Sobha One World Hoskote: 1, 2, 3 & 4 BHK Flats in East Bengaluru
By Sobha Limited · Researched by BookNewProperty · Verified
Sobha One World is a large new township by Sobha Limited at Hoskote on Old Madras Road, East Bengaluru, with 1 to 4 BHK apartments in tall towers sold as One Residences at Sobha One World.
- Developer
- Sobha Limited
- Location
- Hoskote, Bengaluru
- Price from
- ₹1.12 Cr
- Homes
- 1 to 4 BHK Apartments
- Possession
- December 2032
- Site area
- 47.4 Acres Phase 1
- Total homes
- 3,484 Homes Phase 1
- RERA number
- PRM/KA/RERA/1250/304/PR/080526/008634
Our verdict. This is one of the strongest large launches in East Bengaluru this year.
- Low entry price for Sobha. Homes start at ₹1.12 Cr, which is rare for a Sobha project in Bengaluru.
- Built by Sobha itself. In-house construction and a long record of finished projects in Bengaluru.
- Every size in one place. 1, 2, 3 and 4 BHK homes in the same community.
- Long wait. Handover is due by December 2032, about six years away. If you take a home loan, you may pay EMIs before you can move in or rent it out.
- Outside city limits. Hoskote is outside the Bengaluru city corporation, so roads, water and drainage are still catching up.
- No metro yet. A metro line to Hoskote is only a proposal for now.
About Sobha One World
In one line. A Sobha-built township on the eastern edge of Bengaluru where you can buy a branded flat from about ₹1.1 Cr and wait about six years for the keys.
What you are buying. Phase 1 covers 47.4 acres with 3,484 homes in 14 towers of up to 46 floors. The full township is planned on 300 acres, so more phases, shops and offices will come later. Homes run from 740 Sq.Ft. for a 1 BHK to 2,432 Sq.Ft. for the largest 4 BHK. Those sizes include walls and a share of common areas. The floor space you actually live in, called carpet area, is 444 to 1,455 Sq.Ft.
Where it is. Amanidoddakere village in Hoskote, about 2 km from Old Madras Road (NH-75). Whitefield and KR Puram are to the west, and the Hoskote industrial area is close by.
Is it approved? Yes. Karnataka RERA, the state body that registers projects and protects buyers, registered Phase 1 on 8 May 2026 under PRM/KA/RERA/1250/304/PR/080526/008634. Under RERA, the builder must keep 70% of the money buyers pay in a separate account for this project and must stick to the registered completion date.
How fast it is selling. Sobha launched on 13 June 2026 and sold about 40% of the homes released at launch. Its 14 October 2026 filing shows 37.1% of the homes in phases 2 to 6 booked, with about 120 homes booked each month since July. The phase table below shows which towers still have the most choice.
Why buyers pick it. Sobha designs and builds its projects itself instead of hiring outside contractors, so finishing quality is consistent. The township is planned around open space, with a full-size cricket ground, tennis and pickleball courts, a skating rink, an amphitheatre and a pet park.
Sobha One World price list and sizes
Sobha One World prices start at ₹1.12 Cr for the 1 BHK and go up to ₹3.86 Cr for the 4 BHK Grande.
| Home type | Size | Price | Cost sheet |
|---|---|---|---|
| 1 BHKAvailable | 734 Sq.Ft. | ₹1.12 Cr Onwards | Cost sheet |
| 2 BHK LuxAvailable | 1,063 Sq.Ft. | ₹1.63 Cr Onwards | Cost sheet |
| 2 BHK GrandeAvailable | 1,204 Sq.Ft. | ₹1.85 Cr Onwards | Cost sheet |
| 3 BHK LuxAvailable | 1,510 Sq.Ft. | ₹2.34 Cr Onwards | Cost sheet |
| 3 BHK GrandeAvailable | 1,735 to 1,838 Sq.Ft. | ₹2.81 Cr Onwards | Cost sheet |
| 4 BHK LuxeAvailable | 2,096 Sq.Ft. | ₹3.33 Cr Onwards | Cost sheet |
| 4 BHK GrandeAvailable | 2,415 Sq.Ft. | ₹3.86 Cr Onwards | Cost sheet |
Sobha One World master plan and floor plans
Sobha One World has 9 published floor plans across 1 BHK, 2 BHK, 3 BHK, 4 BHK homes. Sizes shown are saleable area; tap a plan to see the room sizes and carpet area.
