Shalimar Altius, Bolar, Mangaluru

Shalimar Altius is a single-tower mixed-use development by Shalimar Realty Holdings in Bolar, Mangaluru, comprising 41 residential flats (2, 3 & 4 BHK) and 10 commercial shops on a 65-cent (2,630 Sq. Mt.) site, K-RERA registered under PRM/KA/RERA/1257/334/PR/211223/006506.

It is an under-construction project offering 2, 3 & 4 BHK apartments + Commercial Shops. Its RERA registration number is PRM/KA/RERA/1257/334/PR/211223/006506.

Shalimar Altius, Bolar | 2, 3 & 4 BHK Apartments |
2 Photos
1 / 2

Shalimar Altius Overview

Verified by Vikash S on
Project Name
Shalimar Altius
Developer
Shalimar Realty
Location
Bolar
Property Type
Apartments
Project Type
Standalone Project
Configuration
2, 3 & 4 BHK Apartments + Commercial Shops
Total Units
51 (41 Residential Flats: 9 × 3 BHK, 4 × 4 BHK, 28 × 2 BHK + 10 Shops)
Project Status
Under Construction
Availability
Under Construction — Project Start Date 01 November 2023; sub-structure and RCC superstructure works in progress per the K-RERA project schedule
Payment Plan
Construction Linked Plan
RERA Status
K-RERA Registered
RERA Number
PRM/KA/RERA/1257/334/PR/211223/006506
Acknowledgement Number
ACK/KA/RERA/1257/334/PR/161123/007600
Project Address
Sy. No. 589/(P), Mangalore Thota Village, Mangalore City Corporation Limits, Bolar, Mangaluru, Dakshina Kannada, Karnataka – 575001
Plan Approval
Mangaluru Urban Development Authority (MUDA) — Approved Plan No. E8/BA32/2023-24(167957),Ka Ni Pa A:124/2023-24, dated 15-09-2023
Tower & Height
Single tower — Ground + 5 Floors (6 levels), height 17.99 metres, 2 basements
Parking
107 Covered Parking; 0 Open Parking; 0 Garage
Area Details
Total Built-up Area 8,638 Sq. Mt.; Total Carpet Area 4,302 Sq. Mt.; Total Plinth Area 925 Sq. Mt.; Covered Parking Area 2,937 Sq. Mt.; Open Parking Area 50 Sq. Mt.
Cost Details (as certified in Form 1)
Cost of Land ₹11.90 Crore; Cost of Layout Development ₹33.37 Crore; Total Project Cost ₹45.27 Crore
Source of Water
Borewell + Local Authority (Mangalore Mahanagara Palike)
TDR Applicable
No
Project Chartered Accountant
Gayathri CH (ICAI Member ID 222658)
Project Engineer
Anirudh Rao (Local Authority Licence No. MNG/BL/10648/21-22)
Project Architect
AR Deepu Varghese (COA Registration No. CA/2009/45561)
Project Contractor
Shalimar Realty Holdings
Brochure & Details
Get the Shalimar Altius Brochure & Instant Details

Download the full brochure or get quick answers on WhatsApp.

About Shalimar Altius

Shalimar Altius is a single-tower mixed-use development on Sy. No. 589/(P), Mangalore Thota Village, Bolar, Mangaluru, comprising 41 residential flats across 2, 3 & 4 BHK configurations and 10 commercial shops, on a site of 2,630 Sq. Mt. (≈65 Cents). The K-RERA filing records the tower as Ground + 5 floors with a height of 17.99 metres, 2 basements and 107 covered parking spaces. The project carries MUDA Plan Approval (No. E8/BA32/2023-24(167957)) dated 15 September 2023 and K-RERA Registration Number PRM/KA/RERA/1257/334/PR/211223/006506, with a Proposed Completion Date of 30 September 2028. Select units are marketed as sea-facing, given the project’s proximity to City Beach and the Netravati River mouth.
Official Documents
Download Price List & Cost Sheet

Unit-wise pricing and the complete cost breakup, sent instantly to your phone.

GST & Other Charges

Charge Rate Details
GST on Apartment Cost 5% (no ITC) 1% for affordable housing (≤ ₹45L, ≤ 60 sqm carpet).
Registration Charges 1% Of property value, paid at the Sub-Registrar office.
Stamp Duty 2–5% Karnataka: 5% above ₹45L, 3% for ₹21L–₹45L, 2% below ₹21L.
BESCOM & BWSSB At actuals Electricity and water connection deposits, as applicable.
Khata / E-Khata At actuals Recorded with the local authority (BBMP, BDA or the village panchayat) for ownership records.
Legal & Documentation At actuals Legal vetting, agreement drafting, sale-deed preparation.
Maintenance Deposit 12 months Advance maintenance, refundable or adjustable.
Corpus Fund One-time As per the sale agreement — society reserve fund.
Club House Per unit Included in base price or charged separately by the developer.
Car Parking Per slot As per the sale agreement — covered or open slot.

