Organo Orella, Chevella – 2-Floor Villas in Hyderabad
By Organo Eco Habitats · Researched by BookNewProperty
Organo Orella is a newly registered TG-RERA project of 181 two-floor villas of about 1,900 Sq.Ft. on about 19.72 acres at Ibrahimpally village, Chevella mandal, west of Hyderabad. HMDA approved the plan in July 2026 and completion is filed for July 2029.
- Developer
- Organo Eco Habitats
- Homes
- Two-Floor Villas
- Possession
- 8 July 2029
- Site area
- 19.72 Acres
- Total homes
- 181 Villas
- RERA number
- P02400011382
Organo Orella offers roomy two-floor villas on spacious, low-density land, but far from Hyderabad’s job hubs. It makes most sense as a weekend or second home, and only after Organo confirms in writing who builds the roads, lighting, parks and sewage treatment that the RERA filing leaves out.
- Low density of about 9 villas per acre on 19.72 acres
- HMDA-approved layout, approval 2289/HMDA/SWBP/2026 dated 8 July 2026
- Every villa filed with its own covered car park, 181 in all
- Internal roads and footpaths are marked as not included in the filing
- No park or green strip is filed as a development work
- Street lighting is marked as not included
About Organo Orella
In short: Organo Orella is a planned community of 181 two-floor villas in Ibrahimpally, a village in Chevella mandal on the rural western edge of Hyderabad. Each villa is about 1,900 Sq.Ft. and comes with one covered car park. It is far from the city’s office districts, so it will suit buyers who want a quiet, low-density home outside the city, such as a weekend or second home, more than daily office commuters. Organo has not yet published a price, brochure or amenity list for Orella.
The project sits on about 19.72 acres bounded by the Orella road on the east and a stream on the south. HMDA approved the layout under 2289/HMDA/SWBP/2026 on 8 July 2026, and the TG-RERA filing gives 8 July 2029 as the proposed completion date.
Every villa is filed as two floors: a larger floor of about 1,056 to 1,060 Sq.Ft. and a smaller one of about 846 to 850 Sq.Ft., for roughly 1,900 Sq.Ft. of saleable area in all. Telangana RERA records saleable area, not carpet area, so the usable space inside the walls will be somewhat less.
With 181 villas on 19.72 acres, Orella works out to about 9 homes per acre. The filing includes piped water, a sewerage network, storm drains, rainwater harvesting and solid waste management. It marks internal roads and footpaths, parks, street lighting, community buildings, sewage treatment and energy management as not included, which buyers should raise with Organo before booking.
What does each Organo Orella villa measure?
All 181 villas follow the same two-floor format in the TG-RERA filing. Figures are saleable area, converted to Sq.Ft. and rounded. Telangana RERA does not publish carpet area here, so no loading figure can be worked out yet.
| Part of the villa | Saleable area |
|---|---|
| Larger floor | 1,056 to 1,060 Sq.Ft. |
| Smaller floor | 846 to 850 Sq.Ft. |
| Whole villa | About 1,900 Sq.Ft. |
| Covered parking | One bay per villa |
The filing labels most floor rows “1BHK”, which reads as a data-entry convention for each floor rather than the bedroom count of a villa. Ask Organo for the floor plan to confirm the number of bedrooms.
Organo Orella price list and sizes
| Home type | Size | Price |
|---|---|---|
| Two-floor villaAvailable | About 1,900 Sq.Ft. saleable | Get price |
Organo Orella amenities
Organo Orella lists 6 amenities, including piped water supply, sewerage network, storm water drains, rainwater harvesting and solid waste management.
Green and outdoor spaces
- One covered car park per villa
Safety and convenience
- Rainwater harvesting
- Solid waste management
More amenities
- Piped water supply
- Sewerage network
- Storm water drains
How crowded will Organo Orella feel?
- 181 villas on about 19.72 acres is roughly 9 homes per acre.
- That is about 4,750 Sq.Ft. of site for each villa, including any common land.
