Prestige Camden Gardens, Thanisandra: Resale Prices, Floor Plans & Review

Prestige Camden Gardens is a single-tower Prestige Group residence on Thanisandra Main Road in North Bengaluru, with spacious 3 and 4 BHK apartments, a clubhouse and pool, close to Manyata Tech Park and Hebbal.

It is a sold out project offering 3, 4 BHK homes from ₹3.32 Crore, with possession due in Dec 2027. Its RERA registration number is PRM/KA/RE RA/1 251 /472/PR/140524/006872.

Prestige Camden Gardens Banner
3 Photos
1 / 3

Prestige Camden Gardens Overview

Verified by Vikash S on
Project Name
Prestige Camden Gardens
Developer
Prestige Group
Location
Thanisandra Main Road, Bengaluru
Property Type
Apartments
Project Type
Standalone Project
Starting Price
₹3.32 Crore Onwards
Configuration
3, 4 BHK
Total Area
1.83 Acres
Total Units
117 Units
Project Status
Sold Out
Possession
Dec 2027
Availability
Sold Out
Payment Plan
Time-Bound Payment Plan
RERA Status
Approved
RERA Number
PRM/KA/RE RA/1 251 /472/PR/140524/006872
Brochure & Details
Get the Prestige Camden Gardens Brochure & Instant Details

Download the full brochure or get quick answers on WhatsApp.

About Prestige Camden Gardens

Prestige Camden Gardens is a premium residential development by the renowned Prestige Group, strategically located on Thanisandra Main Road in North Bangalore. Designed as a low-density, boutique community, the project offers a refined living experience with just a single high-rise tower rising up to 20 floors. With a limited number of residences, it ensures enhanced privacy, exclusivity, and a peaceful environment – making it an ideal choice for discerning homebuyers seeking a more intimate and upscale lifestyle.

The project features thoughtfully designed 3 and 4 BHK luxury apartments, with spacious layouts, large balconies, and efficient floor plans that maximize natural light and ventilation. Inspired by the classic charm of London’s Camden Town, the architecture and landscape design bring together modern aesthetics and elegant detailing, creating a distinctive identity in one of Bangalore’s fastest-growing corridors. Each home is crafted to deliver both comfort and sophistication, catering to modern urban families.

Prestige Camden Gardens is well-equipped with a curated selection of lifestyle amenities that support wellness, recreation, and community living. Residents can enjoy a fully equipped clubhouse, swimming pool, landscaped open spaces, fitness zones, and dedicated areas for children and social gatherings. Despite its compact land parcel, the project has been intelligently planned to include meaningful open spaces and lifestyle features, ensuring a balanced living environment.

One of the strongest advantages of the project is its strategic location. Situated close to Manyata Tech Park and Bhartiya City, it offers excellent connectivity to key employment hubs, educational institutions, healthcare centers, and retail destinations. The proximity to Outer Ring Road, Hebbal, and the Kempegowda International Airport further enhances its appeal for both end-users and investors. Thanisandra’s rapid infrastructure growth and strong rental demand make this project a promising investment opportunity as well.

Overall, Prestige Camden Gardens stands out as a niche luxury offering in North Bangalore. It is best suited for buyers who prioritize exclusivity, brand value, and a premium living environment over large township-style developments. With its limited inventory, strong location fundamentals, and the trust of the Prestige brand, the project presents a compelling option for both comfortable living and long-term value appreciation.

Prestige Camden Gardens Price List

Prestige Camden Gardens prices start at ₹3.32 Cr. The full price list is shared on request. The 3 BHK Smart, 3 BHK Optima, 3 BHK Prima, 3 BHK Supreme and 4 BHK Ultima are sold out.

Home typeSizePriceAvailability
3 BHK Smart 1578 sq.ft. — Sold Out
3 BHK Optima 1851 sq.ft. — Sold Out
3 BHK Prima 2037 sq.ft. — Sold Out
3 BHK Supreme 2149 sq.ft. — Sold Out
4 BHK Ultima 2732 sq.ft. — Sold Out
Official Documents
Download Price List & Cost Sheet

Unit-wise pricing and the complete cost breakup, sent instantly to your phone.

GST & Other Charges

Charge Rate Details
GST on Apartment Cost 5% (no ITC) 1% for affordable housing (≤ ₹45L, ≤ 60 sqm carpet).
Registration Charges 1% Of property value, paid at the Sub-Registrar office.
Stamp Duty 2–5% Karnataka: 5% above ₹45L, 3% for ₹21L–₹45L, 2% below ₹21L.
BESCOM & BWSSB At actuals Electricity and water connection deposits, as applicable.
Khata / E-Khata At actuals Recorded with the local authority (BBMP, BDA or the village panchayat) for ownership records.
Legal & Documentation At actuals Legal vetting, agreement drafting, sale-deed preparation.
Maintenance Deposit 12 months Advance maintenance, refundable or adjustable.
Corpus Fund One-time As per the sale agreement — society reserve fund.
Club House Per unit Included in base price or charged separately by the developer.
Car Parking Per slot As per the sale agreement — covered or open slot.

