New Launch RERA registered Shivanahalli, Yelahanka, Bengaluru

HM Eterno, Yelahanka – 2 & 3 BHK Apartments in Bengaluru

By HM Constructions · Researched by BookNewProperty

HM Eterno is a 95-home, low-rise project of nine basement-plus-four-floor blocks on 1.20 acres in Shivanahalli, off Jakkur Road near Kogilu in Yelahanka. HM Infratech registered it with K-RERA on 17 November 2026, when its filing already showed 48% of development done, with completion due by 30 April 2028.

PossessionApril 2028
Homes
2 & 3 BHK Apartments
Possession
April 2028
Site area
1.20 Acres
Total homes
95 Homes
RERA number
PRM/KA/RERA/1251/309/PR/171126/009105
Quick verdict

HM Eterno suits a family that wants a mid-size 3 BHK in a quiet, low-rise block on the Yelahanka side of the airport corridor, from a developer with a long Bengaluru record, and that prefers a project already half built to one that has just broken ground. The trade-offs are a small site of 79 homes an acre with token amenities, borewell and tanker water, and a promoter whose HM Crescendo buyers have had revocation complaints pending on K-RERA since 2021.

  • Construction is already under way: the filing reports 48% of development done and ₹29.97 Cr spent at registration.
  • Low-rise layout of nine blocks with a basement, ground and four floors, holding 8 to 15 homes each.
  • Roomy 3 BHKs: 47 homes of 991 to 1,108 Sq.Ft. carpet, most of them above 1,060 Sq.Ft.
  • The K-RERA portal lists 12 complaints against the promoter, all from HM Crescendo buyers seeking revocation of that registration and pending orders since 2021.
  • A small 1.20-acre site at about 79 homes per acre, with roughly 306 Sq.Ft. of open area per home and parks marked as not provided.
  • Token amenities: a pool of about 720 Sq.Ft., a 422 Sq.Ft. gym and a 299 Sq.Ft. games room, with no outdoor sports area.

About HM Eterno

HM Eterno is a compact, low-rise apartment project on Sy No. 15/3 in Shivanahalli village, Yelahanka hobli, with Jakkur Road along its eastern edge. The filed site pin sits in Prakruthi Nagar near Kogilu, between Bellary Road and Jakkur Road. The land measures 4,856 sq m, or 1.20 acres, and is held under a joint development agreement registered in May 2016 with four landowners. The khata is an A Khata issued on 2 July 2024.

The plan approved on 2 January 2026 places 95 homes in nine blocks, A to H and J. Each block has a basement, a ground floor and four upper floors, and stands 14.95 m tall, just under the 15 m line above which a fire-department NOC is needed. Blocks hold between 8 and 15 homes. The mix is 47 three-bedroom homes of 991 to 1,108 Sq.Ft. carpet, 47 two-bedroom homes of 539 to 890 Sq.Ft., and one 1.5 BHK of 738 Sq.Ft. Blocks A and J are all 3 BHK; blocks D and E are all 2 BHK.

This is not a fresh launch. The filing gives a start date of 1 August 2025 and reports 48% of development done and ₹29.97 Cr spent by the time it was registered on 17 November 2026. The total project cost filed is ₹71.12 Cr, including ₹19.55 Cr for land. No borrowing and no land litigation are declared. Water is to come from borewells and tankers.

Amenities are modest and fitted into the basement-and-podium plan: a swimming pool of about 720 Sq.Ft., a gym of 422 Sq.Ft., a community hall of 610 Sq.Ft. and an indoor games room of 299 Sq.Ft. The filing marks outdoor sports, parks and piped gas as not provided. All 105 parking lots are covered, which works out to one lot for each home and ten spare.

HM Eterno price list and sizes

HM Eterno prices by home type
Home typeCarpet areaPrice
1.5 BHKLimited738 Sq.Ft.Get price
2 BHKAvailable539 – 890 Sq.Ft.Get price
3 BHKAvailable991 – 1,108 Sq.Ft.Get price

Unit Schedule Filed with K-RERA

These figures are from the unit-wise list filed with Karnataka RERA. Areas are converted from square metres at 1 sq m = 10.7639 Sq.Ft. The developer has not published saleable sizes, so no loading is calculated.