- Approved built-up area is about 3,54,017 Sq.Ft. on a site of about 8,59,054 Sq.Ft., so buildings take up well under half the land.
How far is Organo Orella from Chevella and Hyderabad?
Organo has not published distances for Orella, and the project has no map listing yet. We placed it at the centre of Ibrahimpally village, PIN 501503, 17.3280 N, 78.1288 E, took the straight-line distance to each place and multiplied by 1.30 to allow for roads. The site could be up to about a kilometre from that point.
Within 10 km there is Chevella town, about 3.3 km away, and its hospitals: Vijay Hospital about 2.3 km, the government Community Health Centre about 2.4 km and Dr. Patnam Mahender Reddy General Hospital about 4.0 km. Everything else is farther: Gachibowli and the Financial District are well over 10 km away, and so is Rajiv Gandhi International Airport, so expect long drives for work, flights and specialist hospitals.
Organo Orella location and nearby places
Organo Orella is in Ibrahimpally, Chevella, Hyderabad. Vijay Hospital, Chevella is 2.3 km away; Community Health Centre, Chevella is 2.4 km away; Chevella town centre is 3.3 km away. For daily life, the nearest hospital is Vijay Hospital (2.3 km). Distances are approximate road distances.
Hospitals near Organo Orella
- Vijay HospitalNearestChevella2.3 km
- Community Health CentreChevella2.4 km
- Dr. Patnam Mahender Reddy General Hospital4.0 km
Infrastructure near Organo Orella
- Chevella town centre3.3 km
Approximate road distances. Where the developer did not publish a distance, we estimated it from the site pin (17.328 N, 78.1288 E): straight-line distance multiplied by 1.30 for roads, using places within 10 km.
Check travel time from Organo Orella
About the developer, Organo Eco Habitats
Organo Eco Habitats
Hyderabad builder of eco villa communities in the countryside
Organo Eco Habitats Private Limited is a Hyderabad developer that builds what it calls “rurban” communities: villa and loft projects in the countryside around the city, designed around farms, gardens and resource conservation. The company has many registrations in Ranga Reddy district.
Its website lists Organo Naandi, Organo Antharam 1 and Rurban Nest in Nizamabad as delivered, and Rurban Lofts, Depalle, Antharam 2, Ibrahimpalle, Kandawada, Aloor, Damaragidda and Palgutta as in progress. Orella is not yet listed on the website.
Organo Ibrahimpalle is a separate project with its own TG-RERA number, P02400009354, marketed as 200 villas of 4,800 Sq.Ft. and more. Orella is a different filing with smaller villas of about 1,900 Sq.Ft.
Which development works did Organo file for Orella?
TG-RERA asks each promoter to mark the standard development works as included or not. This is what was filed for Orella.
| Work | Filed |
|---|---|
| Water supply | Yes |
| Sewerage network | Yes |
| Storm water drains | Yes |
| Solid waste management | Yes |
| Rainwater harvesting | Yes |
| Internal roads and footpaths | No |
| Green strip or park | No |
| Street lighting | No |
| Community buildings | No |
| Sewage treatment and disposal | No |
| Energy management | No |
A villa community without filed internal roads, lighting or a park is unusual. These works may be planned under another registration, left to a later phase, or charged separately. Get Organo’s answer in writing.
Organo Orella RERA registration
| RERA number | P02400011382 |
|---|---|
| RERA status | Approved |
| Promoter | Organo Eco Habitats Pvt Ltd |
| Plan Approval | HMDA 2289/HMDA/SWBP/2026 |
| Approval Date | 8 July 2026 |
| Survey Numbers | Sy. Nos 17 to 26 |
| Village and PIN | Ibrahimpally 501503 |
| Filed Site Area | 8,59,054 Sq.Ft. |
| Approved Built-Up Area | 3,54,017 Sq.Ft. |
| Typical Villa Size | About 1,900 Sq.Ft. saleable |
| Floors per Villa | Two slabs |
| Covered Parking | 181 bays, one per villa |
| Road Widening Loss | No road loss filed |
| Landowner Agreement | None on file |
| Designated Bank | State Bank of India |
| Registration Date | 6 November 2026 |
Which documents should you check before booking Organo Orella?
