New Launch RERA registered Singena Agrahara, Hosur Road, Bengaluru

KGF Ecity Crest, Singena Agrahara – Residential Plots in Bengaluru

By Zam Zam Builders and Developers · Researched by BookNewProperty

KGF Ecity Crest is a BDA-approved layout of 196 residential plots on 14.11 acres at Singena Agrahara, off Hosur Road near Bommasandra, registered with Karnataka RERA on 3 November 2026. Plots run from 600 to 5,959 Sq.Ft., and the filed completion date is 31 March 2029.

PossessionMarch 2029
Location
Singena Agrahara, Hosur Road, Bengaluru
Homes
Residential Plots
Possession
March 2029
Site area
14.11 Acres
Total homes
196 Plots
RERA number
PRM/KA/RERA/1251/308/PR/031126/009076
Quick verdict

KGF Ecity Crest suits buyers who want a BDA-approved plot near the Bommasandra and Electronic City job belt, with metro access under 4 km, and who are comfortable building their own home after March 2029. The land is fully owned and the park share is healthy.

  • The layout plan is approved by the Bangalore Development Authority, not a rural planning body.
  • Six parks cover 15.2% of the land, about 476 Sq.Ft. of park for every plot.
  • The land is owned outright by the promoter, with no joint development, no borrowing and no litigation declared.
  • A first project: the company was set up in 2020, has no earlier K-RERA project and no public delivery record.
  • 86 of the 196 plots, or 44%, are odd-shaped, which makes house plans harder and prices less comparable.
  • Only one civic amenity site of 6,135 Sq.Ft., 1% of the land, and no clubhouse or other amenities are filed.

About KGF Ecity Crest

KGF Ecity Crest is a plotted layout on Sy 203 of Singena Agrahara village, Sarjapura hobli, Anekal taluk, east of Hosur Road between Bommasandra and Huskur. It was registered with Karnataka RERA on 3 November 2026 as PRM/KA/RERA/1251/308/PR/031126/009076.

The layout has 196 residential plots on 57,111 sq m, or 14.11 acres. There are 110 standard plots: five of 20 x 30 ft, 35 of 30 x 40 ft, four of 30 x 45 ft, 58 of 30 x 50 ft and eight of 40 x 60 ft. The other 86 are odd-shaped, from 752 to 5,959 Sq.Ft. Plots take 52.5% of the land, roads 31.4%, six parks 15.2% and one civic amenity site 1%.

The Bangalore Development Authority approved the layout on 25 November 2025. Work started on 13 April 2026, seven months before registration, and the filing puts it at 18% done with ₹2 Cr spent. Plot formation runs to January 2027, roads, drains and poles to December 2028, and power and plantation through 2028, with completion filed for 31 March 2029.

The declared project cost is ₹51.50 Cr, including ₹31.43 Cr for land and ₹20.07 Cr for development, with no borrowing. That is about ₹1,600 per Sq.Ft. of plot area across the layout. No price has been published, and the filing lists no clubhouse or other amenities beyond the parks and civic works.

KGF Ecity Crest price list and sizes

KGF Ecity Crest prices by home type
Home typeSizePrice
20 x 30 ft plot – 5 plotsAvailable600 Sq.Ft.Get price
30 x 40 ft plot – 35 plotsAvailable1,199 Sq.Ft.Get price
30 x 45 ft plot – 4 plotsAvailable1,350 Sq.Ft.Get price
30 x 50 ft plot – 58 plotsAvailable1,499 Sq.Ft.Get price
40 x 60 ft plot – 8 plotsAvailable2,393 Sq.Ft.Get price
Odd-shaped plot – 86 plotsAvailable752 to 5,959 Sq.Ft.Get price

Plot Schedule Filed with K-RERA

These are the plot types filed with Karnataka RERA, converted from metres and square metres (1 sq m = 10.7639 Sq.Ft.). The per-plot list in the filing matches the summary: 196 plots with 29,973 sq m of plot area.

Plot size Filed dimensions Plots Area per plot
20 x 30 ft 6.10 x 9.14 m 5 600 Sq.Ft.
30 x 40 ft 9.14 x 12.19 m 35 1,199 Sq.Ft.
30 x 45 ft 9.14 x 13.72 m 4 1,350 Sq.Ft.
30 x 50 ft 9.14 x 15.24 m 58 1,499 Sq.Ft.
40 x 60 ft 12.19 x 18.24 m 8 2,393 Sq.Ft.
Odd-shaped Varies 86 752 to 5,959 Sq.Ft.
Total 196 3.23 lakh Sq.Ft.

The 86 odd-shaped plots break down as follows.