Type Homes Carpet area Balcony area
1.5 BHK 1 738 Sq.Ft. 25 Sq.Ft.
2 BHK 47 539 – 890 Sq.Ft. 13 – 111 Sq.Ft.
3 BHK 47 991 – 1,108 Sq.Ft. 32 – 266 Sq.Ft.
Total 95 83,365 Sq.Ft. 10,648 Sq.Ft.

The 2 BHK homes fall in two groups: 30 of 539 to 670 Sq.Ft. that fill blocks D and E, and 17 of 778 to 890 Sq.Ft. in blocks B, C, F, G and H. The most common 3 BHK sizes are 1,092 and 1,108 Sq.Ft. Blocks A and J hold only 3 BHKs, D and E only 2 BHKs. Every home is allotted one parking lot.

HM Eterno amenities

HM Eterno lists 12 amenities, including clubhouse, swimming pool, gymnasium, community hall and indoor games room.

Sports and fitness

  • Gymnasium

Pools and wellness

  • Swimming Pool

Clubhouse and leisure

  • Clubhouse
  • Community Hall
  • Indoor Games Room

Green and outdoor spaces

  • Street Lighting

Safety and convenience

  • CCTV Surveillance
  • Power Backup
  • Lifts
  • Basement Car Parking
  • Sewage Treatment Plant
  • Rainwater Harvesting

Density, Parking and Open Space

The land is 4,856 sq m (1.20 acres). Buildings cover 2,154 sq m, or 44% of it, and 2,701 sq m is left open. With 95 homes that gives about 79 homes per acre and roughly 306 Sq.Ft. of open area per home, which is dense for a low-rise project. The filed built-up area is 15,250 sq m (1.64 lakh Sq.Ft.) including the basement, against a sanctioned FAR of 2.5.

Parking is in a single basement of 3,334 sq m with 105 covered lots, about 1.1 per home. The filing marks parks, outdoor sports and open parking as not provided.

How the Distances Were Worked Out

The filing gives the site pin as 13.10106, 77.61624, which falls in Prakruthi Nagar near Kogilu, consistent with the filed address on Jakkur Road in Shivanahalli. Each landmark was located on OpenStreetMap (Nominatim for places, OpenStreetMap station data for metro and rail stations). The straight-line distance from the pin was then multiplied by 1.3 to allow for roads. Only places within 10 km are listed. Metro stations marked under construction are on the Blue Line to the airport.

HM Eterno location and nearby places

HM Eterno is in Shivanahalli, Yelahanka, Bengaluru. Kogilu Cross, Bellary Road is 2.2 km away; Yelahanka metro station, Blue Line, under construction is 2.3 km away; Bagalur Cross metro station, Blue Line, under construction is 2.8 km away. For daily life, the nearest hospital is Aster CMI Hospital (7.6 km), the nearest school is REVA University (3.4 km) and the nearest supermarket is Phoenix Mall of Asia (5.7 km). Distances are approximate road distances.

Tiles © Esri
HM Eterno, Shivanahalli, Yelahanka, BengaluruGet directions

Transit near HM Eterno

  • Kogilu CrossNearestBellary Road2.2 km
  • Yelahanka metro stationBlue Line, under construction2.3 km
  • Bagalur Cross metro stationBlue Line, under construction2.8 km
  • Yelahanka Junction railway station3.5 km
  • Jakkur Aerodrome4.3 km
  • Jakkur Cross metro stationBlue Line, under construction5.5 km

Schools near HM Eterno

  • REVA UniversityNearest3.4 km
  • Canadian International School4.1 km
  • Nitte Meenakshi Institute of Technology5.7 km
  • Vidyashilp Academy6.0 km
  • Sir M Visvesvaraya Institute of Technology7.1 km

Hospitals near HM Eterno

  • Aster CMI HospitalNearestHebbal7.6 km
  • Manipal HospitalBellary Road7.9 km

Shopping near HM Eterno

  • Phoenix Mall of AsiaNearest5.7 km
  • Esteem MallHebbal8.2 km

Leisure near HM Eterno

  • Jakkur LakeNearest2.2 km
  • Yelahanka Lake3.3 km

Infrastructure near HM Eterno

  • Yelahanka New TownNearest5.0 km
  • Hebbal flyover junction9.7 km

Work Hubs near HM Eterno

  • Manyata Tech Park7.7 km

Approximate road distances from the project gate.