Note: Charges are indicative; final amounts are confirmed at the time of booking and subject to applicable laws, project location, and unit specifications.

Prestige Camden Gardens Review: Is It a Good Buy?

VS
Reviewed by
Project Reviewer · BookNewProperty · Verified
4.4 out of 5 6 Pros · 4 Cons

Prestige Camden Gardens positions itself as a boutique luxury project rather than a mass-market development, and that’s exactly where its strength lies. With a limited number of units, premium configurations, and a strategic location near major employment hubs, it caters primarily to end-users seeking exclusivity and lifestyle quality. The project scores high on connectivity, brand trust, and design efficiency, making it a strong residential choice in North Bangalore.

From an investment perspective, a significant portion of early appreciation has already been realized due to strong pre-launch demand and location advantages. However, steady long-term growth remains likely given the continued infrastructure development in Thanisandra and its proximity to IT corridors. Overall, it is best suited for premium buyers and HNIs who value low-density living, brand credibility, and long-term stability over high short-term returns.

Pros 6

  • Prime Location Advantage Situated on Thanisandra Main Road with excellent connectivity to Manyata Tech Park, Hebbal, and key IT corridors
  • Low-Density Living Only ~117–120 units in a single tower, ensuring privacy and exclusivity
  • Premium Brand Value Developed by Prestige Group, known for quality and timely delivery
  • Spacious Configurations Large 3 & 4 BHK units ranging up to ~2732 sq.ft, ideal for luxury living
  • Strong Investment Potential High demand due to proximity to IT hubs and growing North Bangalore corridor
  • Peaceful Residential Pocket Compared to ORR zones, offers a quieter living environment

Cons 4

  • High Ticket Size Entry price starts around ₹2 Cr+, limiting affordability for mid-segment buyers
  • Limited Land Parcel ~1.8 acres, so not a large township with expansive open infrastructure
  • Traffic Bottlenecks Thanisandra Road faces congestion during peak hours
  • Not Ideal for Budget Investors Better suited for premium buyers rather than entry-level investors

Prestige Camden Gardens Plans

Project Layouts
Download Master Plan & Floor Plans

See the site master plan and unit-wise floor plans, sent instantly to your phone.

Prestige Camden Gardens Amenities

Prestige Camden Gardens lists 12 amenities, including camden plaza, swimming pool, kids pool, outdoor gymnasium and kids play area.

Camden Plaza
Swimming Pool
Kids Pool
Outdoor Gymnasium
Kids Play Area
Pickle Ball Court
Yoga Lawn
Reflexology Pathway
Party Lawn
Lawn
Pool Deck
Outdoor Shower

Prestige Camden Gardens Location & Connectivity

Prestige Camden Gardens is in Thanisandra Main Road, Bengaluru. Sofia Public School is 0.2 km away; Curious School is 0.5 km away; Omega Multispeciality Hospital – ~7 is 8 km away. For daily life, the nearest hospital is Omega Multispeciality Hospital – ~7 (8 km) and the nearest school is Sofia Public School (0.2 km). Distances are approximate road distances.

Plan your visit
How far is Prestige Camden Gardens from you?

Nearby Places

  • Thanisandra Main Road Direct access
  • Outer Ring Road (ORR) ~15 mins
  • Hebbal Flyover ~20 mins
  • Yelahanka Railway Station ~5–10 mins
  • BMTC Bus Connectivity Easily available
  • Sofia Public School 0.2 km
  • Curious School 0.5 km
  • Wisdom Montfort International School ~5 mins
  • Reva University ~3.3 km
  • Saamar International School ~1.2 km
  • Sparsh Hospital, Yelahanka ~10 mins
  • Omega Multispeciality Hospital ~7–8 km
  • Nearby clinics & medical centres within 5–10 mins
  • Manyata Tech Park ~1 km
  • Bhartiya City Tech Park ~1 km
  • Hebbal Business Hub ~20 mins
  • IT corridors via ORR & Bellary Road
  • Bhartiya Mall of Bengaluru ~10 mins
  • Spar Hypermarket ~3.6 km
  • Galleria Mall Nearby
  • Local retail & high street outlets within 5–10 mins
  • Bhartiya City Township Nearby
  • Lumbini Gardens / Nagawara Lake ~20 mins
  • Multiple parks & open spaces in vicinity
  • Clubhouses, cafes & leisure hubs nearby
  • Upcoming Metro connectivity (North Bangalore corridor)
  • STRR & Peripheral Ring Road access (future boost)
  • Rapid development in Thanisandra corridor
  • Strong rental demand from IT professionals
Area Guide · Residential

North Bengaluru

Bengaluru's airport side, from Hebbal and Yelahanka out to Devanahalli, with big tech parks and the airport metro on the way.