Note: Charges are indicative; final amounts are confirmed at the time of booking and subject to applicable laws, project location, and unit specifications.

Shalimar Altius Review: Is It a Good Buy?

VS
Reviewed by
Project Reviewer · BookNewProperty · Verified
4.4 out of 5 8 Pros · 5 Cons
Shalimar Altius is a compact, single-tower mixed-use project in Bolar, Mangaluru, offering 41 residential flats across 2, 3 and 4 BHK configurations alongside 10 ground and first-floor shops, developed by the Mangalore-based Shalimar Realty Holdings. Its RERA filing reconciles cleanly with the brochure on land area and unit count, and the carpet-to-sale-area loading factor is consistent across every unit checked. The two points worth noting are a mismatch between the brochure's marketed Club House and Gym and the RERA filing, which records both as not applicable, and a floor-count difference between the brochure's typical-floor label and the RERA-recorded Ground+5 structure.

Pros 8

  • K-RERA registered, with Registration Number PRM/KA/RERA/1257/334/PR/211223/006506.
  • MUDA Plan Approval already issued (No. E8/BA32/2023-24(167957)), dated 15 September 2023.
  • The RERA filing's total land area of 2,630 Sq. Mt. matches the brochure's own claim of “65 cents of land” almost exactly.
  • Unit bifurcation reconciles exactly across the RERA registration page, the RERA unit-bifurcation table and an independent floor-by-floor tally: 41 residential flats (9 × 3 BHK, 4 × 4 BHK, 28 × 2 BHK) plus 10 shops, totalling 51.
  • A consistent ≈27% carpet-to-sale-area loading factor holds across every 2 BHK, 3 BHK and 4 BHK unit checked against the brochure.
  • No TDR applicable to the project.
  • Bolar location close to City Beach and the Netravati River mouth, with select sea-facing units.
  • Named, RERA-registered project professionals on file: a Chartered Accountant, an Engineer and an Architect, each with their registration/licence numbers.

Cons 5

  • The brochure's typical floor plan is labelled “2nd–11th Floor,” but the K-RERA filing records only Ground + 5 floors (6 levels total) for the tower, matching its recorded height of 17.99 metres and the 51-unit total spread across Floors 0–5.
  • The brochure's Amenities page depicts a Club House and a Gym & Yoga Room, but the RERA filing's own Amenities table marks both “Club House” and “Gym” as not applicable to the project.
  • No price list or per-Sq.Ft rate is available from either the RERA filing or the brochure.
  • All 107 parking spaces are recorded as covered parking, with 0 open parking and 0 garage spaces.
  • Solid waste management and disposal, parks & tree planting, and use of renewable energy are each marked “No” (not applicable) in the RERA filing's infrastructure tables.

Shalimar Altius Plans

Project Layouts
Download Master Plan & Floor Plans

See the site master plan and unit-wise floor plans, sent instantly to your phone.

Shalimar Altius Amenities

Rooftop Swimming Pool
Children's Play Area
24 Hours Water Supply
Generator Backup for Light Purpose
CCTV & Fire Fighting System
Provision for Intercom Facility to All Apartments
2 High Speed Elevators
Rain Water Harvesting
3 Levels of Car Parking
Sewage Treatment Plant
Solar Water Heater
Visitors' Luxurious Lobby
RGC / Gail Piped Gas
Convenience Store / Super Market
Open Space with Landscape Area
24x7 Gated Security

Shalimar Altius Location & Connectivity

Plan your visit
How far is Shalimar Altius from you?

Nearby Places

  • Mangalore International Airport 17 KM (40 min)
  • Mangalore Railway Station 2.5 KM (10 min)
  • Forum Mall 1.5 KM (5 min)
  • Jeppu Market 1 KM (3 min)
  • State Bank 2 KM (6 min)
  • City Beach & Bolar Sea Face
  • Bolar Post Office
  • Jumma Masjid
  • Mangaladevi Temple Dwara
  • KMC Hospital, Attavar
  • Father Muller’s Hospital
  • Mangalore Club
  • Netravati River frontage
Area Guide · Residential

Bolar, Mangaluru

Riverside south-city pocket where the Nethravati meets the sea

₹5,900/sqft avg About 20% in 1 yrYoY 2.5 km to Hampankattafrom city
Read the full Bolar Area Guide

