SLV Sai Gardenia Phase 2, Kanakapura Road – Residential Plots in Bengaluru
By SLV Associates · Researched by BookNewProperty
A 123-plot layout on 8.28 acres at Thattaguppe, off Kanakapura Road, approved by the Kanakapura Planning Authority. Three-quarters of the development was already done at registration, and completion is filed for December 2027.
- Developer
- SLV Associates
- Homes
- Residential Plots
- Possession
- December 2027
- Site area
- 8.28 Acres
- Total homes
- 123 Plots
- RERA number
- PRM/KA/RERA/1251/310/PR/171126/009107
SLV Sai Gardenia Phase 2 suits a buyer who wants a standard 30 × 40 or 30 × 50 plot in an approved layout that is already mostly built, and who is happy to live well beyond the NICE Road. Roads and plots are formed, there is no debt or litigation on record, and completion is close.
- 61 of the 123 plots are standard 30 × 50 ft sites of 1,499 Sq.Ft., with 12 more at 30 × 40 ft
- 75% of the layout development was reported complete at registration, so roads and plot formation are already in place
- Six parks totalling 3,568 sq m and two civic amenity sites are set aside in the approved plan
- 48 of the 123 plots are odd-shaped, ranging from 443 to 3,460 Sq.Ft.
- Most of the layout work was done before the project was registered with K-RERA
- No metro station within 10 km; Silk Institute on the Green Line is about 12 km away
About SLV Sai Gardenia Phase 2
SLV Sai Gardenia Phase 2 is a plotted layout in Thattaguppe village, Uttarahalli hobli, in the farmland belt south of the NICE Road off Kanakapura Road. It spreads over four survey numbers, 4/1, 122/3, 122/4 and 134/1, totalling 8.28 acres. The Kanakapura Planning Authority approved the layout on 9 January 2025, and K-RERA registered it on 17 November 2026.
The phase has 123 residential plots, numbered 177 to 299. Sixty-one are 30 × 50 ft, twelve are 30 × 40 ft, two are 30 × 35 ft, and forty-eight are odd-shaped plots between 443 and 3,460 Sq.Ft. Plots take 47% of the land, roads 37%, six parks 11% and two civic amenity sites 5%. Internal roads are 9 m wide.
This is a late registration. Work began in January 2025, and by the time the project was registered the promoter reported 75% of the development done and ₹3.83 Cr spent. What remains is mainly storm-water drains, parks, the electrical transformer and finishing work, with completion filed for 30 December 2027.
The filed project cost is ₹17.95 Cr, of which land is ₹12.02 Cr. The land is held under joint development agreements registered in September 2025 with the landowners of each survey number. No borrowing or litigation is declared. Water is to come from the village panchayat and from the Phase 1 layout’s supply.
SLV Sai Gardenia Phase 2 price list and sizes
Plot Schedule Filed with K-RERA
The layout has 123 residential plots, numbered 177 to 299. Sizes below are from the plot-wise schedule filed with Karnataka RERA, converted from square metres (1 sq m = 10.7639 Sq.Ft.).
| Plot size | Plots | Area per plot |
|---|---|---|
| 30 × 50 ft (9.14 × 15.24 m) | 61 | 1,499 Sq.Ft. |
| 30 × 40 ft (9.14 × 12.19 m) | 12 | 1,199 Sq.Ft. |
| 30 × 35 ft (9.14 × 10.67 m) | 2 | 1,050 Sq.Ft. |
| Odd-shaped plots | 48 | 443 to 3,460 Sq.Ft. |
| Total | 123 | 1,70,231 Sq.Ft. |
The developer has not published saleable sizes or prices for this phase, so there is no loading to work out. In a plotted layout you buy the plot area itself.
SLV Sai Gardenia Phase 2 amenities
SLV Sai Gardenia Phase 2 lists 9 amenities, including parks and open spaces, civic amenity sites, 9 m and 12 m internal roads, underground drainage and sewerage and storm water drains.