Odd-plot size Plots
Under 1,200 Sq.Ft. 19
1,200 to 1,500 Sq.Ft. 20
1,500 to 2,000 Sq.Ft. 20
2,000 to 3,000 Sq.Ft. 17
3,000 Sq.Ft. and above 10

KGF Ecity Crest amenities

KGF Ecity Crest lists 7 amenities, including six parks and open spaces, civic amenity site, internal roads and footpaths, storm water drains and electrical transformer and substation.

Pools and wellness

  • Six Parks and Open Spaces

Green and outdoor spaces

  • Street Lighting
  • Tree Plantation

Safety and convenience

  • Internal Roads and Footpaths

More amenities

  • Civic Amenity Site
  • Storm Water Drains
  • Electrical Transformer and Substation

Density, Parks and Roads

The layout covers 57,111 sq m (14.11 acres).

  • Plots per acre: 196 plots on 14.11 acres is about 14 plots per acre.
  • Average plot: about 1,646 Sq.Ft.
  • Parks per plot: 8,661 sq m in six parks is about 476 Sq.Ft. for each plot.
  • Land use: plots 52.5%, roads 31.4%, parks 15.2%, civic amenity 1.0%.
  • Roads: the per-plot list shows internal roads of 9.14 m and 12.19 m, and an existing 13.5 m road being widened to 18 m on one edge.

KGF Ecity Crest location and nearby places

KGF Ecity Crest is in Singena Agrahara, Hosur Road, Bengaluru. Delta Electronics Bommasandra metro station, Yellow Line, operating is 3.8 km away; Biocon Hebbagodi metro station, Yellow Line, operating is 3.8 km away; Huskur Road, Bommasandra is 5 km away. For daily life, the nearest hospital is Narayana Health City (4.9 km), the nearest school is Ebenezer International School (0.3 km) and the nearest supermarket is Chandapura town centre (5.5 km). Distances are approximate road distances.

Tiles © Esri
KGF Ecity Crest, Singena Agrahara, Hosur Road, BengaluruGet directions

Transit near KGF Ecity Crest

  • Delta Electronics Bommasandra metro stationNearestYellow Line, operating3.8 km
  • Biocon Hebbagodi metro stationYellow Line, operating3.8 km
  • Huskur RoadBommasandra5.0 km

Schools near KGF Ecity Crest

  • Ebenezer International SchoolNearestSingena Agrahara0.3 km
  • St Joseph Chaminade AcademyHeelalige1.5 km
  • IIIT BangaloreElectronic City6.1 km
  • Treamis World School8.2 km
  • Inventure AcademyGunjur9.8 km

Hospitals near KGF Ecity Crest

  • Narayana Health CityNearestBommasandra4.9 km
  • Kauvery HospitalElectronic City6.6 km
  • Spandana HospitalSarjapura Road9.5 km

Shopping near KGF Ecity Crest

  • Chandapura town centreNearest5.5 km
  • Dommasandra8.7 km

Leisure near KGF Ecity Crest

  • Singena Agrahara Lake1.9 km

Infrastructure near KGF Ecity Crest

  • Hosa Road junctionNearest7.3 km
  • Electronic City flyover9.8 km

Work Hubs near KGF Ecity Crest

  • Bommasandra Industrial AreaNearest3.9 km
  • Biocon, Electronic City4.5 km
  • Infosys, Electronic City Phase 16.4 km
  • Wipro, Electronic City6.7 km
  • Attibele Industrial Area9.7 km

Approximate road distances from the project gate.

Check travel time from KGF Ecity Crest

KGF Ecity CrestSingena Agrahara, Hosur Road, Bengaluru
Try:
Have a question about this project?Ask our research team. We answer from the RERA filings, and never share your details.
Ask a question

About the developer, Zam Zam Builders and Developers

Zam Zam Builders and Developers

Zam Zam Builders and Developers Private Limited is a Bengaluru company incorporated in 2020, with its office on Miller Tank Bund Road in Kaveriyappa Layout. It bought the Sy 203 land at a public auction, with the sale deed registered in October 2020.

The K-RERA records show no previous projects for this promoter, and the company declared no projects launched in the past five years, in Karnataka or elsewhere. There are no complaints against it. The promoter website field in the filing is blank, and we found no official website or project page.

KGF Ecity Crest RERA registration

RERA numberPRM/KA/RERA/1251/308/PR/031126/009076
RERA statusApproved
K-RERA Acknowledgement No.ACK/KA/RERA/1251/308/PR/280526/010282
Registration Date3 November 2026
Promoter EntityZam Zam Builders and Developers Private Limited
Plan Approved ByBangalore Development Authority, 25 November 2025
Approved Plan No.BDA/TPM/PRL-29/2021-22/3213/2025-26
Plot Area3.23 lakh Sq.Ft., 52.5% of the land
Parks and Open Space93,229 Sq.Ft. in 6 parks, 15.2%
Civic Amenity Site6,135 Sq.Ft. in 1 site, 1.0%
Roads1.93 lakh Sq.Ft., 31.4%
Work Start Date13 April 2026
Work Completed18% at registration
Land HoldingOwn land, bought at public auction in 2020
Project Cost Filed₹51.50 Cr, of which land ₹31.43 Cr
Borrowing DeclaredNone
Land LitigationNone declared
Escrow BankIDFC First Bank, Cunningham Road
Water SourceMuttanalluru Grama Panchayat
Complaints on K-RERANone