About Shalimar Realty Holdings

Verified Developer
Shalimar Realty Holdings has operated in the Mangalore real estate market since 2001, headquartered at 4th Floor, "Mangalore Gate", Kankanady, Mangaluru. The developer’s completed projects include Emkay Shalimar (Kankanady), Mangalore Gate (Kankanady), Shalimar Heights (Falnir), Shalimar Liverpool (Bendoorwell), Shalimar Eden (Pandeshwar), Shalimar Garden (Pandeshwar), Shalimar Trevino (Pandeshwar), Shalimar Ashraya (Kankanady) and Shalimar Arena (Kudroli), alongside upcoming commercial and residential projects at Balmatta Junction and near Ganesh Medicals, Kankanady. Shalimar Realty Holdings is also listed as the Project Contractor for Shalimar Altius in the K-RERA filing.

Shalimar Altius Payment Plan

Construction Linked Plan

You pay in stages as the building goes up, so the full price is not due on day one. Each instalment falls due only when the developer finishes a construction stage, and the exact schedule is written into your agreement for sale.

  1. 1
    At booking

    Pay the booking amount, then sign and register the agreement for sale. Stamp duty and registration are paid at this stage.

  2. 2
    During construction

    Instalments are linked to stages such as the foundation and each floor slab. With a home loan, the bank pays these stages directly to the developer.

  3. 3
    At possession

    The last instalment is paid when the building is complete, along with maintenance deposit and other one-time charges.

Want the stage-wise schedule with amounts for your unit? Get payment schedule

Shalimar Altius EMI Calculator

Pick a home type to see the monthly EMI on an 80% home loan, or move the sliders to match your own loan.

The 8.5% rate is only a starting point, so check the rate your bank offers you. While the project is being built, the bank releases the loan in stages and you usually pay only interest (pre-EMI) on the amount released. The full EMI starts after possession. Stamp duty, registration and GST are paid on top of the home price.

Principal Interest
₹56,409
Monthly EMI
₹70.38 L
Total Interest
₹1.35 Cr
Total Payable

Visit the Project

Schedule a site visit at your convenience. We handle the transportation.

Book Site Visit

More About Shalimar Altius

01

K-RERA Registration & Approvals

Registration Number: PRM/KA/RERA/1257/334/PR/211223/006506. Acknowledgement Number: ACK/KA/RERA/1257/334/PR/161123/007600. Project Start Date: 01 November 2023. Proposed Completion Date: 30 September 2028. Plan Approval: MUDA, No. E8/BA32/2023-24(167957), dated 15 September 2023. TDR Applicable: No. Source of Water: Borewell + Mangalore Mahanagara Palike.

Single tower, Ground + 5 Floors (6 levels), height 17.99 metres, 2 basements, 107 covered parking. Per the K-RERA Development Details table:

  • 2 BHK: 28 units, total carpet area 2,282 Sq. Mt.
  • 3 BHK: 9 units, total carpet area 1,024 Sq. Mt.
  • 4 BHK: 4 units, total carpet area 595 Sq. Mt.
  • Shops: 10 units, total carpet area 400 Sq. Mt.
  • Total: 51 units, 4,301 Sq. Mt. carpet area

Ground Floor: 2 BHK — 950, 1,015 & 970 Sq.Ft; 5 Shops from 510–805 Sq.Ft.
First Floor: 2 BHK — 950, 970, 1,015 (×2) & 1,135 Sq.Ft; 3 BHK — 1,465 Sq.Ft; 5 Shops from 420–670 Sq.Ft.
Floors 2–5 (per unit, repeated each floor): 4 BHK — 2,035 Sq.Ft; 3 BHK — 1,635 & 1,520 Sq.Ft; 2 BHK — 1,070, 1,180, 1,190, 1,200 & 1,220 Sq.Ft.

Structure: Fully framed R.C.C. structure; Laterite walls for exteriors, concrete blocks for internal walls; double coat exterior plastering with exterior-grade paint; putty-finished emulsion painting internally.
Doors & Windows: Decorative veneer-polished main entrance door; wooden door frames with painted flush shutters for rooms; RCC door frames with fibrotech shutters for toilets; UPVC/aluminium windows with sliding shutters & G.I. grills.
Electrical & Water: Modular switches (Legrand or equivalent); wiring in R.R. Cabel/V-Guard/Havell’s or equivalent; overhead water tank + underground sump tank; borewell/open well water supply in addition to corporation connection; fire fighting systems.
Bedrooms: TV point in master bedroom; AC provision in all bedrooms.
Bathrooms: Coloured anti-skid ceramic floor tiles with glazed tile dado; pressure-checked, leak-proof plumbing; wall-mounted EWC with health faucets; quality CP fittings; exhaust fan provision; grid false ceiling.
Kitchen/Utility: Single bowl stainless steel sink with polished black granite counter; 2′0″ glazed tile dado above platform; plumbing & drain connection with power point for washing machine.

