, 20% at agreement stage, 15% at foundation completion, 15% at ground-floor roof completion, 15% at first-floor roof completion, 10% at second-floor roof completion, 10% at flooring completion, and 5% at handover. Beyond the sale value, buyers in Telangana pay: stamp duty 5.0% (residential), transfer duty 1.5%, registration fee 0.5%, and miscellaneous charges ~0.5% — total ~7.5% on the conveyance value, materially higher than Bengaluru (5.0-6.5%) or Mumbai-MMR (6.0%). 5% GST applies on the under-construction sale value collected with each milestone. Casagrand offers an in-house resale facility (Casagrand Sellassure with a 6-month guaranteed resale claim and 2-month guaranteed rental claim per the brochure) and an in-house interior fit-out service (Casagrand Fitted Homes). Approved home-loan banks have not been formally announced but Casagrand projects are typically funded by HDFC, SBI, ICICI, Axis, Kotak Mahindra, LIC Housing and Bajaj Housing Finance. Casagrand Hyderabad office is at AR Square, Plot No 13, Door 4-50, Jayabheri Enclave, Gachibowli – 500 032 (Ph 91 90470 20000).

Resident Reviews

★ Write a Review
Bought, visited or living at Casagrand Vybe? Share your experience to help other buyers.

Casagrand Vybe FAQs

Where exactly is Casagrand Vybe located?

The Telangana RERA-disclosed project site is at Sy. No. 105/A/1, 106/1, 107 and 109/1, Gagan Pahad village, Rajendranagar Mandal, Ranga Reddy District – Pin 500052. Boundaries: east Sy No 33, west 12-metre existing road, north Sy No 105 part, south Sy No 109 part. The site is on the Srisailam Highway / NH-44 corridor, 5 min from PVNR Expressway interchange and 15 min from Rajiv Gandhi International Airport.

When is possession?

The Telangana RERA-disclosed proposed completion date is 03 April 2029 — a 36-month build from RERA approval on 03 April 2026. As of the RERA filing date, all 10 construction tasks (excavation through OC compliance) are at 0% workdone — the project is at very early development stage. The brochure’s payment plan is construction-linked across these milestones.

Is the project RERA-approved?

Yes. Telangana RERA registration number P02400010759 was approved on 03 April 2026. The corresponding GHMC Building Permit is BP No. 3380/GHMC/SWDL/RINI/2026, and the GHMC Plan Approval reference is 006567/GHMC/03140/SWDL/CHR1/2025. All construction funds are held in three ICICI Bank Kothaguda branch escrow accounts (Collection 100%, Separate 70%, Transaction 30%) per Telangana RERA regulations.

How much do the villas cost?

Casagrand’s official website lists the price band as ₹3.20 Cr – 4.86 Cr (5 BHK Villas). Per-typology pricing has not been uniformly published. Indicative bands based on saleable area (~₹9,300–10,000 per sqft): 3 BHK Type 12 ~₹1.80–2.00 Cr, 4 BHK Standard ~₹2.50–3.20 Cr, 4 BHK Premium ~₹3.20–3.80 Cr, 5 BHK Grand ~₹3.80–4.86 Cr. Request the cost sheet directly from Casagrand for binding numbers.

Is this really a "5 BHK community"?

Marketing simplification. The brochure’s unit-plan pages disclose a mixed inventory: one 3 BHK typology (Type 12), twelve 4 BHK typologies (Types 1, 1A, 1B, 1C, 1D, 2, 2A, 2B, 5, 6, 7, 8, 9, 9A, 10, 11, 13), and five 5 BHK typologies (Types 3, 4, 4A, 4B, 5A). Telangana RERA classifies all 364 sanctioned buildings under one Building Details category, “4BHK 4T G Plus 2” (the dominant configuration). Channel partners more accurately describe the inventory as “4 BHK & 5 BHK premium Villas”.

What is the total villa count and density?

