A 72-plot villa layout on 4.55 acres at Volagere Kallahalli, the fifth K-RERA registration in Geown’s Oasis enclave off Sarjapur Road. Plots run from about 1,000 to 2,740 Sq.Ft., with the layout due by December 2028.
- Developer
- Geown Casper Properties
- Price from
- ₹1.08 Cr
- Homes
- Residential Plots
- Possession
- December 2028
- Site area
- 4.55 Acres
- Total homes
- 72 Plots
- RERA number
- PRM/KA/RERA/1251/308/PR/231026/009037
Geown Oasis Phase 4 suits a buyer who wants a villa plot inside an established gated enclave near Sarjapura and values a developer with a delivered track record in the same location. The trade-offs are a high land rate of about ₹9,000 per Sq.Ft., no metro within 10 km, a layout that will not be ready until December 2028, and community amenities that belong to the older phases rather than this one.
- Fifth K-RERA registration in the same Oasis enclave; the developer lists Phases 1 and 2 as completed
- No borrowing, mortgage or land litigation declared in the filing
- 40 of the 72 plots are regular 30×40 or 30×50 sites, which suit standard villa designs
- No metro station within 10 km; Sarjapura is served by buses and the Sarjapur Road traffic corridor
- About ₹9,000 per Sq.Ft. for a 30×40 site is steep for a village layout 3 km beyond Sarjapura town
- Land only, with 0% development at registration: the layout is due December 2028 and you build your villa after that
About Geown Oasis Phase 4
Geown Oasis Phase 4 is a 72-plot residential layout on survey numbers 121/3 and 122 of Volagere Kallahalli village, in Sarjapura hobli of Anekal taluk. The site is about 3 km from Sarjapura town and extends Geown’s existing Oasis villa enclave, where Phases 1, 2, 2A and 3 have already been registered with K-RERA. Phase 4 itself covers 4.55 acres and was registered on 23 October 2026.
The filed layout gives 48% of the land to plots, 37% to roads, 10% to two parks and 5% to one civic amenity site. Of the 72 plots, 33 are 30×40 (1,199 Sq.Ft.), seven are 30×50 (1,499 Sq.Ft.), two measure 12.19 × 9.65 m (1,266 Sq.Ft.) and the other 30 are odd-shaped, from 1,004 to 2,738 Sq.Ft. You buy the land and build your own villa once roads, drains, power lines and plantation are in place.
The developer prices plots from ₹1.08 Cr, which works out to roughly ₹9,000 per Sq.Ft. for a 30×40 site. The filing puts the total project cost at ₹18.70 Cr, of which land is ₹9.87 Cr. Work had not begun at registration; the schedule runs from plot formation in late 2026 to final works by 31 December 2028.
The land is held under joint development agreements, with landowner shares filed at 35% for 121/3 and 40% for 122, so part of the inventory belongs to the landowners. No borrowing or litigation is declared, and the escrow account is with Axis Bank. Water is to come from the Yamare Grama Panchayat.
Geown Oasis Phase 4 price list and sizes
Geown Oasis Phase 4 prices start at ₹1.08 Cr for the 30×40 Plot.
| Home type | Size | Price | Cost sheet |
|---|---|---|---|
| 30×40 PlotAvailable | 1,199 Sq.Ft. (9.14 × 12.19 m) – 33 plots | ₹1.08 Cr onwards | Cost sheet |
| 30×50 PlotAvailable | 1,499 Sq.Ft. (9.14 × 15.24 m) – 7 plots | — | Cost sheet |
| 40×32 PlotAvailable | 1,266 Sq.Ft. (12.19 × 9.65 m) – 2 plots | — | Cost sheet |
| Odd-shaped PlotAvailable | 1,004 – 2,738 Sq.Ft. – 30 plots | — | Cost sheet |
Unit Schedule Filed with K-RERA
These figures are from the plot schedule filed with Karnataka RERA, converted from square metres (1 sq m = 10.7639 Sq.Ft.). Plots carry no balcony or built-up area, so loading does not apply.