Mangalore International Airport – 17 KM (40 min); Mangalore Railway Station – 2.5 KM (10 min); Forum Mall – 1.5 KM (5 min); Jeppu Market – 1 KM (3 min); State Bank – 2 KM (6 min). Nearby landmarks per the developer’s location map: City Beach, Bolar Sea Face, Bolar Post Office, Jumma Masjid, Mangaladevi Temple Dwara, KMC Hospital (Attavar), Father Muller’s Hospital, and Mangalore Club, with the project situated near the Netravati River mouth.

Sub-Structure: Earth work & levelling (01-11-2023 to 30-12-2023); Foundation footing (09-01-2024 to 10-05-2024); Upto Plinth Level (10-05-2024 to 10-07-2024); Sub-structure flooring (10-07-2024 to 10-10-2024).
Super-Structure: RCC/MS Framed structure (10-05-2024 to 31-12-2025); Masonry Construction (10-09-2024 to 15-03-2026); Plastering (10-11-2024 to 31-12-2026); Joinery: doors, windows, ventilators (01-08-2026 to 31-08-2028); Basic water supply/sanitary/electrification (02-06-2026 to 30-05-2028); Dadoing/skirting/flooring/tiles (01-08-2026 to 31-08-2028); Railing & grill fixing (01-03-2027 to 31-07-2028).
Finishing Works: Electrification/water supply/sanitary finishing (15-02-2027 to 07-10-2028); Painting (01-03-2026 to 15-09-2028); Fire prevention & fighting fitment (15-03-2028 to 30-09-2028); Weatherproofing (02-06-2026 to 30-05-2028); Elevation work (15-03-2028 to 30-09-2028); Internal & external work including landscaping (15-03-2028 to 31-12-2028).

Established in 2001, Shalimar Realty Holdings is headquartered at 4th Floor, "Mangalore Gate", Kankanady, Mangaluru, Karnataka – 575002. Completed projects include Emkay Shalimar, Mangalore Gate, Shalimar Heights, Shalimar Liverpool, Shalimar Eden, Shalimar Garden, Shalimar Trevino, Shalimar Ashraya and Shalimar Arena. Upcoming projects include a commercial building at Balmatta Junction and a residential/commercial building near Ganesh Medicals, Kankanady.

Property purchases in Karnataka are generally subject to Stamp Duty (typically 5% for properties valued above ₹45 Lakhs, 3% for ₹21–45 Lakhs, and 2% below ₹20 Lakhs) plus a 1% Registration Fee, in addition to the property price. Properties within a City Corporation area such as Mangaluru City Corporation may also attract additional cess/surcharge on the stamp duty component.

Resident Reviews

★ Write a Review
Bought, visited or living at Shalimar Altius? Share your experience to help other buyers.

Shalimar Altius FAQs

Is Shalimar Altius RERA registered?

Yes — Registration Number PRM/KA/RERA/1257/334/PR/211223/006506, registered with Karnataka RERA (K-RERA).

How many floors does Shalimar Altius have?

The K-RERA filing records Ground + 5 floors (6 levels), with a total tower height of 17.99 metres, though the brochure's typical floor plan page is labelled "2nd–11th Floor."

Does Shalimar Altius have a Club House and Gym?

The brochure's Amenities page lists both a Club House and a Gym & Yoga Room, but the RERA filing's own Amenities table marks both "Club House" and "Gym" as not applicable to the project.

What configurations are available at Shalimar Altius?

2, 3 and 4 BHK apartments (41 residential flats in total) plus 10 commercial shops, per both the brochure and the RERA filing.

What is the total land area of Shalimar Altius?

2,630 Sq. Mt. (about 65 Cents), matching both the RERA filing and the brochure.

What is the proposed possession date for Shalimar Altius?

30 September 2028, per the K-RERA registration.

Is Shalimar Altius a sea-facing project?

The brochure markets select units as sea-facing, and the project's Bolar location sits close to City Beach and the Netravati River mouth per the brochure's location map.

Shalimar Altius Latest Updates

  • 21 Dec 2023
    K-RERA Registration Issued
  • 16 Nov 2023
    K-RERA Application Acknowledged

Similar Projects Nearby

Other projects you might like in Bolar

See all in Bolar

Explore More on BookNewProperty

Continue your search with these related projects, locations and topics.

Enquire About Shalimar Altius

Get a callback within 30 minutes with pricing & availability.

Secure 30 min callback No spam