Per the RERA filing, 364 total sanctioned buildings (362 villas + 2 clubhouses). The brochure mentions 362 villas. Total gross land 143,580.49 sqm (~35.48 acres), net developable land 117,314.02 sqm (~28.99 acres after setbacks). Density on net developable land is ~12.5 buildings per acre — genuinely low-density for a Hyderabad villa project.

What about the brochure’s claim of 71% open space and 26 acres of open space?

The brochure prominently markets “71% open space” and “26 acres of open space” across the 35-acre site. The Telangana RERA Development Work table, however, marks “Aggregate area of recreational Open Space” as NO / NA. This is a real reconciliation question — possible explanations include: (a) the open space is captured under a different RERA line item (e.g. Green Strip / TOT LOT / Park is marked YES), (b) reporting is deferred to a later phase, or (c) the brochure figure includes setback / road / nala buffer that doesn’t qualify as recreational open space. Buyers should request the detailed master-plan open-space allocation.

Who is the developer entity and what is their track record?

Promoter is Casagrand Beacon Private Limited (GSTIN 36AAKCC4128Q1Z5), an SPV created for this project — the entity declares NO past experience in the RERA filing. The broader Casagrand Group has been in Chennai since 2003 (22+ years), is ranked No.1 in Chennai for 8 years per CBRE 2024, and has been operating in Hyderabad since 2023. Recent Hyderabad pipeline: Casagrand Belair (Gowdavalli, RERA P02200009521, launched Apr 2025, expected Apr 2028), Casagrand Evon, Casagrand Windsor Court, Casagrand Hanford. Vybe is Casagrand’s fifth Hyderabad launch in 2026 and largest single project in the city.

Is the on-site Casagrand International School operational?

Not yet. The brochure markets “Casagrand International School — a world-class campus within the community” as a Salient Feature, but as of mid-2026 the on-site school is at concept stage. There is no operational campus, accredited curriculum framework or admission timetable disclosed. Buyers planning to enroll children should verify school timelines, accreditation (CBSE / IGCSE / IB), and admission process independently before transacting. Off-site alternatives in the 10-25 min drive radius include DPS Aero City, Edify World School, Basil Woods and Rockwell International School.

What is the payment schedule?

Per the brochure: 10% on booking, 20% at agreement stage, 15% on completion of foundation, 15% on completion of ground floor roof, 15% on completion of 1st floor roof, 10% on completion of 2nd floor roof, 10% on completion of flooring of respective unit, and 5% on handover. Total 100%. Beyond the sale value: Telangana stamp duty 5.0%, transfer duty 1.5%, registration 0.5%, misc ~0.5% — total ~7.5% on the conveyance value. 5% GST applies on under-construction sale value collected with each milestone.

What is the connectivity from the project?

Per brochure drive times: PVNR Expressway 6 min, NH-44 4 min, Aramghar Bus Station 5 min, Budwel Railway Station 5 min, Rajiv Gandhi International Airport 15 min, Nehru Outer Ring Road 12 min, GMR Business Park 20 min, Banjara Hills 28 min, Gachibowli 30 min, Financial District 30 min, Mindspace SEZ 35 min, HITEC City 40 min. The proposed Airport Metro station is 10 min away (targeted operational 2027).

How much has been sold?

Per Casagrand’s own project page (casagrand.co.in), 147 of 362 villas have been sold as of early May 2026 — approximately 40% absorption within the first month of launch. Casagrand has framed this as an “Early Bird price for First 25 Bookings only” offer phase. Pre-launch absorption velocity at this rate is meaningful for a 35-acre new launch, though it does not lock in completion or quality outcomes — those will track over the 36-month build.

Similar Projects Nearby

Other projects you might like in Gagan Pahad

See all in Gagan Pahad

Explore More on BookNewProperty

Continue your search with these related projects, locations and topics.

₹3.20 Cr Onwards
Enquire About Casagrand Vybe

Get a callback within 30 minutes with pricing & availability.

Secure 30 min callback No spam