Source Notes

  • No marketing found. We found no developer website or project page, and the promoter website field in the filing is blank. Every figure here is from K-RERA filing PRM/KA/RERA/1251/308/PR/031126/009076. No price or official render has been published.
  • Plot count on listings. Some property listings give only 1,200 to 1,500 Sq.Ft. plots, and one review describes 86 odd sites on top of the 196 plots. In the filing the 86 odd-shaped plots are part of the 196.
  • Name and location. The project name says Ecity, but the filed address is Singena Agrahara village in Sarjapura hobli, Anekal taluk, outside Electronic City.
  • Wrong longitude. The filing gives 12.838372, 76.706472, which is about 108 km west of the village. With the longitude corrected to 77.706472, the pin falls inside the Singena Agrahara village boundary on OpenStreetMap, 0.3 km from Ebenezer International School on Singena Agrahara Road. We used the corrected pin.
  • Land extent. The RTC extent is 14 acres 4.5 guntas, which matches the 57,111 sq m filed. The conversion order and sale deed cover 16 acres 22 guntas, and the khata 62,523.93 sq m (15.45 acres). A relinquishment deed is among the uploaded documents.
  • Civic amenity site. One CA site of 570 sq m is filed, 1% of the land.
  • Amenities. The plotted filing has no amenities table. A separate amenities document was uploaded in reply to a RERA query; its contents are not in the filing text.
  • Work before registration. Work started on 13 April 2026 and was 18% done by registration on 3 November 2026.
  • Distances. We geocoded each place with OpenStreetMap Nominatim, measured the straight-line distance from the corrected pin and multiplied it by 1.3 for roads. Places over 10 km are left out.

KGF Ecity Crest timeline

Where it stands today

Keys are about 2.3 years away

Land converted to residential in Jun 2020; possession is due in Mar 2029. About 74% of the wait is behind you.

Today
Land converted to residentialJun 2020Possession dueMar 2029
  1. Filed completion date

    Roads, drains, power and plantation are due to finish by this date.

  2. Registered with Karnataka RERA

    Registered as PRM/KA/RERA/1251/308/PR/031126/009076, with 18% of the work done and about ₹2 Cr spent.

  3. RERA application filed

    Acknowledgement ACK/KA/RERA/1251/308/PR/280526/010282.

  4. Work started

    Plot formation began, as filed with K-RERA.

  5. Layout plan approved

    The Bangalore Development Authority approved the 196-plot layout.

  6. Land bought at public auction

    The sale deed for Sy 203 was registered at the Chamarajpet sub-registrar.

  7. Land converted to residential

    Conversion order CR/56/06-07 from the Deputy Commissioner, Bengaluru, for 16 acres 22 guntas.

What to Verify Before You Commit

  • Get the price per Sq.Ft. for your exact plot in writing, including any corner, park-facing or odd-plot premium.
  • For an odd-shaped plot, get the plot sketch with every side measured, and check how much of it can be built on.
  • See the BDA layout approval and the BDA or panchayat khata that each plot will get, and when.
  • Ask why the land extent differs between the sale deed, the khata and the RERA filing, and see the relinquishment deed.
  • Read the public auction sale deed and an encumbrance certificate for Sy 203.
  • Ask where the civic amenity site sits and what it will be used for.
  • Ask how water will be supplied to each plot beyond the gram panchayat connection.
  • Pay only into the RERA escrow account at IDFC First Bank, Cunningham Road.

KGF Ecity Crest review: is it a good buy?

BNP ScoreRERA approved
3.5 out of 5

Strong on density. Weaker on amenities.

  • Developer record
    6.0Limited published delivery record
  • Location and daily needs
    8.0Nearest daily needs 0.3 to 5.5 km away
  • Space and density
    9.0About 14 homes per acre
  • Time to move in
    6.0Possession March 2029, about 2.3 years away
  • Amenities
    5.07 amenities listed

Not scored yet: value for money (villas and plots are not compared yet); paperwork and risk (not enough filing details on this page yet). The score is worked out from the other parts.

How the BNP Score works

The BNP Score is our own rating, worked out with the same rules for every project from its RERA filing, its price list and our own research. It has seven parts: value for money (20%), the price per Sq.Ft. against nearby projects, adjusted for how much of what you pay for is carpet area; developer record (20%), from published delivery figures; location and daily needs (20%); paperwork and risk (15%), from land ownership, declared litigation, water source and payment plan; space and density (10%); time to move in (10%); and clubhouse space per home (5%). When a part has no published data, we leave it out and say so rather than guess. We only score projects approved under RERA. It is a starting point for comparison, not financial advice.