Plans are from the developer's brochure. Final dimensions are in your agreement for sale.
Sobha One World amenities
Sobha One World lists 24 amenities, including clubhouse, swimming pool, gymnasium, indoor sports courts and outdoor sports courts.
Sports and fitness
- Gymnasium
- Indoor Sports Courts
- Outdoor Sports Courts
- Jogging Track
- Cycling Track
- Seating Courts
- Walking Trails
Pools and wellness
- Swimming Pool
- Yoga Deck
- Meditation Spaces
- Rooftop Leisure Spaces
- Commercial Spaces
Kids, seniors and pets
- Children’s Play Area
- Senior Citizen Zones
- Pet Zone
Clubhouse and leisure
- Clubhouse
- Multipurpose Hall
- Party Lawn
- Convenience Retail
Green and outdoor spaces
- Landscaped Gardens
- Open Green Zones
Safety and convenience
- Dedicated Parking
- Visitor Parking
More amenities
- Barbecue Areas
Sobha One World location and nearby places
Sobha One World is in Hoskote, Bengaluru. Old Madras Road (NH-75) is 2 km away; Hoskote Bus Stand is 3 km away. For daily life, the nearest hospital is MVJ Medical College Hospital (6 km), the nearest school is MVJ Medical College & Research Hospital (6 km) and the nearest supermarket is Orion Uptown Mall (1.3 km). Distances are approximate road distances.
Transit near Sobha One World
- Old Madras Road (NH-75)Nearest2.0 km
- Hoskote Bus Stand3.0 km
Schools near Sobha One World
- MVJ Medical College & Research HospitalNearest6.0 km
- Global Residential School7.0 km
- New Baldwin International School8.0 km
- Narayana e-Techno School9.0 km
Hospitals near Sobha One World
- MVJ Medical College HospitalNearest6.0 km
- Silicon City Hospital8.0 km
Shopping near Sobha One World
- Orion Uptown MallNearest1.3 km
- Gramiq Hypermart4.4 km
Leisure near Sobha One World
- Hoskote Lake4.0 km
Infrastructure near Sobha One World
- Bangalore-Chennai ExpresswayNearest5.0 km
- Satellite Town Ring Road (STRR)8.0 km
Approximate road distances. Where the developer did not publish a distance, we estimated it from the site pin (13.0575 N, 77.7727 E): straight-line distance multiplied by 1.30 for roads, using places within 10 km.
Check travel time from Sobha One World
About the developer, Sobha Limited

Sobha LimitedListed company
Listed Bengaluru builder that makes much of its own building material in-house
Sobha Limited is a Bengaluru-based developer, started in 1995 by P.N.C. Menon. It began as an interior design firm and now builds homes and offices in several Indian cities.
What makes it different. Most developers hire contractors to build. Sobha does its own design and construction and makes many of its own materials, such as woodwork, glazing and concrete products. For a buyer, that usually means more consistent quality from tower to tower.
Projects you may know. Sobha City, Sobha Royal Pavilion and Sobha Dream Acres in Bengaluru.
Sobha One World payment plan
Construction Linked Plan. You pay in stages as the building goes up, so the full price is not due on day one. Each instalment falls due only when the developer finishes a construction stage, and the exact schedule is written into your agreement for sale.
- At booking. Pay the booking amount, then sign and register the agreement for sale. Stamp duty and registration are paid at this stage.
- During construction. Instalments are linked to stages such as the foundation and each floor slab. With a home loan, the bank pays these stages directly to the developer.