Sports and fitness
- Drinking Water Supply
Pools and wellness
- Parks and Open Spaces
Safety and convenience
- 9 m and 12 m Internal Roads
More amenities
- Civic Amenity Sites
- Underground Drainage and Sewerage
- Storm Water Drains
- Avenue Plantation
- Electrical Lines and Transformer
- Renewable Energy Provision
Land Use and Open Space
The layout covers 33,488 sq m, or 8.28 acres, which works out to about 15 plots per acre. The filed land use is:
| Use | Area | Share |
|---|---|---|
| Residential plots (123) | 15,815 sq m | 47.2% |
| Roads | 12,429 sq m | 37.1% |
| Parks and open spaces (6) | 3,568 sq m | 10.7% |
| Civic amenity sites (2) | 1,676 sq m | 5.0% |
The parks come to about 312 Sq.Ft. per plot. Roads are 9 m wide inside the layout, with a 12 m road on one edge. There is no clubhouse; the filed works are roads, drains, water supply, sewerage, storm-water drains, parks, plantation, a transformer and renewable-energy provision.
SLV Sai Gardenia Phase 2 location and nearby places
SLV Sai Gardenia Phase 2 is in Thattaguppe, off Kanakapura Road, Bengaluru. Kanakapura Road, Somanahalli bus stop is 3 km away; Kaggalipura bus stop is 3.7 km away. For daily life, the nearest hospital is Kaggalipura Government Hospital (4.1 km) and the nearest school is Edify School (3.3 km). Distances are approximate road distances.
Transit near SLV Sai Gardenia Phase 2
- Kanakapura RoadNearestSomanahalli bus stop3.0 km
- Kaggalipura bus stop3.7 km
Schools near SLV Sai Gardenia Phase 2
- Edify SchoolNearestKaggalipura3.3 km
- APS CollegeSomanahalli3.8 km
Hospitals near SLV Sai Gardenia Phase 2
- Kaggalipura Government HospitalNearest4.1 km
- Sri Sri Ayurveda HospitalUdayapura6.2 km
Leisure near SLV Sai Gardenia Phase 2
- Tharalu Estate LakeNearest1.8 km
- Art of Living International CenterUdayapura7.0 km
Approximate road distances from the project gate.
Check travel time from SLV Sai Gardenia Phase 2
About the developer, SLV Associates
M/s SLV Associates is a partnership firm registered in 2018–19 (registration JNR-F819-2018-19), with its office in Suncity Layout, J.P. Nagar 7th Phase. Its authorised signatory is R Adhikesavulu Naidu, one of three partners.
The K-RERA record lists no earlier projects for this promoter, and the firm answered No to projects launched in the past five years. The filing nonetheless refers to an SLV Sai Gardenia Phase 1, whose plots appear to be numbered 1 to 176, but that phase is not registered with K-RERA under this promoter. The firm does not list a website.
SLV Sai Gardenia Phase 2 RERA registration
| RERA number | PRM/KA/RERA/1251/310/PR/171126/009107 |
|---|---|
| RERA status | Approved |
| K-RERA Acknowledgement No. | ACK/KA/RERA/1251/310/PR/230926/010625 |
| Registration Date | 17 November 2026 |
| Promoter Entity | M/s SLV Associates, partnership firm |
| Plan Approved By | Kanakapura Planning Authority, 9 January 2025 |
| Approved Plan No. | KPA/LAO/153/2023-24/2605 |
| Survey Numbers | 4/1, 122/3, 122/4 and 134/1, Thattaguppe, Uttarahalli hobli |
| Plot Numbers | 177 to 299 |
| Parks and CA Sites | 6 parks, 3,568 sq m; 2 CA sites, 1,676 sq m |
| Road Area | 12,429 sq m, 37% of the layout |
| Work Completed | 75% at registration, ₹3.83 Cr spent |
| Work Start Date | 15 January 2025 |
| Project Cost Filed | ₹17.95 Cr |
| Land Cost Filed | ₹12.02 Cr |
| Land Holding | Joint development with landowners |
| Borrowing Declared | None |
| Litigation Declared | None |
| Escrow Bank | IndusInd Bank, Jayanagar |
| Water Source | Village panchayat and Phase 1 supply |
| Complaints on K-RERA | None |
Source Notes
Plot sizes, land use, costs, dates and approvals come from the K-RERA filing for PRM/KA/RERA/1251/310/PR/171126/009107. The filing lists no promoter website, and no official SLV Associates page for this phase could be found, so there is no published price, brochure or render.