Check travel time from HM Eterno

HM EternoShivanahalli, Yelahanka, Bengaluru
Try:
Have a question about this project?Ask our research team. We answer from the RERA filings, and never share your details.
Ask a question

About the developer, HM Constructions

HM Constructions

HM Eterno is promoted by HM Infratech Private Limited, part of the HM group that markets its projects under the HM Constructions name from HM Geneva House on Cunningham Road. HM says it was set up in 1991 and has completed over 60 projects in Bengaluru, including HM Tropical Tree in RT Nagar, HM Grandeur on Wheelers Road and HM Indigo in JP Nagar.

The K-RERA record lists two earlier registrations for this promoter: HM Crescendo (PRM/KA/RERA/1251/310/PR/180516/001711, registered 16 May 2018, a joint promotion with Pedigree Constructions) and HM Scottsville (PRM/KA/RERA/1251/446/PR/181224/007307, registered 18 December 2024, in Junnasandra off Sarjapur Road, due 30 June 2027).

The portal shows 12 complaints against the promoter and none against HM Eterno. All 12 concern HM Crescendo. They were filed between February and August 2021 by an owners’ association and 11 individual buyers, each asking for HM Crescendo’s registration to be revoked, and all are listed as posted for orders before the full bench.

HM Eterno RERA registration

RERA numberPRM/KA/RERA/1251/309/PR/171126/009105
RERA statusApproved
K-RERA Acknowledgement No.ACK/KA/RERA/1251/309/PR/270726/010460
Registration Date17 November 2026
Promoter EntityHM Infratech Private Limited
Plan Approved ByGreater Bengaluru Authority (BBMP), 2 January 2026
Approved Plan No.GBA/BNCC/Addl.CTP/0007/25-26
Survey NumberSy No. 15/3, Shivanahalli village, Yelahanka hobli
Blocks9 blocks, basement + ground + 4 floors
Building Height14.95 m
Covered Parking105 lots
Open Area2,701 sq m, 56% of the land
Work Completed48% at registration
Project Cost Filed₹71.12 Cr
Land ArrangementJoint development with four landowners
Borrowing DeclaredNone
Land Litigation DeclaredNone
Water SourceBorewell and tankers
Escrow BankAxis Bank, Bengaluru
Complaints on K-RERA0 on this project, 12 on the promoter

Source Notes

  • Project facts: all unit, area, cost, schedule, amenity and complaint figures are from the K-RERA filing for PRM/KA/RERA/1251/309/PR/171126/009105, read on 23 November 2026.
  • Developer website: hmconstructions.com lists HM Scottsville, HM Tropical Tree, HM Indigo, HM Grandeur and HM Crescendo but has no HM Eterno page, no price and no renders. The price fields are left empty and no project image is used.
  • Promoter name: property listings name the developer as HM Constructions. The registered promoter is HM Infratech Private Limited.
  • Sizes in circulation: an unofficial “HM @ Yelahanka” pre-launch microsite, not run by HM and no longer online, quoted 2 and 3 BHK sizes of 1,086.98 to 1,817.92 Sq.Ft. and two homes per floor. The filing shows carpet areas of 539 to 1,108 Sq.Ft. and three homes per floor in blocks D and E.
  • Clubhouse area: the filing gives the clubhouse as 13,397 sq m, which is larger than the whole 4,856 sq m site and almost the entire built-up area. It is treated as an entry error; the separate pool, gym, hall and games room areas are used instead.
  • Dates: the project start date of 1 August 2025 is earlier than the plan approval of 2 January 2026 and the registration of 17 November 2026.
  • Land parcels: the land section lists four holdings under Sy No. 15/3 with extents written as 1.02, 2.04, 2.04 and 4.08 guntas, which do not add up to the 4,856 sq m total. The khata entries and uploaded deeds also refer to Sy Nos. 15/5, 15/6 and 15/7 and an amalgamation deed.
  • Fire safety: fire protection is marked Yes under infrastructure, but fire-fighting fittings are marked No under finishing works. The 14.95 m height keeps the blocks below the high-rise fire NOC threshold.
  • Water: the source is filed as borewell and tankers, while a BWSSB NOC is among the uploads.