- That your agreement quotes TG-RERA registration P02400011382 and names Organo Eco Habitats as the promoter.
- HMDA layout approval 2289/HMDA/SWBP/2026 and the approved layout plan.
- Title documents for Sy. Nos 17 to 26, Ibrahimpally village.
- A written note on who builds and pays for internal roads, street lighting, parks and sewage treatment.
- The villa floor plan, bedroom count and the carpet area of each floor.
- A written price sheet showing the saleable area, the parking and every extra charge.
- The flood buffer and setback along the stream on the south boundary.
- Water source and power supply arrangements for a village site.
Organo Orella timeline
Keys are about 2.6 years away
HMDA layout approved in Jul 2026; possession is due in Jul 2029. About 12% of the wait is behind you.
- Proposed completion date
TG-RERA completion date filed for the 181 villas and the development works.
- Listed on TG-RERA
The TG-RERA project record shows Organo Orella as a new residential project by Organo Eco Habitats, with an SBI designated account.
- HMDA layout approved
HMDA approved the Organo Orella layout under 2289/HMDA/SWBP/2026 for 181 two-floor villas on about 19.72 acres at Ibrahimpally.
Organo Orella review: is it a good buy?
Strong on density. Weaker on location and amenities.
- Developer record6.0Limited published delivery record
- Location and daily needs4.3Nearest daily needs 2.3 km away; no transport or schools or shops found within 10 km
- Space and density9.0About 9 homes per acre
- Time to move in6.0Possession 8 July 2029, about 2.6 years away
- Amenities5.06 amenities listed
Not scored yet: value for money (villas and plots are not compared yet); paperwork and risk (not enough filing details on this page yet). The score is worked out from the other parts.
How the BNP Score works
The BNP Score is our own rating, worked out with the same rules for every project from its RERA filing, its price list and our own research. It has seven parts: value for money (20%), the price per Sq.Ft. against nearby projects, adjusted for how much of what you pay for is carpet area; developer record (20%), from published delivery figures; location and daily needs (20%); paperwork and risk (15%), from land ownership, declared litigation, water source and payment plan; space and density (10%); time to move in (10%); and clubhouse space per home (5%). When a part has no published data, we leave it out and say so rather than guess. We only score projects approved under RERA. It is a starting point for comparison, not financial advice.
Organo Orella offers roomy two-floor villas on spacious, low-density land, but far from Hyderabad’s job hubs. It makes most sense as a weekend or second home, and only after Organo confirms in writing who builds the roads, lighting, parks and sewage treatment that the RERA filing leaves out.
The fundamentals in the filing are sound: an HMDA-approved layout, about 9 villas per acre, a designated bank account and a developer with delivered rurban communities. The gaps are just as clear. Internal roads, footpaths, parks, street lighting, community buildings and sewage treatment are all marked No, which is unusual for a gated villa project and may mean those works sit outside this registration or will be charged separately.
Until Organo publishes a price, a brochure and the TG-RERA registration certificate for Orella, treat it as a project to study rather than one to book.
Pros
- Low density of about 9 villas per acre on 19.72 acres
- HMDA-approved layout, approval 2289/HMDA/SWBP/2026 dated 8 July 2026
- Every villa filed with its own covered car park, 181 in all
- Rainwater harvesting, storm drains and solid waste management are in the filing
- No land lost to road widening, as filed with TG-RERA
- Chevella town is about 3.3 km away for daily needs
- Developer has delivered earlier communities such as Organo Naandi and Antharam 1
- Project money is to be held in a designated State Bank of India account
Cons
- Internal roads and footpaths are marked as not included in the filing
- No park or green strip is filed as a development work
- Street lighting is marked as not included
- No community building or clubhouse is filed for the project
- Sewage treatment and disposal is marked No despite a sewerage network
- Gachibowli and the Financial District are well over 10 km away
- Only one villa size, about 1,900 Sq.Ft., limits buyer choice
- Only one covered car park per villa
- Completion is filed for July 2029, nearly three years away
1 of 1 daily needs are a short drive away
The nearest is healthcare at 2.3 km and the farthest is healthcare at 2.3 km.