| Plot type | Plots | Size | Dimensions |
|---|---|---|---|
| 30×40 | 33 | 1,199 Sq.Ft. | 9.14 × 12.19 m |
| 30×50 | 7 | 1,499 Sq.Ft. | 9.14 × 15.24 m |
| 40×32 | 2 | 1,266 Sq.Ft. | 12.19 × 9.65 m |
| Odd-shaped | 30 | 1,004 – 2,738 Sq.Ft. | Irregular |
| Total | 72 | 95,411 Sq.Ft. | 8,864 sq m |
The developer markets three sizes: 30×40 (1,200 Sq.Ft.), 30×50 (1,500 Sq.Ft.) and 40×40 (1,600+ Sq.Ft.). The filing has no 40×40 plot. Four odd-shaped plots are smaller than 1,200 Sq.Ft., the smallest being 1,004 Sq.Ft., and the largest corner plot is 2,738 Sq.Ft.
Geown Oasis Phase 4 amenities
Geown Oasis Phase 4 lists 15 amenities, including clubhouse (existing oasis enclave), swimming pool (existing oasis enclave), gymnasium, tennis court and indoor badminton.
Sports and fitness
- Gymnasium
- Tennis Court
- Indoor Badminton
- Basketball Court
- Table Tennis
Pools and wellness
- Swimming Pool (existing Oasis enclave)
- Steam and Sauna
Kids, seniors and pets
- Kids Play Area
- Toddler Area
Clubhouse and leisure
- Clubhouse (existing Oasis enclave)
- Party Hall
- Library
Green and outdoor spaces
- Two Parks in Phase 4
Safety and convenience
- Rainwater Harvesting
- 24/7 Security
Density, Parks and Open Space
With 72 plots on 4.55 acres, the layout works out to about 15.8 plots per acre. The two parks total 1,847 sq m, or 10% of the land, which is roughly 276 Sq.Ft. of park per plot. Roads take 37% of the land and the single civic amenity site another 5%.
The developer’s page speaks of a 25-acre master community with 60% open green space. That describes the whole Oasis enclave across all phases. Within Phase 4 alone, open area including roads is 52% of the land, and green parks are 10%.
How the Distances Were Worked Out
Distances on this page are straight-line distances from the coordinates in the K-RERA filing (12.882644, 77.782104), multiplied by 1.3 to allow for road routing, and rounded to one decimal place. Landmarks were located on OpenStreetMap through the Photon and Overpass services, and only places within 10 km are listed.
The developer quotes Wipro HQ at about 4 km, RGA Tech Park at about 6 km and Manipal Hospital at about 8 km. On the same method these come out at about 14 km, 11 km and 17 km respectively, so they are left out of the list above.
Geown Oasis Phase 4 location and nearby places
Geown Oasis Phase 4 is in Volagere Kallahalli, Sarjapur Road, Bengaluru. Sarjapura Bus Stand is 3.1 km away; Dommasandra Circle is 4.2 km away. For daily life, the nearest hospital is Sarjapura Urban Primary Health Centre (3.2 km) and the nearest school is The International School Bangalore (TISB) (4.1 km). Distances are approximate road distances.
Transit near Geown Oasis Phase 4
- Sarjapura Bus StandNearest3.1 km
- Dommasandra Circle4.2 km
Schools near Geown Oasis Phase 4
- The International School Bangalore (TISB)Nearest4.1 km
- Oakridge International School4.2 km
- Global Indian International School5.4 km
- Inventure Academy5.7 km
- Indus International School7.1 km
- Delhi Public School Bangalore East8.2 km
Hospitals near Geown Oasis Phase 4
- Sarjapura Urban Primary Health CentreNearest3.2 km
- Town HospitalSarjapura3.4 km
- Swastik HospitalDommasandra4.6 km
Leisure near Geown Oasis Phase 4
- Sarjapura LakeNearest4.5 km
- Kodathi Kere8.6 km
Infrastructure near Geown Oasis Phase 4
- Sarjapura town centreNearest3.3 km
- Varthur9.7 km
Approximate road distances from the project gate.