HM Eterno timeline

Where it stands today

Keys are about 1.3 years away

K-RERA registration in Nov 2026; possession is due in Apr 2028. The wait has only just begun.

Today
K-RERA registrationNov 2026Possession dueApr 2028
  1. RERA completion date

    The filing gives 30 April 2028 as the proposed completion date.

  2. K-RERA registration

    HM Eterno was registered as PRM/KA/RERA/1251/309/PR/171126/009105, with 48% of development reported complete and ₹29.97 Cr spent.

  3. K-RERA application filed

    The application was acknowledged as ACK/KA/RERA/1251/309/PR/270726/010460. K-RERA then raised queries on title, the encumbrance certificate, carpet areas and the BESCOM NOC, answered between August and November 2026.

  4. Building plan approved

    The plan GBA/BNCC/Addl.CTP/0007/25-26 was approved on 2 January 2026.

  5. Construction start date filed

    The K-RERA filing gives 1 August 2025 as the project start date, with earthwork, footings and the basement retaining wall scheduled from August 2025.

What to Verify Before You Commit

  • Read the order status of the 12 HM Crescendo complaints on the K-RERA portal and ask HM how they were resolved.
  • Get HM’s written answer to K-RERA’s query about the agreement-of-sale entry in the encumbrance certificate, and the title and amalgamation papers for Sy Nos. 15/3, 15/5, 15/6 and 15/7.
  • Ask for the commencement certificate or the authority’s letter allowing work from August 2025, given that the plan was approved in January 2026.
  • Check the carpet and balcony area of your exact unit in the agreement for sale against the K-RERA unit list.
  • Ask for the price per Sq.Ft. on carpet area and how the saleable area is calculated.
  • Confirm the real size and location of the clubhouse, pool and gym on the sanctioned plan.
  • Ask how water will be supplied after handover and what the tanker cost is expected to be.
  • Confirm which basement parking lot is allotted to your unit in writing.
  • Make every payment only to the project’s K-RERA escrow account at Axis Bank.

HM Eterno review: is it a good buy?

BNP ScoreRERA approved
3.3 out of 5

  • Developer record
    6.0Limited published delivery record
  • Location and daily needs
    7.0Nearest daily needs 2.2 to 7.6 km away
  • Space and density
    6.5About 79 homes per acre
  • Time to move in
    7.0Possession April 2028, about 1.3 years away
  • Amenities
    7.012 amenities listed

Not scored yet: value for money (price not published); paperwork and risk (not enough filing details on this page yet). The score is worked out from the other parts.

How the BNP Score works

The BNP Score is our own rating, worked out with the same rules for every project from its RERA filing, its price list and our own research. It has seven parts: value for money (20%), the price per Sq.Ft. against nearby projects, adjusted for how much of what you pay for is carpet area; developer record (20%), from published delivery figures; location and daily needs (20%); paperwork and risk (15%), from land ownership, declared litigation, water source and payment plan; space and density (10%); time to move in (10%); and clubhouse space per home (5%). When a part has no published data, we leave it out and say so rather than guess. We only score projects approved under RERA. It is a starting point for comparison, not financial advice.

HM Eterno suits a family that wants a mid-size 3 BHK in a quiet, low-rise block on the Yelahanka side of the airport corridor, from a developer with a long Bengaluru record, and that prefers a project already half built to one that has just broken ground. The trade-offs are a small site of 79 homes an acre with token amenities, borewell and tanker water, and a promoter whose HM Crescendo buyers have had revocation complaints pending on K-RERA since 2021. With no price published yet, the value case cannot be judged.