KGF Ecity Crest suits buyers who want a BDA-approved plot near the Bommasandra and Electronic City job belt, with metro access under 4 km, and who are comfortable building their own home after March 2029. The land is fully owned and the park share is healthy. The trade-offs are a first-time promoter with no delivery record, a high share of odd-shaped plots, a single small civic amenity site and land figures that differ across documents. With no published price, value cannot yet be compared with nearby layouts.

Pros

  • The layout plan is approved by the Bangalore Development Authority, not a rural planning body.
  • Six parks cover 15.2% of the land, about 476 Sq.Ft. of park for every plot.
  • The land is owned outright by the promoter, with no joint development, no borrowing and no litigation declared.
  • A short timeline: completion is filed for March 2029, and 18% of the work was done at registration.
  • Two operating Yellow Line metro stations, Bommasandra and Hebbagodi, are each about 3.8 km away.
  • A wide size range, from 600 Sq.Ft. to almost 6,000 Sq.Ft., with 58 standard 30 x 50 ft plots.
  • Ebenezer International School is next door, about 0.3 km away.

Cons

  • A first project: the company was set up in 2020, has no earlier K-RERA project and no public delivery record.
  • 86 of the 196 plots, or 44%, are odd-shaped, which makes house plans harder and prices less comparable.
  • Only one civic amenity site of 6,135 Sq.Ft., 1% of the land, and no clubhouse or other amenities are filed.
  • The land extent differs across documents: 16 acres 22 guntas in the sale deed, 15.45 acres in the khata and 14.11 acres filed with K-RERA.
  • The filed longitude is wrong by a full degree, placing the site about 108 km to the west.
  • Despite the name, the site is outside Electronic City; Infosys Phase 1 is about 6.4 km by road.
  • Water is to come from the Muttanalluru Grama Panchayat, with no other source declared.
Daily needs

1 of 4 daily needs are within walking distance

The nearest is education at 0.3 km and the farthest is shopping at 5.5 km.

WalkShort driveDrive
  • EducationEbenezer International School, Singena Agrahara
    0.3 km
  • TransportDelta Electronics Bommasandra metro station, Yellow Line, operating
    3.8 km
  • HealthcareNarayana Health City, Bommasandra
    4.9 km
  • ShoppingChandapura town centre
    5.5 km
02 km5 km10 km
Not sure it fits your budget or plans?Our advisor will compare it with similar projects for you, free.
Get a free second opinion

KGF Ecity Crest FAQs

Who is the developer of KGF Ecity Crest?

Zam Zam Builders and Developers Private Limited, a Bengaluru company incorporated in 2020. This is its first project on Karnataka RERA.

What is the RERA number of KGF Ecity Crest?

PRM/KA/RERA/1251/308/PR/031126/009076, registered with Karnataka RERA on 3 November 2026.

What plot sizes are available?

20 x 30 ft (600 Sq.Ft.), 30 x 40 ft (1,199 Sq.Ft.), 30 x 45 ft (1,350 Sq.Ft.), 30 x 50 ft (1,499 Sq.Ft.) and 40 x 60 ft (2,393 Sq.Ft.), plus 86 odd-shaped plots from 752 to 5,959 Sq.Ft.

Is KGF Ecity Crest BDA approved?

Yes. The layout plan BDA/TPM/PRL-29/2021-22/3213/2025-26 was approved by the Bangalore Development Authority on 25 November 2025.

When will the layout be completed?

The completion date filed with K-RERA is 31 March 2029. Work began on 13 April 2026 and was 18% done at registration.

What is the price of plots in KGF Ecity Crest?

No price has been published. The filed project cost works out to about ₹1,600 per Sq.Ft. of plot area.

Is KGF Ecity Crest in Electronic City?

No. It is in Singena Agrahara village, Anekal taluk, about 6.4 km by road from Infosys in Electronic City Phase 1 and 3.8 km from Bommasandra metro station.

How much open space does the layout have?

Six parks cover 8,661 sq m, or 15.2% of the land, and one civic amenity site covers 570 sq m.

Compare KGF Ecity Crest

This projectKGF Ecity CrestHandover 2029Residential Plots

Projects near KGF Ecity Crest

8 listed projects are within 5 km of KGF Ecity Crest. The closest shown here is Sai Fortune, about 0.8 km away.

Distances are straight-line from the project's map location; road distance is usually 20 to 40% longer.

Latest news

Recent news on Bengaluru and Karnataka.

See also

Buyer guides

Enquire About KGF Ecity Crest

Ask anything about this project. Our research team replies with what the filings show.

Secure30 min callbackNo spam