Check travel time from Geown Oasis Phase 4
About the developer, Geown Casper Properties
Geown Casper Properties Pvt Ltd was incorporated in 2012 and is based in HSR Layout. Its managing director is Amit Gupta, and the board has four directors. It markets its projects as Geown Properties.
K-RERA lists four earlier registrations for the company, all in the same enclave: Geown Oasis (PRM/KA/RERA/1251/308/PR/180406/001489, April 2018), Geown Oasis Phase 2 (PRM/KA/RERA/1251/308/PR/210208/003878, February 2021), Geown Oasis Phase 3 (PRM/KA/RERA/1251/308/PR/071122/005417, November 2022) and Geown Oasis Phase 2A (PRM/KA/RERA/1251/308/PR/291225/008360, December 2025). The developer’s site also lists Geown Lawnsway, Geown Mist, Geown Homestead and Geown Breeze, a plotted project at Malur.
K-RERA records six complaints against the promoter, all filed between 2021 and 2023 about the first Oasis phase. They cover breach of the sale agreement, construction quality, a deviation from the sanctioned plan and seepage, and all six are shown as disposed. None has been filed against Phase 4.
Geown Oasis Phase 4 home loan EMI
Pick a home type to see the monthly EMI on an 80% home loan, or adjust the loan, rate and tenure.
8.5% is a starting assumption; use the rate your bank offers you. During construction you usually pay only interest (pre-EMI) on the amount the bank has released; the full EMI starts after possession.
The 30×40 Plot needs a household take-home of about ₹1.87 L a month
Banks usually keep all your EMIs within about 40% of take-home pay. These figures assume an 80% loan at 8.5% for 20 years, and no other loans. You also need about ₹21.6 L upfront for the 30×40 Plot.
- 30×40 PlotEMI ₹75,000 a month · upfront ₹21.6 L₹1.87 L/month
Geown Oasis Phase 4 RERA registration
| RERA number | PRM/KA/RERA/1251/308/PR/231026/009037 |
|---|---|
| RERA status | Approved |
| K-RERA Acknowledgement No. | ACK/KA/RERA/1251/308/PR/310826/010557 |
| Registration Date | 23 October 2026 |
| Promoter Entity | Geown Casper Properties Pvt Ltd, incorporated 2012 |
| Plan Approved By | Anekal Planning Authority, 29 June 2026 |
| Approved Plan No. | LAO/185/2025-26 |
| Survey Numbers | 121/3 and 122, Volagere Kallahalli, Sarjapura hobli, Anekal taluk |
| Plot Area | 8,864 sq m, 48% of the land |
| Parks and Open Space | 2 parks, 1,847 sq m, 10% of the land |
| Civic Amenity Site | 1 site, 927 sq m |
| Roads | 6,775 sq m, 37% of the land |
| Project Cost Filed | ₹18.70 Cr |
| Land Cost Filed | ₹9.87 Cr |
| Development Cost Filed | ₹8.83 Cr |
| Work Completed | 0% at registration |
| Development Start | 27 August 2026 |
| Land Holding | Joint development; landowner shares filed at 35% and 40% |
| Khata | Not issued; filed as 0 for both survey numbers |
| Borrowing Declared | None |
| Litigation Declared | None |
| Escrow Bank | Axis Bank, MICO Layout |
| Water Source | Yamare Grama Panchayat |
| Complaints on K-RERA | 6 on the promoter, all disposed; none on this phase |
Source Notes
- Plot count, sizes, land split, costs, dates, landowner shares, khata, borrowing and litigation answers, escrow bank and complaint history are from the K-RERA filing for PRM/KA/RERA/1251/308/PR/231026/009037.
- The starting price of ₹1.08 Cr, the amenity list and the 25-acre enclave figure are from the developer’s Phase 4 page on geownproperties.com. The ₹9,000 per Sq.Ft. figure divides that price by a 1,200 Sq.Ft. 30×40 plot.
- Conflict: the developer’s page gives PRM/KA/RERA/1251/308/PR/180406/001489 as the RERA number. That registration is the original Geown Oasis from April 2018; Phase 4 has its own number, ending 009037.