Pros

  • Construction is already under way: the filing reports 48% of development done and ₹29.97 Cr spent at registration.
  • Low-rise layout of nine blocks with a basement, ground and four floors, holding 8 to 15 homes each.
  • Roomy 3 BHKs: 47 homes of 991 to 1,108 Sq.Ft. carpet, most of them above 1,060 Sq.Ft.
  • All 105 parking lots are covered, in the basement, for 95 homes.
  • No borrowing and no land litigation declared; A Khata and a registered joint development agreement.
  • About 2.3 km from the under-construction Yelahanka station on the airport Blue Line and 2.2 km from Kogilu Cross on Bellary Road.
  • HM has been building in Bengaluru since 1991 and has two earlier K-RERA registrations.

Cons

  • The K-RERA portal lists 12 complaints against the promoter, all from HM Crescendo buyers seeking revocation of that registration and pending orders since 2021.
  • A small 1.20-acre site at about 79 homes per acre, with roughly 306 Sq.Ft. of open area per home and parks marked as not provided.
  • Token amenities: a pool of about 720 Sq.Ft., a 422 Sq.Ft. gym and a 299 Sq.Ft. games room, with no outdoor sports area.
  • Water is to come from borewells and tankers, an ongoing cost and supply risk in north Bengaluru.
  • Ten of the 2 BHK homes are under 600 Sq.Ft. carpet, so the 2 BHK label covers a wide range from 539 to 890 Sq.Ft.
  • The filed start date of 1 August 2025 is five months before the plan approval of 2 January 2026, and the commencement certificate is uploaded as not applicable.
Daily needs

2 of 4 daily needs are a short drive away

The nearest is transport at 2.2 km and the farthest is healthcare at 7.6 km.

WalkShort driveDrive
  • TransportKogilu Cross, Bellary Road
    2.2 km
  • EducationREVA University
    3.4 km
  • ShoppingPhoenix Mall of Asia
    5.7 km
  • HealthcareAster CMI Hospital, Hebbal
    7.6 km
02 km5 km10 km
Not sure it fits your budget or plans?Our advisor will compare it with similar projects for you, free.
Get a free second opinion

HM Eterno FAQs

What is the K-RERA number of HM Eterno?

HM Eterno is registered with Karnataka RERA as PRM/KA/RERA/1251/309/PR/171126/009105, dated 17 November 2026. The promoter is HM Infratech Private Limited.

Where exactly is HM Eterno?

It is on Sy No. 15/3 in Shivanahalli village, Yelahanka hobli, Bengaluru North taluk, PIN 560064, with Jakkur Road on its eastern boundary. The filed pin is in Prakruthi Nagar near Kogilu, about 2.2 km from Kogilu Cross on Bellary Road.

What sizes are the apartments?

By the K-RERA filing, the 2 BHK homes measure 539 to 890 Sq.Ft. carpet, the 3 BHK homes 991 to 1,108 Sq.Ft. carpet, and the single 1.5 BHK 738 Sq.Ft. carpet. Balconies add between 13 and 266 Sq.Ft. depending on the unit.

What is the price of HM Eterno?

HM has not published a price for HM Eterno on its website, and no developer price list is available, so the price fields are left blank.

When will HM Eterno be completed?

The proposed completion date filed with K-RERA is 30 April 2028. The filing reports 48% of development done at registration.

How many homes and blocks are there?

There are 95 homes in nine blocks, each with a basement, ground and four upper floors, on 1.20 acres. That is about 79 homes per acre.

Are there complaints against the developer?

There are none against HM Eterno. The K-RERA portal lists 12 complaints against the promoter, all filed in 2021 by HM Crescendo buyers and an owners association seeking revocation of that project's registration; they are posted for orders.

What is the water source?

The filing names borewells and tankers as the water source, although a BWSSB NOC has also been uploaded.

Compare HM Eterno

This projectHM EternoHandover 20282 & 3 BHK

Projects near HM Eterno

10 listed projects are within 5 km of HM Eterno. The closest shown here is MAIA Pelican Gardens, about 2.1 km away.

Distances are straight-line from the project's map location; road distance is usually 20 to 40% longer.

Latest news

Recent news on Bengaluru and Karnataka.

See also

Buyer guides

Enquire About HM Eterno

Ask anything about this project. Our research team replies with what the filings show.

Secure30 min callbackNo spam