- At possession (December 2032). The last instalment is paid when the building is complete, along with the maintenance deposit and other one-time charges.
Sobha One World home loan EMI
Pick a home type to see the monthly EMI on an 80% home loan, or adjust the loan, rate and tenure.
8.5% is a starting assumption; use the rate your bank offers you. During construction you usually pay only interest (pre-EMI) on the amount the bank has released; the full EMI starts after possession.
The 1 BHK needs a household take-home of about ₹1.94 L a month
Banks usually keep all your EMIs within about 40% of take-home pay. These figures assume an 80% loan at 8.5% for 20 years, and no other loans. You also need about ₹22.4 L upfront for the 1 BHK.
- 1 BHKEMI ₹77,800 a month · upfront ₹22.4 L₹1.94 L/month
- 2 BHK LuxEMI ₹1.13 L a month · upfront ₹32.6 L₹2.83 L/month
- 2 BHK GrandeEMI ₹1.28 L a month · upfront ₹37 L₹3.21 L/month
- 3 BHK LuxEMI ₹1.63 L a month · upfront ₹46.8 L₹4.06 L/month
- 3 BHK GrandeEMI ₹1.95 L a month · upfront ₹56.2 L₹4.88 L/month
- 4 BHK LuxeEMI ₹2.31 L a month · upfront ₹66.6 L₹5.78 L/month
- 4 BHK GrandeEMI ₹2.68 L a month · upfront ₹77.2 L₹6.7 L/month
Sobha One World RERA registration
| RERA number | PRM/KA/RERA/1250/304/PR/080526/008634 |
|---|---|
| RERA status | Approved |
| Towers | 14 Towers, Up to 46 Floors |
| Floors | 54 |
| RERA Registration Date | 08 May 2026 |
| Plan Approval | STRRPA, 07 May 2026 |
| Master Plan | 300 Acres |
| Carpet Area | 444 to 1,455 Sq.Ft. |
What the RERA filing says
| Homes registered | 542 |
|---|---|
| Car parking | 542 spaces (542 covered), about 1 per home |
| Open area | About 74% of the land is left open |
| Water source | Borewell, local authority supply |
| Clubhouse and community hall | About 44,940 Sq.Ft., roughly 83 Sq.Ft. per home |
| Swimming pool | About 1,610 Sq.Ft. |
| Facilities filed | Piped gas: No · Power backup: Yes · Sewage treatment plant: Yes · Rainwater harvesting and renewable energy: No · Smart home automation: No · CCTV: Yes |
| Plan approved by | Satellite Town Ring Road Planning Authority, on 07-05-2026 |
| Land | No joint development agreement declared |
| Litigation on the land | Yes, declared in the filing: Civil case OS 34 (2022), Senior Civil Judge and JMFC Hoskote, status: pending; Civil case FDP. 23 (2023), Senior Civil Judge and JMFC Hoskote, status: pending; Civil case O.S. 855 (2023), Senior Civil Judge and JMFC Hoskote, status: pending; Civil case O.S. 1586 (2022), Senior Civil Judge and JMFC Hoskote, status: pending; Civil case O.S.283 (2024), Senior Civil Judge and JMFC Hoskote, status: pending. Ask the developer how it affects your unit. |
| Payment for the land still pending | No |
| Borrowing against the project | No |
| Project cost certified by a CA | ₹901 Cr, of which land ₹92.3 Cr |
| Developer's earlier projects listed | 51, with a pending case on 48 |
Read from the Karnataka RERA filing on 16 November 2026. These are the developer's own declarations to the regulator.
Sobha One World timeline
Keys are about 6 years away
K-RERA registration in May 2026; possession is due in Dec 2032. About 9% of the wait is behind you.