- Conflict: the developer advertises 75 plots; the filing has 72.
- Conflict: the developer lists a 40×40 size of 1,600+ Sq.Ft.; the filing has no such plot, and four plots are below the advertised 1,200 Sq.Ft. minimum.
- Conflict: the advertised pool, clubhouse, courts and party hall are not part of the Phase 4 filing, which provides two parks and one civic amenity site.
- Conflict: the page calls the project “launching soon” and invites expressions of interest, while it has been registered since 23 October 2026.
- The land deeds add up to 4 acres 24 guntas (about 4.6 acres); the filed land area is 18,413 sq m, or 4.55 acres. This page uses the filed land area.
- The featured image is an aerial render from the developer’s Phase 4 page.
Geown Oasis Phase 4 timeline
Keys are about 2 years away
K-RERA registration in Oct 2026; possession is due in Dec 2028. The wait has only just begun.
- K-RERA registration
Phase 4 registered as PRM/KA/RERA/1251/308/PR/231026/009037, with completion due 31 December 2028.
- Development start date filed
The filing gives 27 August 2026 as the start of plot formation, with 0% work done at registration.
- Layout plan approved
Anekal Planning Authority approved the 72-plot layout under LAO/185/2025-26.
- Geown Oasis Phase 2A registered
Phase 2A registered as PRM/KA/RERA/1251/308/PR/291225/008360.
- Geown Oasis Phase 3 registered
Phase 3 villas registered as PRM/KA/RERA/1251/308/PR/071122/005417.
- Geown Oasis Phase 1 registered
The first Oasis phase was registered with K-RERA as PRM/KA/RERA/1251/308/PR/180406/001489.
What to Verify Before You Commit
- Confirm the sale agreement carries RERA number PRM/KA/RERA/1251/308/PR/231026/009037, not the Phase 1 number used in marketing.
- Check whether your plot falls in the developer’s share or the landowners’ share under the two joint development agreements.
- Get the right to use the existing Oasis clubhouse, pool and courts written into the agreement, along with any membership or maintenance charges.
- Ask for the khata status, since both survey numbers were filed with khata number 0.
- Match the plot dimensions in the agreement with the filed schedule, especially for odd-shaped and corner plots.
- Pay only into the Axis Bank escrow account named in the filing.
- Read the six disposed K-RERA complaints from Phase 1 to see how the developer resolved them.
Geown Oasis Phase 4 review: is it a good buy?
Strong on density.
- Developer record6.0Limited published delivery record
- Location and daily needs6.8Nearest daily needs 3.1 to 4.1 km away; no shops found within 10 km
- Space and density9.0About 16 homes per acre
- Time to move in7.0Possession December 2028, about 2 years away
- Amenities7.015 amenities listed
Not scored yet: value for money (villas and plots are not compared yet); paperwork and risk (not enough filing details on this page yet). The score is worked out from the other parts.
How the BNP Score works
The BNP Score is our own rating, worked out with the same rules for every project from its RERA filing, its price list and our own research. It has seven parts: value for money (20%), the price per Sq.Ft. against nearby projects, adjusted for how much of what you pay for is carpet area; developer record (20%), from published delivery figures; location and daily needs (20%); paperwork and risk (15%), from land ownership, declared litigation, water source and payment plan; space and density (10%); time to move in (10%); and clubhouse space per home (5%). When a part has no published data, we leave it out and say so rather than guess. We only score projects approved under RERA. It is a starting point for comparison, not financial advice.
Geown Oasis Phase 4 suits a buyer who wants a villa plot inside an established gated enclave near Sarjapura and values a developer with a delivered track record in the same location. The trade-offs are a high land rate of about ₹9,000 per Sq.Ft., no metro within 10 km, a layout that will not be ready until December 2028, and community amenities that belong to the older phases rather than this one. The complaint history from Phase 1 is worth reading, and the plot you pick should be on the developer’s share of the joint development, not the landowners’.
