The railway underbridge (RUB) at Challaghatta has been completed, marking a significant milestone in Bengaluru’s Major Arterial Road (MAR) project. The corridor, spanning approximately 11 km, is now nearing its final stage and is expected to be operational soon.
The project is being developed by the Bangalore Development Authority (BDA) and aims to enhance connectivity between Magadi Road and the Bengaluru–Mysuru access-controlled highway, passing through Nadaprabhu Kempegowda Layout (NPKL).
Officials indicate that the remaining works, including finishing touches and utility integration, are expected to be completed in the coming weeks.
Key Highlights of the MAR Project
- Project Name: Major Arterial Road (MAR)
- Length: ~11 km
- Configuration: 10-lane corridor
- Key Component: Challaghatta railway underpass (completed)
- Connectivity: Magadi Road to Bengaluru–Mysuru highway
- Developer: Bangalore Development Authority (BDA)
The project is designed to provide seamless connectivity and reduce dependency on congested city routes.
Project Specifications
| Feature | Details |
|---|---|
| Total Length | 11 km |
| Lane Configuration | 6 main lanes + 4 service lanes |
| Corridor Width | ~100 metres |
| Additional Features | Cycle track, landscaping, pedestrian paths |
| Key Structure | Railway Underbridge at Challaghatta |
The road is also planned with cycle tracks, tree-lined medians, and access roads, aligning with modern urban planning standards.
Connectivity Benefits and Urban Impact
The MAR corridor is expected to significantly improve movement between western and southern Bengaluru. Once operational, it will:
- Create a direct link between Magadi Road and Mysuru Road corridors
- Reduce travel time across key routes
- Improve access to Nadaprabhu Kempegowda Layout (NPKL)
- Ease congestion on existing arterial roads
The railway underpass plays a critical role by enabling uninterrupted traffic flow across the corridor.
Real Estate and Development Impact
Infrastructure projects such as MAR often have a strong influence on nearby property markets.
Potential implications include:
- Increased demand for residential projects in west Bengaluru
- Growth of plotted developments and township projects
- Appreciation of land values in emerging micro-markets
- Improved attractiveness for commercial and retail developments
The corridor is also part of the broader Peripheral Ring Road (PRR) Phase 2 connectivity plan, which could further enhance long-term development potential.
Outlook
With the completion of the Challaghatta underpass and final works underway, the Major Arterial Road project is expected to become operational soon. The corridor is likely to play a key role in improving Bengaluru’s urban mobility and supporting future growth in surrounding areas.
Also Read: Toll-Free Major Arterial Road to Connect South and West Bengaluru, Travel Time to Drop Sharply