- Development before registration: the filing gives a start date of 15 January 2025 and reports 75% of development done and ₹3.83 Cr spent when the project was registered on 17 November 2026. Plot formation and roads were scheduled to finish in 2025.
- Phase 1: the K-RERA record lists no earlier project for M/s SLV Associates, so SLV Sai Gardenia Phase 1 is not on the K-RERA register under this promoter. The filing names “SLV Sai Gardenia Phase-1” as a water source, and Phase 2 plots start at number 177. Property portals describe an SLV Sai Gardenia layout in Tharalu of about 176 plots and 5 acres; that has not been confirmed from an official source.
- Location: the filed pin (12.779143, 77.523838) lies about 1 km from the Thattaguppe village boundary point in OpenStreetMap, consistent with the filed address in Thattaguppe village.
- Plot count: the size-wise summary and the plot-wise list agree on 123 plots.
- Distances: Distances are straight-line distances from the site pin filed with K-RERA, multiplied by 1.3 to allow for roads, with landmarks located through OpenStreetMap (Photon geocoder). Only places within 10 km are listed. Actual drive distances depend on the route. The nearest metro station, Silk Institute on the Green Line, works out to about 12 km by this method, so it is not listed.
SLV Sai Gardenia Phase 2 timeline
Keys are about 1 years away
K-RERA registration in Nov 2026; possession is due in Dec 2027. The wait has only just begun.
- K-RERA registration
Registered as PRM/KA/RERA/1251/310/PR/171126/009107 with 75% of development done and completion due on 30 December 2027.
- RERA application filed
Acknowledgement ACK/KA/RERA/1251/310/PR/230926/010625.
- Work started
The filing gives 15 January 2025 as the start date, with plot formation scheduled to finish by May 2025.
- Layout plan approved
The Kanakapura Planning Authority approved plan KPA/LAO/153/2023-24/2605.
What to Verify Before You Commit
- Ask whether any plot in this phase was booked or sold before the 17 November 2026 registration, and get your allotment letter dated after it.
- Read the joint development agreements registered on 19 September 2025 and the landowners’ sharing ratio for the four survey numbers (4/1, 122/3, 122/4 and 134/1).
- Check the Kanakapura Planning Authority approval KPA/LAO/153/2023-24/2605 and the release order for the plot you choose.
- For odd-shaped plots, get the exact dimensions and buildable area, since some are under 500 Sq.Ft. and others over 3,000 Sq.Ft.
- Confirm the water arrangement, since the filing relies on the panchayat and on Phase 1’s supply.
- Confirm when the khata for individual plots will be issued.
- Pay only into the RERA escrow account at IndusInd Bank, Jayanagar.
SLV Sai Gardenia Phase 2 review: is it a good buy?
Strong on density and time to move in. Weaker on amenities.
- Developer record6.0Limited published delivery record
- Location and daily needs6.8Nearest daily needs 3 to 4.1 km away; no shops found within 10 km
- Space and density9.0About 15 homes per acre
- Time to move in8.5Possession December 2027, about 1 years away
- Amenities5.09 amenities listed
Not scored yet: value for money (villas and plots are not compared yet); paperwork and risk (not enough filing details on this page yet). The score is worked out from the other parts.
How the BNP Score works
The BNP Score is our own rating, worked out with the same rules for every project from its RERA filing, its price list and our own research. It has seven parts: value for money (20%), the price per Sq.Ft. against nearby projects, adjusted for how much of what you pay for is carpet area; developer record (20%), from published delivery figures; location and daily needs (20%); paperwork and risk (15%), from land ownership, declared litigation, water source and payment plan; space and density (10%); time to move in (10%); and clubhouse space per home (5%). When a part has no published data, we leave it out and say so rather than guess. We only score projects approved under RERA. It is a starting point for comparison, not financial advice.