Pros
- Fifth K-RERA registration in the same Oasis enclave; the developer lists Phases 1 and 2 as completed
- No borrowing, mortgage or land litigation declared in the filing
- 40 of the 72 plots are regular 30×40 or 30×50 sites, which suit standard villa designs
- A published entry price of ₹1.08 Cr on the developer’s own site
- Four international schools, including TISB and Oakridge, within about 6 km
- Layout approved by the Anekal Planning Authority and the land converted to residential use in 2025
Cons
- No metro station within 10 km; Sarjapura is served by buses and the Sarjapur Road traffic corridor
- About ₹9,000 per Sq.Ft. for a 30×40 site is steep for a village layout 3 km beyond Sarjapura town
- Land only, with 0% development at registration: the layout is due December 2028 and you build your villa after that
- K-RERA shows 6 complaints against the promoter from the first Oasis phase, on agreement breaches, quality and seepage, all disposed
- Parks are just 10% of the land and the phase has a single civic amenity site; the pool and clubhouse sit in the older phases
- The marketing page quotes the 2018 Phase 1 RERA number and 75 plots instead of this phase’s 72
- No khata had been issued for either survey number at registration
3 of 3 daily needs are a short drive away
The nearest is transport at 3.1 km and the farthest is education at 4.1 km.
- TransportSarjapura Bus Stand3.1 km
- HealthcareSarjapura Urban Primary Health Centre3.2 km
- EducationThe International School Bangalore (TISB)4.1 km
Geown Oasis Phase 4 FAQs
What is the RERA number of Geown Oasis Phase 4?
It is PRM/KA/RERA/1251/308/PR/231026/009037, registered on 23 October 2026. The number shown on the developer’s marketing page, ending 001489, belongs to the first Oasis phase from 2018.
How many plots are there and what sizes?
The filing lists 72 plots on 4.55 acres: 33 of 1,199 Sq.Ft., seven of 1,499 Sq.Ft., two of 1,266 Sq.Ft. and 30 odd-shaped plots from 1,004 to 2,738 Sq.Ft.
What is the price of plots in Geown Oasis Phase 4?
The developer advertises plots from ₹1.08 Cr onwards, depending on size and orientation. That is about ₹9,000 per Sq.Ft. for a 30×40 site.
When will the layout be completed?
The K-RERA completion date is 31 December 2028. Development had not started at registration.
Where exactly is the project?
It is on survey numbers 121/3 and 122 of Volagere Kallahalli, Sarjapura hobli, Anekal taluk, about 3 km from Sarjapura town and 4 km from Dommasandra Circle.
Is there a metro nearby?
No. There is no operational or under-construction metro station within 10 km. The nearest public transport hub is Sarjapura Bus Stand, about 3 km away.
Do plot owners get the clubhouse and pool?
The developer says Phase 4 owners will have access to the existing Oasis clubhouse, pool and courts. The Phase 4 filing itself covers only two parks and one civic amenity site, so the access right should be written into the sale agreement.
Has the developer faced complaints?
K-RERA shows six complaints against the promoter, all about the first Oasis phase and all disposed. There are none against Phase 4.
Compare Geown Oasis Phase 4
Projects near Geown Oasis Phase 4
16 listed projects are within 5 km of Geown Oasis Phase 4. The closest shown here is Garden Breeze at The Prestige City, about 0.6 km away.






Distances are straight-line from the project's map location; road distance is usually 20 to 40% longer.
Latest news
Recent news on Bengaluru and Karnataka.
- Embassy One Residences Launched at Mekhri Circle: 59 Homes, Sizes and RERA Status
- Arvind Codename Golden Harvest in Devanahalli, Bengaluru: RERA Number and What We Know
- Karnataka Plans a Fresh Guidance Value Revision; Property Registration in Bengaluru Could Cost More
- Puravankara Signs Six Bengaluru Land Deals in FY27, Latest 12.76 Acres at Sathanur
- Assetz and Fairlark Propose 1,460 Homes on 10 Acres at Aerospace Park, Bengaluru
- Arvind Orchards Phase 3 EOI Opens at ₹8,750 per Sq.Ft. in Devanahalli, Bengaluru
See also
Buyer guides
Ask anything about this project. Our research team replies with what the filings show.