- HealthcareVijay Hospital, Chevella2.3 km
Where do these Organo Orella figures come from?
The TG-RERA filing is our source for every figure on this page.
- Villa count. The filing lists 181 villas and 181 parking bays, but has 356 floor rows, which would cover only about 178 two-floor villas. We follow the 181 headline count.
- Data error. One floor row shows about 80,080 Sq.Ft., an obvious entry error, and is ignored.
- Area basis. Sizes are saleable area as filed. No carpet area is published, so no loading figure is shown.
- Price. Organo’s website does not list Orella yet, and no price, brochure or images have been published.
- Not Organo Ibrahimpalle. Organo Ibrahimpalle, P02400009354, is a separate project of larger villas. Its figures are not used here.
- Map pin. The pin marks Ibrahimpally village, not the exact survey numbers.
TG-RERA registration. Registration number P02400011382 was read from the TG-RERA registration certificate, dated 6 November 2026, on 16 November 2026.
Organo Orella FAQs
Who is developing Organo Orella?
Organo Orella is being developed by Organo Eco Habitats Private Limited, a Hyderabad developer known for countryside villa communities such as Organo Naandi and Organo Antharam.
Where is Organo Orella?
It is in Ibrahimpally village, Chevella mandal, Ranga Reddy district, PIN 501503, on the rural western edge of Hyderabad. The site faces the Orella road on its east side.
How big are the villas at Organo Orella?
Each villa has two floors and about 1,900 Sq.Ft. of saleable area as filed with TG-RERA, with one covered car park.
How many villas are there and on how much land?
The filing lists 181 villas on about 19.72 acres, which is about 9 villas per acre.
When will Organo Orella be completed?
The proposed completion date filed with TG-RERA is 8 July 2029.
What is the price of Organo Orella?
Organo has not published a price for Orella yet. Ask for a written price sheet that shows the saleable area and all extra charges.
Is Organo Orella the same as Organo Ibrahimpalle?
No. Organo Ibrahimpalle is a separate project with TG-RERA number P02400009354 and larger villas of 4,800 Sq.Ft. and more. Orella is a different filing with villas of about 1,900 Sq.Ft.
Does Organo Orella have a clubhouse and internal roads?
The TG-RERA filing marks community buildings, internal roads and footpaths, parks and street lighting as not included. Confirm with Organo how these will be provided.
Who approved the Organo Orella layout?
HMDA approved the layout under 2289/HMDA/SWBP/2026 on 8 July 2026.
How far is Organo Orella from Gachibowli?
Gachibowli and the Financial District are well over 10 km away. Chevella town, about 3.3 km away, is the nearest place for daily needs, with hospitals about 2.3 to 4 km away.
Latest news
Recent news on Hyderabad and Telangana.
- TG RERA Orders ₹1.19 Crore in Refunds From Five Hyderabad Builders, Fines Sanali IT Parks ₹25 Lakh
- Hyderabad Metro Phase 2 Approved: Five Corridors, 76.4 km, ₹24,269 Crore by 2029
- TG RERA: Layout Approval From DTCP or Panchayat Does Not Replace RERA Registration, Plot Promoter Fined ₹5.3 Lakh
- Telangana High Court Admits PIL Alleging Spectra Group Took ₹5,000 Crore From Plot Buyers
- Hyderabad Home Registrations Fall 14% in October 2026, but Prices Are Up 10%
- Telangana CID Arrests Four Over ₹90 Crore Kollur Land Fraud Done Through the Bhu Bharati Portal
See also
Buyer guides
Ask anything about this project. Our research team replies with what the filings show.