SLV Sai Gardenia Phase 2 suits a buyer who wants a standard 30 × 40 or 30 × 50 plot in an approved layout that is already mostly built, and who is happy to live well beyond the NICE Road. Roads and plots are formed, there is no debt or litigation on record, and completion is close. The trade-offs are a promoter with no K-RERA track record and no published price, a layout developed largely before registration, many odd-shaped plots, panchayat water and no metro within 10 km.
Pros
- 61 of the 123 plots are standard 30 × 50 ft sites of 1,499 Sq.Ft., with 12 more at 30 × 40 ft
- 75% of the layout development was reported complete at registration, so roads and plot formation are already in place
- Six parks totalling 3,568 sq m and two civic amenity sites are set aside in the approved plan
- Layout approved by the Kanakapura Planning Authority on land converted to residential use in 2023
- No borrowing, no land litigation and no complaints declared at registration
- Completion is filed for December 2027, about 13 months after registration
Cons
- 48 of the 123 plots are odd-shaped, ranging from 443 to 3,460 Sq.Ft.
- Most of the layout work was done before the project was registered with K-RERA
- No metro station within 10 km; Silk Institute on the Green Line is about 12 km away
- The promoter has no earlier K-RERA projects and no website, and Phase 1 is not on the K-RERA register
- Water depends on the village panchayat and Phase 1’s supply rather than BWSSB
- Transformer and substation work is not due to start until March 2027
3 of 3 daily needs are a short drive away
The nearest is transport at 3 km and the farthest is healthcare at 4.1 km.
- TransportKanakapura Road, Somanahalli bus stop3 km
- EducationEdify School, Kaggalipura3.3 km
- HealthcareKaggalipura Government Hospital4.1 km
SLV Sai Gardenia Phase 2 FAQs
What is the RERA number of SLV Sai Gardenia Phase 2?
It is registered with Karnataka RERA as PRM/KA/RERA/1251/310/PR/171126/009107, approved on 17 November 2026.
Where is SLV Sai Gardenia Phase 2?
Survey numbers 4/1, 122/3, 122/4 and 134/1 of Thattaguppe village, Uttarahalli hobli, Bengaluru South, PIN 560082. It lies off Kanakapura Road, south of the NICE Road, about 1.8 km from Tharalu Estate Lake.
What plot sizes are available?
61 plots of 30 × 50 ft (1,499 Sq.Ft.), 12 of 30 × 40 ft (1,199 Sq.Ft.), 2 of 30 × 35 ft (1,050 Sq.Ft.) and 48 odd-shaped plots from 443 to 3,460 Sq.Ft.
What is the price of plots in SLV Sai Gardenia Phase 2?
SLV Associates has not published a price for this phase.
How much of the layout is complete?
The filing reports 75% of development done at registration, with completion due on 30 December 2027.
Is Phase 1 of SLV Sai Gardenia registered with RERA?
The K-RERA record for this promoter shows no earlier registered project, so Phase 1 is not on the register under SLV Associates.
Who approved the layout plan?
The Kanakapura Planning Authority, plan number KPA/LAO/153/2023-24/2605, dated 9 January 2025.
Compare SLV Sai Gardenia Phase 2
Projects near SLV Sai Gardenia Phase 2
5 listed projects are within 5 km of SLV Sai Gardenia Phase 2. The closest shown here is JD Signature, about 2.7 km away.






Distances are straight-line from the project's map location; road distance is usually 20 to 40% longer.
Latest news
Recent news on Bengaluru and Karnataka.
- Embassy One Residences Launched at Mekhri Circle: 59 Homes, Sizes and RERA Status
- Arvind Codename Golden Harvest in Devanahalli, Bengaluru: RERA Number and What We Know
- Karnataka Plans a Fresh Guidance Value Revision; Property Registration in Bengaluru Could Cost More
- Puravankara Signs Six Bengaluru Land Deals in FY27, Latest 12.76 Acres at Sathanur
- Assetz and Fairlark Propose 1,460 Homes on 10 Acres at Aerospace Park, Bengaluru
- Arvind Orchards Phase 3 EOI Opens at ₹8,750 per Sq.Ft. in Devanahalli, Bengaluru
See also
Buyer guides
Ask anything about this project. Our research team replies with what the filings show.