- Price revised
1 BHK homes now start at ₹1.12 Cr and 4 BHK homes at ₹3.33 Cr.
- 37.1% of phases 2 to 6 booked
Sobha's K-RERA filing of 14 October 2026 shows 1,092 of 2,942 homes booked across phases 2 to 6 (wings 3 to 14), up from 734 on 13 July 2026. That is 358 more bookings in three months. Phase 6 is 62.7% booked and Phase 5 is 62.3% booked.
- Strong sales continue
Sobha named One World among the drivers of its record first-half bookings of ₹5,862 Cr.
- About 40 percent sold at launch
Sobha One World made up about 45 percent of Sobha's record ₹3,656 Cr bookings for the April to June 2026 quarter.
- Official launch
Sobha released 3,484 homes on 47.4 acres in Phase 1.
- EOI opened
Expressions of interest opened for Phase 1.
- K-RERA registration
Phase 1 registered under PRM/KA/RERA/1250/304/PR/080526/008634, with further phases registered alongside it.
Sobha One World review: is it a good buy?
Strong on developer record and amenities. Weaker on value for money and time to move in.
- Value for money4.0₹15,300 per Sq.Ft. vs ₹12,800 for a typical East Bengaluru project (36 compared), 19% above
- Developer record9.569.6 million Sq.Ft. delivered, listed company
- Location and daily needs8.0Nearest daily needs 1.3 to 6 km away
- Paperwork and risk6.0Litigation declared, land owned outright
- Space, parking and density7.0About 74 homes per acre, 74% of the land open, 1 parking spaces per home
- Time to move in4.0Possession December 2032, about 6 years away
- Amenities9.0About 83 Sq.Ft. of clubhouse per home, no piped gas
How the BNP Score works
The BNP Score is our own rating, worked out with the same rules for every project from its RERA filing, its price list and our own research. It has seven parts: value for money (20%), the price per Sq.Ft. against nearby projects, adjusted for how much of what you pay for is carpet area; developer record (20%), from published delivery figures; location and daily needs (20%); paperwork and risk (15%), from land ownership, declared litigation, water source and payment plan; space and density (10%); time to move in (10%); and clubhouse space per home (5%). When a part has no published data, we leave it out and say so rather than guess. We only score projects approved under RERA. It is a starting point for comparison, not financial advice.
Our verdict. This is one of the strongest large launches in East Bengaluru this year. A Sobha-built home, a planned township and a starting price near ₹1.1 Cr explain why it is selling quickly. We see steady interest from people working in Whitefield who want a branded home without Whitefield prices.
Good for: investors who can wait six to seven years, and young families buying ahead of need.
Think twice if: you need to move in within two or three years, or your daily commute depends on the metro.
Pros
- Low entry price for Sobha. Homes start at ₹1.12 Cr, which is rare for a Sobha project in Bengaluru.
- Built by Sobha itself. In-house construction and a long record of finished projects in Bengaluru.
- Every size in one place. 1, 2, 3 and 4 BHK homes in the same community.
- Lots of open space. A full-size cricket ground, sports courts and large green areas.
- Real demand. 37.1% of phases 2 to 6 were booked by October 2026.
- Good road access. Old Madras Road takes you to Whitefield and KR Puram.
Cons
- Long wait. Handover is due by December 2032, about six years away. If you take a home loan, you may pay EMIs before you can move in or rent it out.
- Outside city limits. Hoskote is outside the Bengaluru city corporation, so roads, water and drainage are still catching up.
- No metro yet. A metro line to Hoskote is only a proposal for now.
- Very large township. Building work will carry on nearby for years after you move in.
Sobha One World is 19% pricier per sq ft than a typical East Bengaluru project
Compared with 36 other new apartment projects in East Bengaluru, using the price per sq ft of saleable area for the lowest-priced home on sale. It ranks 28 of 37, cheapest first. The dashed line marks the median.
- Also in Hoskote
- Assetz Naru and Nami₹10,500
- Godrej Parkshire₹11,100
2 of 4 daily needs are within walking distance
The nearest is shopping at 1.3 km and the farthest is healthcare at 6 km.