48more projects
Read the full North Bengaluru Area Guide

About Prestige Group

Prestige Group

Premium Founded 1986 Bengaluru, Karnataka, India
Verified Developer

Prestige Group is one of India’s most reputed and established real estate developers, headquartered in Bangalore. Founded in 1986 by Razack Sattar, the company has grown from a modest beginning into a leading real estate powerhouse with a strong presence across multiple major cities including Bangalore, Chennai, Hyderabad, Mumbai, and Kochi. Over the decades, Prestige has built a solid reputation for delivering high-quality residential, commercial, retail, and hospitality developments.

With a legacy spanning nearly four decades, the group has completed over 300 projects covering more than 180 million square feet of developed area, making it one of the largest developers in South India. Its portfolio includes landmark developments such as luxury residences, integrated townships, IT parks, shopping malls, and premium hotels. The company’s ability to diversify across multiple real estate segments has played a key role in shaping the urban landscape of Bangalore and other major cities.

Prestige Group is led by Irfan Razack along with his brothers Rezwan and Noaman Razack, who have been instrumental in expanding the company’s footprint nationwide. Known for its strong emphasis on quality construction, innovative design, and timely delivery, the developer has earned the trust of homebuyers and investors alike. The brand is also recognized for introducing several landmark and first-of-its-kind developments in South India, setting new benchmarks in the real estate industry.

Today, Prestige continues to be a dominant force in the Indian real estate market, with ongoing and upcoming projects across residential and commercial segments. Backed by a strong track record, premium positioning, and consistent delivery standards, the group remains a preferred choice for buyers seeking reliability, brand value, and long-term investment potential.

350+
Projects
40
Years
10
Cities
200M+
Sq Ft Built

Prestige Camden Gardens Payment Plan

Time-Bound Payment Plan

The exact payment schedule is written into your agreement for sale. Ask for it in writing before you pay the booking amount.

Want the stage-wise schedule with amounts for your unit? Get payment schedule

Investment Growth Potential

Current Price / sqft
₹21,040
Today's market rate
Expected in 5 Years
₹25,000
Projected valuation
Total Growth
18.8%
~3.5% CAGR
Gain / sqft
₹3,960
Absolute appreciation

Prestige Camden Gardens EMI Calculator

Pick a home type to see the monthly EMI on an 80% home loan, or move the sliders to match your own loan.

Home price₹3.32 Cr
You pay upfront₹66 L
Bank loan₹2.66 Cr

The 8.5% rate is only a starting point, so check the rate your bank offers you. While the project is being built, the bank releases the loan in stages and you usually pay only interest (pre-EMI) on the amount released. The full EMI starts after possession. Stamp duty, registration and GST are paid on top of the home price.

Principal Interest
₹2,30,841
Monthly EMI
₹2.88 Cr
Total Interest
₹5.54 Cr
Total Payable

Compare Prestige Camden Gardens

Visit the Project

Schedule a site visit at your convenience. We handle the transportation.

Book Site Visit

Resident Reviews

★ Write a Review
Bought, visited or living at Prestige Camden Gardens? Share your experience to help other buyers.

Prestige Camden Gardens FAQs

Where is Prestige Camden Gardens located?

Prestige Camden Gardens is located on Thanisandra Main Road in North Bangalore, close to Manyata Tech Park and Bhartiya City, offering excellent connectivity to Hebbal, Outer Ring Road, and the airport.

What configurations are available in Prestige Camden Gardens?

The project offers spacious 3 BHK and 4 BHK luxury apartments designed with modern layouts, large balconies, and premium specifications.

What is the starting price of Prestige Camden Gardens?

The starting price for 3 BHK apartments is approximately ₹1.89 crore, while 4 BHK units are priced from around ₹3.2 crore onwards.

What is the expected possession date?

The expected possession for Prestige Camden Gardens is around December 2027.

How many units are there in the project?

Prestige Camden Gardens is a low-density project with approximately 120 exclusive apartments, ensuring privacy and a premium lifestyle.

How far is Manyata Tech Park from the project?

Manyata Tech Park is located approximately 1 km away, making it highly convenient for working professionals.

Are there schools and hospitals nearby?

Yes, several reputed schools, hospitals, and daily convenience stores are located within a short distance of the project.

Similar Projects Nearby

Other projects you might like in Thanisandra Main Road, Bengaluru

See all in North Bengaluru

Explore More on BookNewProperty

Continue your search with these related projects, locations and topics.

₹3.32 Cr Onwards
Enquire About Prestige Camden Gardens

Get a callback within 30 minutes with pricing & availability.

Secure 30 min callback No spam