- ShoppingOrion Uptown Mall1.3 km
- TransportOld Madras Road (NH-75)2 km
- EducationMVJ Medical College & Research Hospital6 km
- HealthcareMVJ Medical College Hospital6 km
Sobha One World FAQs
What is Sobha One World?
A new township by Sobha Limited in Hoskote, East Bengaluru. Phase 1 has 3,484 flats on 47.4 acres, part of a 300-acre plan that will also have shops and offices.
Is Sobha Hoskote the same as Sobha One World?
Yes. When people search for Sobha Hoskote, they usually mean Sobha One World, Sobha's township on Old Madras Road in Hoskote. It is sold as One Residences at Sobha One World.
What is the price of Sobha One World Hoskote?
What will I pay on top of the base price?
For an under-construction home, add 5% GST and about 6.6% for stamp duty and registration in Karnataka. Car parking, maintenance deposit and club charges are usually extra. Ask us for the full cost sheet for the unit you like.
When can I move in?
The RERA completion date for Phase 1 is December 2032, about six years from now.
Is Sobha One World RERA approved?
Yes. Phase 1 is registered with Karnataka RERA under PRM/KA/RERA/1250/304/PR/080526/008634, approved on 8 May 2026. RERA approval means the plans and completion date are on record with the regulator, and the builder must keep 70% of buyers' payments in a separate project account.
How do I pay for a home here?
It is a construction linked plan. You pay a booking amount first, then the rest in stages as the towers are built, instead of all at once.
How many homes are sold at Sobha One World?
As per Sobha's K-RERA filing of 14 October 2026, 1,092 of the 2,942 homes in phases 2 to 6 are booked, which is 37.1%. Phase 6 is 62.7% booked, Phase 5 is 62.3%, Phase 4 is 22.3% and Phase 2 is 17.5%. Phase 3 has no bookings yet, and 1,850 homes are still available.
What sizes are available?
1, 2, 3 and 4 BHK homes from 740 Sq.Ft. for a 1 BHK to 2,432 Sq.Ft. for the largest 4 BHK. The usable carpet area is 444 to 1,455 Sq.Ft.
Where exactly is Sobha One World?
At Amanidoddakere village in Hoskote, about 2 km from Old Madras Road (NH-75), on the eastern edge of Greater Whitefield.
What amenities will residents get?
A full-size cricket ground, tennis and pickleball courts, a skating rink, an amphitheatre, a pet park, a clubhouse with pool and gym, gardens, play areas and shops inside the township.
Is Sobha One Residences the same as Sobha One World?
Yes. One Residences at Sobha One World is the name Sobha uses for the homes in this township. It is the same Hoskote project, with the same RERA number, prices and phases shown on this page.
Is Sobha Trinity the same as Sobha One World?
Yes. Sobha Trinity was the early codename for this Hoskote land. The project launched as Sobha One World in June 2026.
Compare Sobha One World
Projects near Sobha One World
15 listed projects are within 5 km of Sobha One World. The closest shown here is Godrej Parkshire, about 1.7 km away.






Distances are straight-line from the project's map location; road distance is usually 20 to 40% longer.
Latest news
Recent news on Sobha Limited, Bengaluru and Karnataka.
- Sobha Bellevue Registered in Feroke, Kozhikode: 298 Homes From ₹3.21 Cr
- Q2 FY27 Real Estate Results: Godrej, Prestige, Lodha, Sobha and 3 More Developers Compared
- Sobha Posts Record H1 FY27 Sales of ₹5,862 Crore, Bengaluru Brings In 58%
- Building a House in Bengaluru Now Costs 10–25% More as Material Prices Climb After the West Asia Conflict
- ED Files Money Laundering Complaint Against Ozone Group Over Alleged ₹1,305 Crore Homebuyer Fraud in Bengaluru
- Karnataka Plans a Digital Tool to Flag Legal Risks Before You Buy Property in Bengaluru
See also
Buyer guides
Ask anything about this project. Our research team replies with what the filings show.